IP Library Granted Patent US 8,667,980
Granted Patent B2
US 8,667,980 · App. 13/272,135 · Granted Mar 11, 2014

Non-interrupt meter change out

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,667,980
App. No.
13/272,135
Granted
Mar 11, 2014
Kind
B2
Abstract

Disclosed is a non-interrupt meter change out device including a clamp assembly, at least one case assembly, and at least one collar, the clamp assembly including a frame and a distance adjuster.

Claims (24)

1. A method of replacing a preexisting meter that is in fluid communication with a pipeline having swivel fittings with a replacement meter, the method comprising the steps of:

affixing a clamp assembly to the pipeline;

drawing the clamp assembly to secure the preexisting meter to the pipeline;

inserting a gasket removal collar between at least one gasket and at least one swivel fitting;

connecting at least one case assembly to at least one of the preexisting meter and at least one swivel fitting;

partially removing the preexisting meter from at least one swivel fitting and from the clamp assembly;

activating a fluid bypass;

fully removing the preexisting meter;

inserting a gasket installation collar on at least one gasket of the replacement meter;

placing the replacement meter in the clamp assembly;

adjusting the replacement meter to fluid communication with at least one case assembly;

deactivating the fluid bypass;

adjusting the replacement meter to fluid communication with at least one swivel fitting;

removing at least one case assembly;

securing the replacement meter to the pipeline; and,

removing the clamp assembly from the pipeline.

2. The method of claim 1 , further comprising:

measuring the vertical position of the preexisting meter; and

adjusting the new meter to the measured vertical position.

3. The method of claim 1 , further comprising purging the at least one case assembly of oxygen.

4. The method of claim 1 , further comprising purging the replacement meter of oxygen.

5. The method of claim 1 , wherein

the step of activating the fluid bypass includes moving at least one valve plate to a bypass position; and

the step of deactivating the fluid bypass includes moving the at least one valve plate to a meter flow position.

Assignments (4)
RELEASE OF SECURITY INTEREST Recorded Jun 20, 2018
From: BANK OF AMERICA, N.A.
To: MUELLER INTERNATIONAL, LLC
Reel/Frame 046395/0444 →
SECURITY AGREEMENT Recorded Dec 2, 2014
From: MUELLER INTERNATIONAL, LLC, AS GRANTOR
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 034502/0219 →
SECURITY INTEREST Recorded Dec 1, 2014
From: MUELLER INTERNATIONAL, LLC
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 034498/0272 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 26, 2012
From: WILLIAMS, JAMES OLA; FLEURY, LEO WILLIAM, JR.; ROY, NORMAND JAMES
To: MUELLER INTERNATIONAL, LLC
Reel/Frame 027599/0812 →