IP Library Granted Patent US 8,228,648
Granted Patent B2
US 8,228,648 · App. 13/281,078 · Granted Jul 24, 2012

Compressor protection and grid fault detection device

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,228,648
App. No.
13/281,078
Granted
Jul 24, 2012
Kind
B2
Abstract

A compressor monitoring system includes current and voltage monitors, current and voltage averaging modules, a control module, and a switch. The current monitor measures a current drawn by a motor of a compressor. The current averaging module generates first and second average current values based on the current measured by the current monitor. The voltage monitor measures a utility power voltage. The voltage averaging module generates first and second average voltage values based on the voltage measured by the voltage monitor. The control module selectively generates a fault signal when a first ratio is greater than a first predetermined threshold and a second ratio is less than a second predetermined threshold. The first ratio is based on the first and second average current values. The second ratio is based on the first and second average voltage values. The switch deactivates the motor when the fault signal is generated.

Claims (44)

1. A method comprising:

operating at least one component of an air conditioning system in a first state;

detecting an electrical grid fault in response to a comparison of (i) a first average of current drawn by the at least one component and (ii) a second average of the current drawn by the at least one component; and

in response to the detecting of the electrical grid fault,

switching the at least one component from the first state to a second state, wherein the at least one component consumes less power in the second state than in the first state; and

switching the at least one component from the second state to the first state after a predetermined period of time following the detecting of the electrical grid fault.

2. A method comprising:

operating at least one component of an air conditioning system in an ON state;

detecting an electrical grid fault in response to a comparison of (i) a first average of current drawn by the at least one component and (ii) a second average of the current drawn by the at least one component; and

in response to the detecting of the electrical grid fault,

switching the at least one component from the ON state to an OFF state; and

switching the at least one component from the OFF state to the ON state after a predetermined period of time following the detecting of the electrical grid fault.

3. A method of operating a component of an air conditioning system, the method comprising:

monitoring an electrical parameter of the component, wherein the electrical parameter is a current drawn by the component;

determining an occurrence of an electrical grid fault based on a comparison of a first average of the current and a second average of the current; and

in response to the occurrence of the electrical grid fault,

actuating a switch to interrupt the current to the component; and

a predetermined period of time after the current is interrupted, actuating the switch to re-supply the current to the component.

4. The method of claim 3 , further comprising determining the occurrence of the electrical grid fault based on monitoring of a power factor of the component.

5. The method of claim 3 , further comprising determining the occurrence of the electrical grid fault based on monitoring of a voltage supplied to the component.

6. The method of claim 3 , wherein the second average is based on values of the current monitored over a first period and wherein the first average is based on values of the current monitored over a second period prior to the first period.

7. The method of claim 3 , further comprising determining the occurrence of the electrical grid fault in response to the second average being a predetermined percentage greater than the first average.

8. The method of claim 3 , further comprising determining the occurrence of the electrical grid fault in response to (i) the second average being a predetermined percentage greater than the first average only when (ii) a voltage supplied to the component has decreased by a second predetermined percentage.

9. The method of claim 3 , further comprising monitoring a voltage supplied to the component, wherein:

the first average is based on values of the current collected during a first period of time,

the second average is based on values of the current collected during a second period of time, and

the occurrence of the electrical grid fault is further determined based on a comparison of (i) values of the voltage collected during the first period of time with (ii) values of the voltage collected during the second period of time.

10. The method of claim 3 , further comprising actuating the switch to interrupt the current to the component in response to the current drawn by the component exceeding a threshold, wherein the threshold is determined based on a peak current measured during startup of the component.

11. The method of claim 1 , wherein the second average is based on values of the current monitored over a first period and wherein the first average is based on values of the current monitored over a second period prior to the first period.

12. The method of claim 1 , further comprising detecting the electrical grid fault in response to the second average being a predetermined percentage greater than the first average.

13. The method of claim 1 , further comprising detecting the electrical grid fault in response to (i) the second average being a predetermined percentage greater than the first average only when (ii) a voltage supplied to the at least one component has decreased by a second predetermined percentage.

14. The method of claim 1 , further comprising monitoring a voltage supplied to the at least one component, wherein:

the first average is based on values of the current collected during a first period of time,

the second average is based on values of the current collected during a second period of time, and

the electrical grid fault is further detected based on a comparison of (i) values of the voltage collected during the first period of time with (ii) values of the voltage collected during the second period of time.

15. The method of claim 1 , further comprising interrupting the current to the at least one component in response to the current drawn by the at least one component exceeding a threshold, wherein the threshold is determined based on a peak current measured during startup of the at least one component.

16. The method of claim 2 , wherein the second average is based on values of the current monitored over a first period and wherein the first average is based on values of the current monitored over a second period prior to the first period.

17. The method of claim 2 , further comprising detecting the electrical grid fault in response to the second average being a predetermined percentage greater than the first average.

18. The method of claim 2 , further comprising detecting the electrical grid fault in response to (i) the second average being a predetermined percentage greater than the first average only when (ii) a voltage supplied to the at least one component has decreased by a second predetermined percentage.

19. The method of claim 2 , further comprising monitoring a voltage supplied to the at least one component, wherein:

the first average is based on values of the current collected during a first period of time,

the second average is based on values of the current collected during a second period of time, and

the electrical grid fault is further detected based on a comparison of (i) values of the voltage collected during the first period of time with (ii) values of the voltage collected during the second period of time.

20. The method of claim 2 , further comprising switching the at least one component to the OFF state in response to the current drawn by the at least one component exceeding a threshold, wherein the threshold is determined based on a peak current measured during startup of the at least one component.

Assignments (5)
SECURITY INTEREST Recorded Jul 9, 2024
From: COPELAND LP
To: U.S. BANK TRUST COMPANY, NATIONAL ASSOCIATION, AS NOTES COLLATERAL AGENT
Reel/Frame 068241/0264 →
SECURITY INTEREST Recorded Jul 17, 2023
From: COPELAND LP
To: ROYAL BANK OF CANADA, AS COLLATERAL AGENT
Reel/Frame 064278/0598 →
SECURITY INTEREST Recorded Jul 17, 2023
From: COPELAND LP
To: U.S. BANK TRUST COMPANY, NATIONAL ASSOCIATION, AS NOTES COLLATERAL AGENT
Reel/Frame 064279/0327 →
SECURITY INTEREST Recorded Jul 17, 2023
From: COPELAND LP
To: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 064280/0695 →
ENTITY CONVERSION Recorded Jun 22, 2023
From: EMERSON CLIMATE TECHNOLOGIES, INC.
To: COPELAND LP
Reel/Frame 064058/0724 →