IP Library Granted Patent US 8,753,305
Granted Patent B2
US 8,753,305 · App. 13/311,727 · Granted Jun 17, 2014

Bubble-driven IOP control system

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,753,305
App. No.
13/311,727
Granted
Jun 17, 2014
Kind
B2
Abstract

An intraocular pressure control system for implantation in an eye of a patient to provide drainage from an anterior chamber of the eye to a drainage location at the eye includes a drainage tube and a valve system arranged to control drainage flow between the anterior chamber and the drainage site, the valve system being configured to control fluid flow using an electrolysis process and closed loop feedback from pressure sensors able to determine: flow rate, IOP, bleb pressure, and internal valve pressure.

Claims (45)

1. An intraocular pressure (“IOP”) control system for implantation in an eye of a patient to provide drainage from an anterior chamber of the eye to a drainage site at the eye, comprising:

a drainage tube with a first end configured to be located in the anterior chamber and a second end, the drainage tube being configured to convey fluid from the anterior chamber toward the drainage site to relieve intraocular pressure;

a valve system in fluid communication with the drainage tube and configured for implantation in the eye, the valve system being arranged to control drainage flow through the drainage tube between the anterior chamber and the drainage site, the valve system being configured to control fluid flow using an electrolysis system; and

an override pressure relief system comprising:

an override pressure relief line with a first end fluidly coupled to the drainage tube and a second end configured to be located at the drainage site; and

an override pressure relief valve coupled to the override pressure relief line, the override pressure relief valve configured to operate when intraocular pressure increases above preset values and the valve system is not sufficiently responsive.

2. The IOP control system of claim 1 , wherein the valve system comprises an actuator liquid and the electrolysis system is configured to generate bubbles by converting at least a portion of the actuator liquid to a gas.

3. The IOP control system of claim 2 , wherein the electrolysis system comprises a pair of electrodes.

4. The IOP control system of claim 3 , wherein the pair of electrodes are interdigitated.

5. The IOP control system of claim 2 , wherein the valve system comprises a diffusion barrier disposed adjacent the actuator liquid, the diffusion barrier being sized to reduce the rate of state change from gas molecules to liquid molecules.

6. The IOP control system of claim 1 , wherein the valve system comprises an aqueous flow passageway and a flexible membrane forming a part of the passageway, the flexible membrane being configured to flex as a result of an electrolysis process.

7. The IOP control system of claim 6 , wherein the flexible membrane is configured to displace and modify the cross-sectional area of the passageway.

8. The IOP control system of claim 6 , wherein the passageway includes a first portion having a flow path substantially perpendicular to the flexible membrane.

9. The IOP control system of claim 6 , wherein the passageway comprises a first portion directed substantially at a central portion of the flexible membrane, such that flexure of the flexible membrane affects the flow rate of fluid through the first portion.

10. The IOP control system of claim 6 , wherein the flexible membrane has corrugations, to increase the flexibility of the flexible membrane.

11. The IOP control system of claim 1 , wherein the valve system comprises a first valve and a second valve connected in series, each of the first and second valves being configured to control flow using an electrolysis process.

12. The IOP control system of claim 1 , further comprising a pump.

13. The IOP control system of claim 12 , wherein the pump comprises an electrolysis system.

14. The IOP control system of claim 1 , further comprising a sensor system comprising:

a first sensor configured to detected pressure in the anterior chamber;

a second sensor configured to detect atmospheric pressure; and

a third sensor configured to detect pressure at the drainage site.

15. The IOP control system of claim 14 , further comprising a processor configured to receive data from the first, second, and third sensors and send control signals to the valve system based on the data.

16. The IOP control system of claim 15 , further comprising a power source coupled to the processor and the valve system.

17. The IOP control system of claim 16 , further comprising a radio frequency antenna coupled to the power source and the processor for recharging, programming and data transfer.

18. The IOP control system of claim 14 , further comprising a first barrier separating the first and second sensor and a second barrier separating the second and third sensor, and a third barrier separating the first and third sensors.

19. The IOP control system of claim 18 , wherein the third barrier separating the first sensor and the third sensor is the valve system.

20. The IOP control system of claim 14 , wherein the second sensor is configured to be disposed under a conjuctiva of the eye.

21. The IOP control system of claim 14 , wherein the valve system comprises a plate having a barrier thereon, and the second sensor is disposed on a top of the plate and the third sensor is disposed on a bottom in contact with the drainage site.

22. An intraocular pressure (“IOP”) control system for implantation in an eye of a patient to provide drainage from an anterior chamber of the eye to a drainage site at the eye, comprising:

a drainage tube with a first end configured to be located in the anterior chamber, the drainage tube being configured to convey fluid from the anterior chamber;

a first sensor configured to detect pressure in the anterior chamber;

a second sensor configured to detect atmospheric pressure;

a third sensor configured to detect pressure at the drainage site;

a valve system in fluid communication with the drainage tube and configured for implantation in the eye, the valve system being arranged to control drainage flow through the drainage tube between the anterior chamber and the drainage site;

a processor in communication with and configured to receive data from the first, second, and third sensors, the processor being configured to control the valve system based on the received data to maintain desired pressures in the anterior chamber and at the drainage site; and

an override pressure relief system comprising:

an override pressure relief line with a first end fluidly coupled to the drainage tube and a second end configured to be located at the drainage site; and

an override pressure relief valve coupled to the override pressure relief line, the override pressure relief valve configured to operate when intraocular pressure increases above preset values and the valve system is not sufficiently responsive.

23. The IOP control system of claim 22 , wherein the valve system is configured to control drainage fluid flow using an electrolysis process.

24. The IOP control system of claim 22 , wherein a radio frequency antenna coupled to an onboard power source and processor for recharging, programming and data transfer.

25. The IOP control system of claim 22 , further comprising a first barrier separating the first and second sensor and a second barrier separating the second and third sensor, and a third barrier separating the first and third sensors.

26. The IOP control system of claim 25 , wherein the third barrier separating the first sensor and the third sensor is the valve system.

27. The IOP control system of claim 22 , wherein the second sensor is configured to be disposed under a conjuctiva of the eye.

28. The IOP control system of claim 22 , wherein the valve system comprises a plate having a barrier thereon, and the second sensor is disposed on a top of the plate and the third sensor is disposed on a bottom in contact with the drainage site.

Assignments (3)
CONFIRMATORY DEED OF ASSIGNMENT EFFECTIVE APRIL 8, 2019 Recorded Dec 14, 2019
From: ALCON RESEARCH, LLC
To: ALCON INC.
Reel/Frame 051293/0444 →
MERGER Recorded Dec 11, 2019
From: ALCON RESEARCH, LTD.
To: ALCON RESEARCH, LLC
Reel/Frame 051257/0562 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 11, 2012
From: FIELD, LESLIE; RICKARD, MATTHEW
To: ALCON RESEARCH, LTD.
Reel/Frame 027517/0295 →