IP Library Granted Patent US 8,820,077
Granted Patent B2
US 8,820,077 · App. 13/331,398 · Granted Sep 2, 2014

Saturated steam thermodynamic cycle for a turbine and an associated installation

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,820,077
App. No.
13/331,398
Granted
Sep 2, 2014
Kind
B2
Abstract

A saturated steam or weakly superheated steam thermodynamic cycle in an electricity generating plant includes at least a nuclear energy source and a turbine having at least a high-pressure module, a medium-pressure module and a low-pressure module. The steam flows successively through the high-pressure, medium-pressure and low-pressure modules. The steam undergoes a first drying and/or superheating cycle between the high-pressure and medium-pressure modules and also a second cycle comprising at least a drying and/or a superheating process between the medium-pressure module and the low-pressure module.

Claims (25)

1. A saturated steam or weakly superheated steam thermodynamic cycle, in an electricity generating plant, comprising:

at least a nuclear energy source, and

a turbine including:

at least a high-pressure module,

a medium-pressure module, and

a low-pressure module,

wherein the steam flows successively through the high-pressure, medium-pressure and the low-pressure modules, the steam undergoes a first drying and/or superheating cycle between the high-pressure and medium-pressure modules, and the steam undergoes a second cycle that includes at least one drying process between the medium-pressure module and the low-pressure module, and

wherein the superheating in the first drying and/or superheating cycle is provided by using steam taken from a first steam bleed point of the high-pressure module and the superheating in the second cycle is provided by using steam taken from a second steam bleed point of the high-pressure module.

2. The thermodynamic cycle as claimed in claim 1 , wherein the second cycle includes a steam superheating stage.

3. The thermodynamic cycle as claimed in claim 1 , wherein the steam is kept in a wet steam state at an outlet from the medium-pressure module.

4. The thermodynamic cycle as claimed in claim 1 , wherein the first drying and/or superheating cycle adjusts the drying and/or the superheating in such a way that a moisture content substantially within a range from 5% to 15% is obtained at an outlet of the medium-pressure turbine.

5. The thermodynamic cycle as claimed in claim 1 , wherein the second cycle adjusts the drying and/or the superheating in such a way that a moisture content substantially within a range from 5% to 15% is obtained at an outlet of the low-pressure turbine.

6. The thermodynamic cycle as claimed in claim 1 , wherein the high-pressure module adjusts a moisture content so that it is substantially within a range from 5% to 15% at an outlet of said high-pressure module before the first drying and/or superheating cycle.

7. The thermodynamic cycle as claimed claim 2 , wherein the second steam bleed point is at an intermediate stage of the high-pressure module.

8. The thermodynamic cycle as claimed in claim 1 ,

wherein the second steam bleed point is downstream of the first bleed point.

9. An electricity generating plant comprising:

at least a nuclear energy source, and

a turbine including:

at least a high-pressure module,

a medium-pressure module, and

a low-pressure module, wherein the modules are interconnected by a steam circuit adapted to make the steam flow successively through the high-pressure, medium-pressure and low-pressure modules;

at least a dryer and a superheater located between the high-pressure and medium-pressure modules; and

at least one second dryer and a second superheater locate between the medium-pressure and the low-pressure modules,

wherein the superheater is provided with steam taken from a first steam bleed point of the high-pressure module and the second superheater is provided with steam taken from a second steam bleed point of the high-pressure module.

Assignments (5)
MERGER Recorded Mar 21, 2025
From: ARABELLE TECHNOLOGIES
To: ARABELLE SOLUTIONS FRANCE
Reel/Frame 070587/0348 →
NUNC PRO TUNC ASSIGNMENT Recorded Nov 26, 2024
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: POWER SOLUTIONS GAMMA FRANCE
Reel/Frame 069450/0966 →
CHANGE OF NAME Recorded Nov 26, 2024
From: POWER SOLUTIONS GAMMA FRANCE
To: ARABELLE TECHNOLOGIES
Reel/Frame 069451/0916 →
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 26, 2012
From: JOURDAIN, VINCENT; COLIN, JEROME; LEVAN, HOAN
To: ALSTOM TECHNOLOGY LTD.
Reel/Frame 028444/0050 →