IP Library Granted Patent US 8,221,034
Granted Patent B2
US 8,221,034 · App. 13/279,833 · Granted Jul 17, 2012

Methods of providing a support column

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,221,034
App. No.
13/279,833
Granted
Jul 17, 2012
Kind
B2
Abstract

A primary earth penetrating mandrel formed of a hollow shell steel plate octagonal in cross-section has an upper end and a blunt lower end joined by an upwardly and outwardly tapered wall. The mandrel is driven down in the earth to simultaneously form a vertical tapered cavity while compacting the sidewall of the cavity to provide structural integrity. The mandrel is then moved upwardly from the bottom of the cavity and aggregate is deposited in the bottom of the cavity then the mandrel is lowered so that its blunt lower end densifies the aggregate by vertical vibratory action and static force and repeating these until the pier top is near the surface of the earth at which time the upper aggregate portions are densified by the primary mandrel or a secondary mandrel having a substantially larger lower end surface than the lower end surface of the primary mandrel.

Claims (20)

1. A method of forming an aggregate pier comprising the steps of:

(a) driving downwardly into pier site soil a tapered mandrel having an open lower end initially covered by a cap to form a downwardly tapered cavity to a desired depth for said aggregate pier while supporting a sidewall of the cavity;

(b) moving the tapered mandrel upwardly to a top of said cavity so as to separate said cap from said open end of the mandrel and withdraw said cap while delivering loose aggregate through said open end of the mandrel and depositing said delivered aggregate to the cavity so as to support said sidewall below said upwardly moved mandrel;

(c) driving downwardly into said deposited aggregate a tapered mandrel having a blunt lower end surface so that said blunt lower end of the mandrel compacts said deposited aggregate and densities said soil;

(d) moving said tapered mandrel having the blunt lower end surface upwardly from said compacted aggregate and depositing additional loose aggregate in said cavity; and

(e) repeating said steps (c) and (d) until a pier component of a desired height is formed.

2. The method according to claim 1 , wherein said depth of the pier is approximately 10 to 20 feet.

3. The method according to claim 1 , wherein said step (c) compacts said deposited aggregate to a depth of approximately 5 to 15 feet.

4. The method according to claim 1 , further comprising, after said step (b) of moving the tapered mandrel upwardly to the top of the cavity, a step of affixing the blunt lower end surface to the mandrel.

5. The method according to claim 1 , further comprising, after said step (b) of moving the tapered mandrel upwardly to the top of the cavity, a step of replacing the mandrel having the open lower end with a mandrel having a blunt lower end surface.

6. The method according to claim 1 , wherein said cap is configured to separate from the open end of the mandrel and is attached to the mandrel.

7. The method according to claim 6 , wherein said cap is attached to the mandrel by a tether.

8. The method according to claim 7 , wherein said tether is a chain or a cable.

9. A method of forming an aggregate pier comprising the steps of:

(a) driving downwardly into pier site soil a tapered mandrel having an open lower end initially covered by a removable and recoverable cap to form a downwardly tapered cavity to a desired depth for said aggregate pier while supporting a sidewall of the cavity;

(b) moving the tapered mandrel upwardly to a top of said cavity so as to separate said cap from said open end of the mandrel and recover said cap while delivering loose aggregate through said open end of the mandrel and depositing said delivered aggregate to the cavity so as to support said sidewall below said upwardly moved mandrel;

(c) repeating said steps (a) and (b) at a different portion of the pier site so as to form a plurality of said aggregate deposited cavities;

(d) driving downwardly into said aggregate deposited cavity a tapered mandrel having a blunt lower end surface so that said blunt lower end of the mandrel compacts said deposited aggregate and densities said soil;

(e) moving said tapered mandrel having the blunt lower end surface upwardly from said compacted aggregate and depositing additional loose aggregate in said cavity; and

(f) repeating said steps (d) and (e) at each of said plurality of aggregate deposited cavities until a plurality of pier components of a desired height is formed.

Assignments (10)
RELEASE OF SECURITY INTEREST Recorded Apr 26, 2022
From: ALTER DOMUS (US) LLC
To: TENSAR CORPORATION, LLC; TENSAR CORPORATION; TENSAR INTERNATIONAL CORPORATION; GEOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY, INC.; TENSAR TECHNOLOGIES LIMITED
Reel/Frame 059804/0380 →
RELEASE OF SECURITY INTEREST Recorded Apr 26, 2022
From: WHITEHORSE CAPITAL MANAGEMENT, LLC
To: TENSAR CORPORATION, LLC; TENSAR CORPORATION; TENSAR INTERNATIONAL CORPORATION; GEOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY, INC.; TENSAR TECHNOLOGIES LIMITED
Reel/Frame 059804/0298 →
RELEASE OF SECURITY INTEREST IN PATENT RIGHTS (FIRST LIEN) Recorded Nov 23, 2020
From: WILMINGTON TRUST, NATIONAL ASSOCIATION
To: GEOPIER FOUNDATION COMPANY, INC.; NORTH AMERICAN GREEN INC.; TENSAR CORPORATION; TENSAR CORPORATION, LLC (FORMERLY KNOWN AS THE TENSAR CORPORATION); TENSAR HOLDINGS, LLC (FORMERLY KNOWN AS TENSAR HOLDINGS CORPORATION); TENSAR INTERNATIONAL CORPORATION; GEOTECHNICAL REINFORCEMENT INC.
Reel/Frame 055354/0098 →
RELEASE OF SECURITY INTEREST IN PATENT RIGHTS (SECOND LIEN) Recorded Nov 23, 2020
From: WILMINGTON TRUST, NATIONAL ASSOCIATION
To: GEOPIER FOUNDATION COMPANY, INC.; NORTH AMERICAN GREEN INC.; TENSAR CORPORATION; TENSAR CORPORATION, LLC (FORMERLY KNOWN AS THE TENSAR CORPORATION); TENSAR HOLDINGS, LLC (FORMERLY KNOWN AS TENSAR HOLDINGS CORPORATION); TENSAR INTERNATIONAL CORPORATION; GEOTECHNICAL REINFORCEMENT INC.
Reel/Frame 055354/0341 →
PATENT SECURITY AGREEMENT (SECOND LIEN) Recorded Nov 23, 2020
From: GEOPIER FOUNDATION COMPANY, INC.; GEOTECHNICAL REINFORCEMENT COMPANY INC.; TENSAR CORPORATION, LLC; TENSAR INTERNATIONAL CORPORATION; TENSAR CORPORATION
To: ALTER DOMUS (US) LLC, AS COLLATERAL AGENT
Reel/Frame 054504/0843 →
SECURITY INTEREST Recorded Nov 20, 2020
From: GEOPIER FOUNDATION COMPANY, INC.
To: WHITEHORSE CAPITAL MANAGEMENT, LLC, AS COLLATERAL AGENT
Reel/Frame 054427/0621 →
ASSIGNMENT OF PATENT SECURITY AGREEMENT Recorded Apr 3, 2020
From: UBS AG
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 052311/0566 →
ASSIGNMENT OF PATENT SECURITY AGREEMENT Recorded Apr 3, 2020
From: UBS AG
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 052311/0625 →
SECOND LIEN PATENT SECURITY AGREEMENT Recorded Aug 13, 2014
From: GEOPIER FOUNDATION COMPANY INC.
To: UBS AG, STAMFORD BRANCH
Reel/Frame 033532/0699 →
FIRST LIEN PATENT SECURITY AGREEMENT Recorded Aug 13, 2014
From: GEOPIER FOUNDATION COMPANY INC.
To: UBS AG, STAMFORD BRANCH
Reel/Frame 033532/0807 →