IP Library Granted Patent US 8,779,611
Granted Patent B2
US 8,779,611 · App. 13/315,756 · Granted Jul 15, 2014

Method for operating a pitch-controlled wind turbine

Inventors: Wolfgang Kabatzke (Geesthacht, DE); Hermann Rochholz (Bozen, IT); Jochen Birkemeyer (Norderstedt, DE)
Assignee: Nordex Energy GmbH
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,779,611
App. No.
13/315,756
Granted
Jul 15, 2014
Kind
B2
Abstract

Method for operating a pitch-controlled wind turbine, in which a set-point value for the generator torque (M) is prescribed in dependence upon a rotational speed (n) of the generator or of the rotor. A transition point (n 3 , M 3 ) is provided at which a transition from a partial-load operation to a nominal-load operation occurs. A control of the rotational speed takes place by adjusting the blade pitch angle for a set-point value (M 3 ) from the transition point. The values (n 3 , M 3 ) of the transition point are determined in dependence upon a current value of the air density. With falling air density, the rotational speed (n 3 ) is increased and/or the set-point value for the generator torque (M 3 ) is reduced.

Claims (14)

1. A method for operating a pitch-controlled wind turbine having a rotor blade, a rotor and a generator, the method comprising the steps of:

prescribing a set-point value for the generator torque (M) in dependence upon a rotational speed (n) of the generator or of the rotor;

providing a transition point (n 3 , M 3 ) whereat a transition occurs from a partial-load operation into a nominal-load operation wherein said rotational speed (n) is controlled by adjusting the pitch angle of said rotor blade;

determining the values (n 3 , M 3 ) of said transition point in dependence upon a current value of the air density (ρ);

with falling air density, increasing the rotational speed (n 3 ) and/or reducing said set-point value (M 3 ) for the generator torque;

determining a change (Δρ) in said air density (ρ) and comparing said change (Δρ) to a maximum allowable change (Δρ 2 ) in air density; and,

if said change (Δρ) in air density (ρ) exceeds said maximum allowable change (Δρ 2 ), then changing said transition point.

2. The method of claim 1 , wherein the blade pitch angle is already adjusted to a minimum blade pitch angle in the partial-load operation.

3. The method of claim 2 , wherein the value of the minimum blade pitch angle is selected in dependence upon the air density.

4. The method of claim 1 , wherein the current air density (ρ) is determined in dependence upon a measured air temperature (T) and a measured air pressure (p) taking into account a value for the humidity (ψ).

5. The method of claim 1 , wherein a value (Ψ) for humidity is provided in dependence upon a time of day and/or a season.

6. The method of claim 4 , wherein said value for the humidity (ψ) is measured.

7. The method of claim 1 , wherein a characteristic curve of generator torque (M Gen ) as a function of generator rotational speed (n Gen ) is provided and said characteristic curve has a predetermined point (n 2 , M 2 ), starting from which the set-point value for the generator torque increases linearly up to a nominal-load operation.

8. The method of claim 7 , wherein the set-point value (M 2 ) for the generator torque is reduced given constant rotational speed (n 2 ) with falling air density.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE CHANGE OF NAME TO REMOVE PATENT NUMBER 10771765 AND ADD PATENT NUMBER 10711765 PREVIOUSLY RECORDED AT REEL: 055259 FRAME: 0008. ASSIGNOR(S) HEREBY CONFIRMS THE CHANGE OF NAME. Recorded Nov 12, 2021
From: NORDEX ENERGY GMBH
To: NORDEX ENERGY SE & CO. KG
Reel/Frame 058222/0542 →
CHANGE OF NAME Recorded Feb 8, 2021
From: NORDEX ENERGY GMBH
To: NORDEX ENERGY SE & CO. KG
Reel/Frame 055259/0008 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 2, 2012
From: KABATZKE, WOLFGANG; ROCHHOLZ, HERMANN; BIRKEMEYER, JOCHEN
To: NORDEX ENERGY GMBH
Reel/Frame 027930/0683 →
Priority Claims (1)
DE 10 2010 054 014 · Dec 10, 2010 · national
Continuity (1)
Related Publication 20120148402A1 · Jun 14, 2012