IP Library Granted Patent US 8,882,427
Granted Patent B2
US 8,882,427 · App. 13/201,672 · Granted Nov 11, 2014

Method and device for hoisting an item by means of a crane

Inventor: Yngvar Borøy (Songe, NO)
Assignee: National Oilwell Varco Norway AS
B66C13/04B63B27/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,882,427
App. No.
13/201,672
Granted
Nov 11, 2014
Kind
B2
Abstract

A method and a device for hoisting an item at sea with a hoisting device comprises moving the item between a plurality of different height levels. In addition, the method comprises alternately supporting the load of the item with a first hoisting rope and a second hoisting rope while moving the item between the plurality of different height levels. Further, the method comprises arranging the first hoisting rope and the second hoisting rope to extend in parallel along at least part of the distance between the item and the hoisting device. Still further, the method comprises releasably connecting the first hoisting rope to the second hoisting rope. Moreover, the method comprises suspending the second hoisting rope from a hanger when the second hoisting rope is supporting the load of the item. The method also comprises connecting the hanger to an arm of the hoisting device.

Claims (50)

1. A device for hoisting an item at sea, comprising;

a hoisting device including a crane having a crane arm and a hanger pivotally coupled to the crane arm;

a first hoisting rope extending from the crane arm;

a second hoisting rope configured to releasably connect to the hanger;

wherein the first hoisting rope is configured to releasably connect to the second hoisting rope;

wherein the second hoisting rope passes over a sheave suspended from the crane arm, wherein the sheave is coupled to a winch

wherein the first hoisting rope has a first position releasably connected to the second hoisting rope and a second position moveably coupled to the second hoisting rope.

2. The device in accordance with claim 1 , wherein the first hoisting rope is releasably connected to the second hoisting rope with a connector disposed along the second hoisting rope.

3. The device in accordance with claim 2 , wherein the connector is structured to fit into the hanger.

4. The device in accordance with claim 1 , wherein a plurality of consecutive rope lengths are joined to form the second hoisting rope.

5. The device in accordance with claim 1 , wherein the second hoisting rope has a first position releasably connected to the hanger and a second position moveably coupled to the hanger.

6. The device in accordance with claim 5 , wherein the first hoisting rope supports the weight of the item when the first hoisting rope is in the first position and the second hoisting rope is in the second position; and

wherein the second hoisting rope supports the weight of the item when the first hoisting rope is in the second position and the second hoisting rope is in the first position.

7. The device in accordance with claim 1 , wherein the hanger is pivotally connected to a jib of the crane arm.

8. The device in accordance with claim 1 , wherein the sheave is suspended from a pivotal connector coupled to the arm of the hoisting device, and the hanger is coupled to the pivotal connector.

9. A method for lowering an item subsea, comprising:

(a) extending a first hoisting rope from a hoisting device;

(b) pivotally coupling a hanger to the hoisting device;

(c) moveably coupling a second hoisting rope to the hanger, wherein the second hoisting rope passes over a sheave suspended from a winch coupled to the hoisting device;

(d) releasably securing the first hoisting rope to the second hoisting rope and supporting the weight of the item with the first hoisting rope;

(e) lowering the item subsea during (d);

(f) releasably securing the second hoisting rope to the hanger and supporting the weight of the item with the second hoisting rope after (d) and (e); and

(g) moving the first hoisting rope along the second hoisting rope during (f).

10. The method in accordance with claim 9 , further comprising:

(h) releasably securing the first hoisting rope to the second hoisting rope and supporting the weight of the item with the first hoisting rope after (g); and

(i) lowering the item subsea during (h).

11. The method in accordance with claim 10 , wherein the first hoisting rope is connected to a lock that releasably engages a connector disposed along the second hoisting rope to secure the first hoisting rope to the second hoisting rope.

12. The method in accordance with claim 11 , wherein the connector engages the hanger to releasably secure the second hoisting rope to the hanger.

13. The method in accordance with claim 9 , further comprising:

increasing the length of the portion of the first hoisting rope extending from the hoisting device during (e); and

increasing the length of the portion of the second hoisting rope extending from the hanger during (e).

14. The method in accordance with claim 10 , further comprising repeating (a) thru (i).

15. A method for hoisting an item at sea with a hoisting device, the method comprising:

moving the item between a plurality of different height levels;

alternately supporting the load of the item with a first hoisting rope and a second hoisting rope while moving the item between the plurality of different height levels;

arranging the first hoisting rope and the second hoisting rope to extend in parallel along at least part of the distance between the item and the hoisting device;

releasably connecting the first hoisting rope to the second hoisting rope;

suspending the second hoisting rope from a hanger when the second hoisting rope is supporting the load of the item;

pivotally connecting the hanger to an arm of the hoisting device; and passing the second hoisting rope over a sheave suspended from the arm of the hoisting device, wherein the sheave is coupled to a winch;

wherein the second hoisting rope extends through the hanger.

16. The method in accordance with claim 15 , wherein the sheave is suspended from a pivotal connector coupled to the arm of the hoisting device, and the hanger is coupled to the pivotal connector.

17. The method in accordance with claim 15 , further comprising:

connecting the second hoisting rope directly to the item or via a leading device;

connecting the first hoisting rope to a first position on the second hoisting rope;

moving the item between a pair of different height levels whilst the first hoisting rope and a portion of the second hoisting rope extending between the first position and the item are supporting the load of the item;

transferring the load of the item from the first hoisting rope to the second hoisting rope after suspending the second hoisting rope from the hanger;

moving the connection between the first hoisting rope and the second hoisting rope to a second position on the second hoisting rope;

transferring the load of the item to the first hoisting rope and the portion of the second hoisting rope extending between the second position and the item; and

moving the item between a pair different height levels after releasing the second hoisting rope from the hanger.

18. The method in accordance with claim 15 , further comprising connecting the hanger to a jib of the crane.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 7, 2023
From: NOV INTERNATIONAL HOLDINGS C.V.
To: GRANT PRIDECO, INC.
Reel/Frame 063888/0818 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 2, 2023
From: NATIONAL OILWELL VARCO NORWAY AS
To: NOV INTERNATIONAL HOLDINGS C.V.
Reel/Frame 064367/0415 →
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE NAME PREVIOUSLY RECORDED ON REEL 027155 FRAME 0631. ASSIGNOR(S) HEREBY CONFIRMS THE CORRECTIVE ASSIGNMENT TO CORRECT ASSIGNEE NAME IN PREVIOUSLY RECORDED ASSIGNMENT. Recorded Oct 1, 2014
From: BOROY, YNGVAR
To: NATIONAL OILWELL VARCO NORWAY AS
Reel/Frame 033880/0626 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 1, 2011
From: BOROY, YNGVAR
To: NATIONAL OILWELL VARCO AS
Reel/Frame 027155/0631 →
Priority Claims (1)
NO 20090729 · Feb 16, 2009 · national
Continuity (1)
Related Publication 20120034061A1 · Feb 9, 2012