IP Library Granted Patent US 8,246,304
Granted Patent B2
US 8,246,304 · App. 13/288,200 · Granted Aug 21, 2012

Wind turbine and method of determining at least one rotation parameter of a wind turbine rotor

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,246,304
App. No.
13/288,200
Granted
Aug 21, 2012
Kind
B2
Abstract

A method of determining at least one rotation parameter of a wind turbine rotor rotating with a rotation speed and a phase is provided. The method includes: measuring an effective centrifugal force acting in a first pre-determined direction, which is defined in a co-ordinate system rotating synchronously with the rotor, on at least one reference object located in or at the rotor, establishing a first angular frequency representing the rotation speed of the rotor on the basis of variations in the measured effective centrifugal force due to gravitational force, establishing a second angular frequency representing the rotation speed of the rotor by use of at least one yaw rate gyro, and establishing the value of the rotation speed as the rotational parameter by correcting the second angular frequency by comparing it to the first angular frequency.

Claims (17)

1. A wind turbine with a rotor including a hub and at least one rotor blade fixed to the hub, comprising:

an accelerometer and an least one yaw rate gyro arranged in or at the rotor; and

a processor that establishes at least an angular frequency representing the rotation speed of the rotor on the basis of outputs of the accelerometer and the yaw rate gyro.

2. The wind turbine as claimed in claim 1 , wherein the accelerometer is located in or at the hub.

3. The wind turbine as claimed in claim 1 , wherein yaw rate gyro is located in or at the hub.

4. The wind turbine as claimed in claim 1 , wherein the at least one accelerometer is a dual-axis accelerometer.

5. The wind turbine as claimed in claim 4 , wherein a phase of the rotor is determined via the dual-axis accelerometer.

6. The wind turbine as claimed in claim 1 , wherein the processor comprises a phase locked loop and an auto calibration unit.

7. The wind turbine as claimed in claim 6 ,

wherein the accelerometer is configured to output an effective centrifugal force acting in a first pre-determined direction on at least one reference object located in or at the rotor,

wherein the first pre-determined direction is defined in a co-ordinate system rotating synchronously with the rotor, and

wherein the yaw rate gyro is configured to determine a second angular frequency representing the rotation speed of the rotor.

8. The wind turbine as claimed in claim 7 ,

wherein the phase locked loop is electronically coupled to the accelerometer to receive the effective centrifugal force,

wherein the phase locked loop is configured to use the effective centrifugal force to determine a phase of the rotating rotor and to determine a first angular frequency,

wherein the auto calibration unit is electronically coupled to the yaw rate gyro to receive the second angular frequency and electronically coupled to the phase locked loop to receive the first angular frequency,

wherein the auto calibration unit is configured to use the first and second angular frequency to determine the actual rotor speed.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2019
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS GAMESA RENEWABLE ENERGY A/S
Reel/Frame 048003/0631 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 3, 2011
From: EGEDAL, PER
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 027168/0023 →