IP Library Granted Patent US 8,893,788
Granted Patent B2
US 8,893,788 · App. 13/234,853 · Granted Nov 25, 2014

Enhanced permeability subterranean fluid recovery system and methods

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,893,788
App. No.
13/234,853
Granted
Nov 25, 2014
Kind
B2
Abstract

A system for recovering a fluid from a subterranean formation, including a production wellbore having a substantially horizontal production length extending through the formation, and a trench extending through the formation. A method of constructing a trench section in a subterranean formation, including providing within the formation an access wellbore having a substantially horizontal access wellbore length, introducing a trench cutting tool into the access wellbore, and advancing and retracting the trench cutting tool through the access wellbore in order to cut slots in the formation in a trench direction away from the access wellbore, repeatedly until a number of slots required to complete the trench section has been cut.

Claims (33)

1. A system for recovering a fluid from a subterranean formation, the system comprising:

(a) a production wellbore comprising a substantially horizontal production length which extends through the formation at a production length elevation;

(b) a trench extending through the formation, wherein the trench has an upper trench edge, a lower trench edge and a trench length, wherein the upper trench edge is higher than the lower trench eche wherein the trench is substantially planar, and wherein the upper trench edge, the lower trench edge and the trench length define a trench plane; and

(c) an injection wellbore comprising a substantially horizontal injection length which extends through the formation at an injection length elevation and wherein the injection length elevation is higher than the production length elevation.

2. The system as claimed in claim 1 wherein the production length and the trench plane are substantially parallel.

3. The system as claimed in claim 2 wherein the trench plane is substantially vertical.

4. The system as claimed in claim 2 wherein the production length is offset laterally from the trench plane.

5. The system as claimed in claim 2 wherein at least a portion of the production length is located within the trench.

6. The system as claimed in claim 2 wherein the trench length extends uninterrupted along a portion of the production length.

7. The system as claimed in claim 6 wherein the formation has a formation thickness and wherein the trench extends through a portion of the formation thickness.

8. The system as claimed in claim 6 wherein the formation has a formation thickness and wherein the trench extends through substantially the entire formation thickness.

9. The system as claimed in claim 2 wherein the trench length extends uninterrupted along substantially the entire production length.

10. The system as claimed in claim 9 wherein the formation has a formation thickness and wherein the trench extends through a portion of the formation thickness.

11. The system as claimed in claim 9 wherein the formation has a formation thickness and wherein the trench extends through substantially the entire formation thickness.

12. The system as claimed in claim 1 wherein the trench is substantially filled with an unconsolidated material.

13. The system as claimed in claim 1 wherein the formation is comprised of a permeability barrier and wherein the trench extends through the permeability barrier.

14. The system as claimed in claim 1 wherein the formation has a formation permeability and wherein the formation permeability is heterogeneous.

15. The system as claimed in claim 1 wherein the production length and the injection length are substantially parallel.

16. The system as claimed in claim 1 wherein the production length, the injection length and the trench plane are substantially parallel.

17. The system as claimed in claim 16 wherein the trench plane is substantially vertical.

18. The system as claimed in claim 16 wherein the production length is offset laterally from the trench plane.

19. The system as claimed in claim 18 wherein the injection length is offset laterally from the trench plane.

20. The system as claimed in claim 18 wherein at east a portion of the injection length is located within the trench.

21. The system as claimed in claim 16 wherein at least a portion of the production length is located within the trench.

22. The system as claimed in claim 21 wherein the injection length is offset laterally from the trench plane.

23. The system as claimed in claim 21 wherein at least a portion of the injection length is located within the trench.

24. The system as claimed in claim 16 wherein the production length and the injection length are substantially coextensive.

25. The system as claimed in claim 24 wherein the trench length extends uninterrupted along a portion of the production length and the injection length.

26. The system as claimed in claim 25 wherein the formation has a formation thickness and wherein the trench extends through a portion of the formation thickness.

27. The system as claimed in claim 25 wherein the formation has a formation thickness and wherein the trench extends through substantially the entire formation thickness.

28. The system as claimed in claim 24 wherein the trench length extends uninterrupted along substantially the entire production length and along substantially the entire injection length.

29. The system as claimed in claim 28 wherein the formation has a formation thickness and wherein the trench extends through a portion of the formation thickness.

30. The system as claimed in claim 28 wherein the formation has a formation thickness and wherein the trench extends through substantially the entire formation thickness.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 21, 2017
From: ALBERTA INNOVATES
To: INNOTECH ALBERTA INC.
Reel/Frame 044935/0144 →
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE NAME PREVIOUSLY RECORDED ON REEL 043315 FRAME 0074. ASSIGNOR(S) HEREBY CONFIRMS THE CHANGE OF NAME. Recorded Sep 8, 2017
From: ALBERTA INNOVATES - TECHNOLOGY FUTURES
To: ALBERTA INNOVATES
Reel/Frame 043790/0646 →
CHANGE OF NAME Recorded Jul 24, 2017
From: ALBERTA INNOVATES - TECHNOLOGY FUTURE
To: ALBERTA INNOVATES
Reel/Frame 043315/0074 →
CORRECTIVE ASSIGNMENT TO CORRECT THE TYPOGRAPHICAL ERROR IN ADDRESS OF ASSIGNEE FROM "260 KARL CLARK ROAD" TO --250 KARL CLARK ROAD-- PREVIOUSLY RECORDED ON REEL 027209 FRAME 0559. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT OF U.S. PATENT APPLICATION NO. 13/234,853 FROM THE INVENTORS TO ALBERTA INNOVATES-TECHNOLOGY FUTURES. Recorded Nov 18, 2011
From: TUNNEY, CATHAL JOSEPH; CHEN, TECHIEN; LILLICO, DOUGLAS A.; NEDA, JUSTO
To: ALBERTA INNOVATES - TECHNOLOGY FUTURES
Reel/Frame 027255/0408 →
NUNC PRO TUNC ASSIGNMENT Recorded Nov 10, 2011
From: TUNNEY, CATHAL JOSEPH; CHEN, TECHIEN; LILLICO, DOUGLAS A.; NEDA, JUSTO
To: ALBERTA INNOVATES - TECHNOLOGY FUTURES
Reel/Frame 027209/0559 →