IP Library Granted Patent US 8,968,556
Granted Patent B2
US 8,968,556 · App. 13/273,975 · Granted Mar 3, 2015

Process for extracting bitumen and drying the tailings

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,968,556
App. No.
13/273,975
Granted
Mar 3, 2015
Kind
B2
Abstract

A process for separating bitumen from bitumen ore material includes extracting bitumen with a hydrocarbon solvent to produce a bitumen-enriched solvent phase and tailings. The tailings are dried or stripped in a dryer to remove any remaining hydrocarbon solvent. The amount of solvent discharged in the tailings may be less than 4 bbl per 1000 bbl of recovered bitumen.

Claims (33)

1. A method comprising:

mixing bitumen ore material with a heated first hydrocarbon solvent and forming a first mixture;

separating a first hydrocarbon solvent enriched phase from the first mixture and producing first tailings;

mixing the first tailings with a second hydrocarbon solvent liquid and forming a second mixture:

separating a second hydrocarbon solvent enriched phase from the second mixture and producing second tailings;

passing a second hydrocarbon solvent vapor through the second tailings;

flashing the second tailings after passing the second hydrocarbon solvent vapor through the second tailings and before removing second hydrocarbon solvent from the second tailings in a dryer; and

removing second hydrocarbon solvent from the second tailings in a dryer.

2. The method of claim 1 , wherein the heated first hydrocarbon solvent is heated to a temperature in the range of from 30 to 60° C.

3. The method of claim 1 , wherein the bitumen ore material is at a temperature in the range of 0 to 4° C.

4. The method of claim 1 , the first hydrocarbon solvent is an aromatic solvent.

5. The method of claim 1 , wherein mixing bitumen ore material with a heated first hydrocarbon solvent comprises loading the bitumen ore material in a vertical column, adding heated first hydrocarbon solvent at the top of the vertical column, and allowing the heated first hydrocarbon solvent to flow down through the bitumen ore material loaded in the vertical column.

6. The method of claim 1 , wherein the second hydrocarbon solvent is a paraffinic solvent.

7. The method of claim 5 , wherein mixing the first tailings with a second hydrocarbon solvent liquid comprises adding second hydrocarbon solvent liquid, at the top of the vertical column and allowing the second hydrocarbon solvent liquid to flow down through the first tailings loaded in the vertical column.

8. The method of claim 1 wherein the dryer includes a plurality of separate drying trays.

9. The method of claim 1 wherein the dryer is a rotary dryer having heated gas moving in a countercurrent direction to the second tailings.

10. The method of claim 1 wherein the dryer is a fluidized bed dryer.

11. The method of claim 1 wherein the bitumen ore material includes tar sands.

12. The method of claim 1 , wherein the second hydrocarbon solvent vapor is heated to a temperature of about 80° C.

13. A method comprising:

crushing bitumen ore material in a crusher while adding a first quantity of heated first hydrocarbon solvent to the bitumen ore material;

mixing the crushed bitumen ore material with a second quantity of heated first hydrocarbon solvent and forming a first mixture in a first mixing vessel;

separating a first quantity of first hydrocarbon solvent enriched phase from the first mixture; loading the first mixture in a vertical column;

passing a third quantity of heated first hydrocarbon solvent through the first mixture loaded in the a vertical column and forming a second mixture;

collecting, a second quantity of first hydrocarbon solvent enriched phase exiting the vertical column at a bottom end of the vertical column;

passing a second hydrocarbon solvent vapor through the second mixture loaded in the vertical column;

flashing the second mixture loaded in the vertical column and forming tailings; and

removing second hydrocarbon solvent from the tailings in a dryer.

14. The method of claim 13 , wherein the heated first hydrocarbon solvent includes an aromatic solvent.

15. The method of claim 13 , wherein the second hydrocarbon solvent includes a paraffinic solvent.

16. The method of claim 13 , wherein the heated first hydrocarbon solvent is at a temperature in the range of from 30 to 60° C.

17. The method of claim 13 , wherein the second hydrocarbon solvent vapor is at a temperature of about 80° C. and a pressure of several atmospheres.

18. The method of claim 14 , wherein the bitumen ore material is at a temperature of from 0 to 4° C.

Assignments (5)
NUNC PRO TUNC ASSIGNMENT Recorded Feb 27, 2018
From: SHELL CANADA ENERGY
To: CANADIAN NATURAL UPGRADING LIMITED
Reel/Frame 045054/0463 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 15, 2014
From: MARATHON OIL CANADA CORPORATION
To: SHELL CANADA ENERGY; CHEVRON CANADA LIMITED
Reel/Frame 031972/0641 →
CHANGE OF NAME Recorded May 22, 2013
From: MARATHON CANADIAN OIL SANDS HOLDING LIMITED
To: MARATHON OIL CANADA CORPORATION
Reel/Frame 030467/0595 →
CHANGE OF NAME Recorded Jan 23, 2013
From: MARATHON OIL CANADA CORPORATION
To: MARATHON CANADIAN OIL SANDS HOLDING LIMITED
Reel/Frame 029676/0704 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 6, 2011
From: KIFT, JULIAN; HOFFMAN, CHERISH M.; THOMPSON, WHIP C.; JOSHI, MAHENDRA
To: MARATHON OIL CANADA CORPORATION
Reel/Frame 027340/0706 →