IP Library Granted Patent US 9,017,494
Granted Patent B2
US 9,017,494 · App. 13/212,400 · Granted Apr 28, 2015

Method for producing seamless steel pipe for oil wells excellent in sulfide stress cracking resistance

Inventors: Yuji Arai (Amagasaki, JP); Tomohiko Omura (Kishiwada, JP); Keiichi Nakamura (Wakayama, JP)
Assignee: Nippon Steel & Sumitomo Metal Corporation
C21D8/105C21D1/18C21D8/10C21D9/08C21D9/085C22C38/02C22C38/04C22C38/22C21D2211/008
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,017,494
App. No.
13/212,400
Granted
Apr 28, 2015
Kind
B2
Abstract

A high-strength seamless steel pipe for oil wells excellent in sulfide stress cracking resistance which comprises, on the percent by mass basis, C: 0.1 to 0.20%, Si: 0.05 to 1.0%, Mn: 0.05 to 1.0%, Cr: 0.05 to 1.5%, Mo: 0.05 to 1.0%, Al: 0.10% or less, Ti: 0.002 to 0.05% and B: 0.0003 to 0.005%, with a value of equation “C+(Mn/6)+(Cr/5)+(Mo/3)” of 0.43 or more, with the balance being Fe and impurities, and in the impurities P: 0.025% or less, S: 0.010% or less and N: 0.007% or less. The seamless steel pipe may contain a specified amount of one or more element(s) of V and Nb, and/or a specified amount of one or more element(s) of Ca, Mg and REM. The seamless steel pipe can be produced at a low cost by adapting an in-line tube making and heat treatment process having a high production efficiency since a reheating treatment for refinement of grains is not required.

Claims (20)

1. A method for producing a seamless steel pipe for oil wells, which comprises the steps of making a pipe by hot-piercing a steel billet having a chemical composition consisting of, on the percent by mass basis, C: 0.1 to 0.20%, Si: 0.05 to 1.0%, Mn: 0.05 to 1.0%, Cr: 0.05 to 1.5%, Mo: 0.05 to 1.0%, Al: 0.10% or less, Ti: 0.002 to 0.05% and B: 0.0003 to 0.005%, with the balance being Fe and impurities, and in the impurities P: 0.025% or less, S: 0.010% or less and N: 0.007% or less, with a value of A determined by the following equation (1) of 0.43 or more followed by elongating and rolling, and then finally rolling at a final rolling temperature adjusted to the Ar 3 transformation point to 1100 degrees centigrade, then following the final rolling step, the finally rolled steel pipe is assistantly heated in a temperature range from the Ar 3 transformation point to 1000 degrees centigrade in-line before the surface temperature becomes lower than the Ar 3 transformation point, and then the assistantly heated pipe is quenched from a temperature of the Ar 3 transformation point or higher and then tempered at a temperature lower than the Ac 1 transformation point, while keeping the pipe at a temperature of the Ar 3 transformation point or higher from tube-making to quenching:

A =C+(Mn/6)+(Cr/5)+(Mo/3)  (1),

wherein, in the equation (1), C, Mn, Cr and Mo each represent % by mass of the respective elements.

2. The method for producing a seamless steel pipe for oil wells according to claim 1 , wherein the temperature of assistant heating in-line is the Ac 3 transformation point to 1000 degrees centigrade.

3. The method for producing a seamless steel pipe for oil wells according to claim 1 , wherein the tensile strength is not more than 931 MPa.

4. A method for producing a seamless steel pipe for oil wells, which comprises the steps of making a pipe by hot-piercing a steel billet having a chemical composition consisting of, on the percent by mass basis, C: 0.1 to 0.20%, Si: 0.05 to 1.0%, Mn: 0.05 to 1.0%, Cr: 0.05 to 1.5%, Mo: 0.05 to 1.0%, Al: 0.10% or less, Ti: 0.002 to 0.05%, B: 0.0003 to 0.005%, and V: 0.03 to 0.2%, with the balance being Fe and impurities, and in the impurities P: 0.025% or less, S: 0.010% or less and N: 0.007% or less, with a value of A determined by the following equation (1) of 0.43 or more followed by elongating and rolling, and then finally rolling at a final rolling temperature adjusted to the Ar 3 transformation point to 1100 degrees centigrade, then following the final rolling step, the finally rolled steel pipe is assistantly heated in a temperature range from the Ar 3 transformation point to 1000 degrees centigrade in-line before the surface temperature becomes lower than the Ar 3 transformation point, and then the assistantly heated pipe is quenched from a temperature of the Ar 3 transformation point or higher and then tempered at a temperature lower than the Ac 1 transformation point, while keeping the pipe at a temperature of the Ar 3 transformation point or higher from tube-making to quenching:

A =C+(Mn/6)+(Cr/5)+(Mo/3)  (1),

wherein, in the equation (1), C, Mn, Cr and Mo each represent % by mass of the respective elements.

5. The method for producing a seamless steel pipe for oil wells according to claim 4 , wherein the tensile strength is not more than 931 MPa.

6. The method for producing a seamless steel pipe for oil wells according to claim 4 , wherein the temperature of assistant heating in-line is the Ac 3 transformation point to 1000 degrees centigrade.

7. A method for producing a seamless steel pipe for oil wells, which comprises the steps of making a pipe by hot-piercing a steel billet having a chemical composition consisting of, on the percent by mass basis, C: 0.1 to 0.20%, Si: 0.05 to 1.0%, Mn: 0.05 to 1.0%, Cr: 0.05 to 1.5%, Mo: 0.05 to 1.0%, Al: 0.10% or less, Ti: 0.002 to 0.05%, B: 0.0003 to 0.005%, and one or more element(s) selected from a group of Ca of 0.0003 to 0.005%, Mg of 0.0003 to 0.005% and REM of 0.0003 to 0.005%, with the balance being Fe and impurities, and in the impurities P: 0.025% or less, S: 0.010% or less and N: 0.007% or less, with a value of A determined by the following equation (1) of 0.43 or more followed by elongating and rolling, and then finally rolling at a final rolling temperature adjusted to the Ar 3 transformation point to 1100 degrees centigrade, then following the final rolling step, the finally rolled steel pipe is assistantly heated in a temperature range from the Ar 3 transformation point to 1000 degrees centigrade in-line before the surface temperature becomes lower than the Ar 3 transformation point, and then the assistantly heated pipe is quenched from a temperature of the Ar 3 transformation point or higher and then tempered at a temperature lower than the Ac 1 transformation point, while keeping the pipe at a temperature of the Ar 3 transformation point or higher from tube-making to quenching:

A =C+(Mn/6)+(Cr/5)+(Mo/3)  (1),

wherein, in the equation (1), C, Mn, Cr and Mo each represent % by mass of the respective elements.

8. The method for producing a seamless steel pipe for oil wells according to claim 7 , wherein the tensile strength is not more than 931 MPa.

9. The method for producing a seamless steel pipe for oil wells according to claim 7 , wherein the temperature of assistant heating in-line is the Ac 3 transformation point to 1000 degrees centigrade.

10. A method for producing a seamless steel pipe for oil wells, which comprises the steps of making a pipe by hot-piercing a steel billet having a chemical composition consisting of, on the percent by mass basis, C: 0.1 to 0.20%, Si: 0.05 to 1.0%, Mn: 0.05 to 1.0%, Cr: 0.05 to 1.5%, Mo: 0.05 to 1.0%, Al: 0.10% or less, Ti: 0.002 to 0.05%, B: 0.0003 to 0.005%, V: 0.03 to 0.2%, and one or more element(s) selected from a group of Ca of 0.0003 to 0.005%, Mg of 0.0003 to 0.005% and REM of 0.0003 to 0.005%, with the balance being Fe and impurities, and in the impurities P: 0.025% or less, S: 0.010% or less and N: 0.007% or less, with a value of A determined by the following equation (1) of 0.43 or more followed by elongating and rolling, and then finally rolling at a final rolling temperature adjusted to the Ar 3 transformation point to 1100 degrees centigrade, then following the final rolling step, the finally rolled steel pipe is assistantly heated in a temperature range from the Ar 3 transformation point to 1000 degrees centigrade in-line before the surface temperature becomes lower than the Ar 3 transformation point, and then the assistantly heated pipe is quenched from a temperature of the Ar 3 transformation point or higher and then tempered at a temperature lower than the Ac 1 transformation point, while keeping the pipe at a temperature of the Ar 3 transformation point or higher from tube-making to quenching:

A =C+(Mn/6)+(Cr/5)+(Mo/3)  (1),

wherein, in the equation (1), C, Mn, Cr and Mo each represent % by mass of the respective elements.

11. The method for producing a seamless steel pipe for oil wells according to claim 10 , wherein the tensile strength is not more than 931 MPa.

12. The method for producing a seamless steel pipe for oil wells according to claim 10 , wherein the temperature of assistant heating in-line is the Ac 3 transformation point to 1000 degrees centigrade.

Assignments (2)
CHANGE OF NAME Recorded May 14, 2019
From: NIPPON STEEL & SUMITOMO METAL CORPORATION
To: NIPPON STEEL CORPORATION
Reel/Frame 049257/0828 →
MERGER Recorded Mar 15, 2013
From: SUMITOMO METAL INDUSTRIES, LTD.
To: NIPPON STEEL & SUMITOMO METAL CORPORATION
Reel/Frame 030018/0455 →
Priority Claims (1)
JP 2004-023470 · Jan 30, 2004 · national
Continuity (3)
Division 11494608 · Jul 28, 2006
Continuation PCTJP2005001186 · Jan 28, 2005
Related Publication 20110297279A1 · Dec 8, 2011