IP Library Granted Patent US 9,074,532
Granted Patent B2
US 9,074,532 · App. 13/354,698 · Granted Jul 7, 2015

Power generation plant

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,074,532
App. No.
13/354,698
Granted
Jul 7, 2015
Kind
B2
Abstract

A power-generation plant 10 including a gas turbine 11 ; a fuel-gas cooler 13 ; and an extraction line 24 that guides the fuel gas extracted from an intermediate stage of a fuel-gas compressor 12 to the fuel-gas cooler 13 ; a first level detector 61 that detects whether a level of the coolant accumulated at a bottom portion of the fuel-gas cooler 13 has reached a predetermined level; and a controller that stops the gas turbine 11 on the basis of a detection signal sent from the first level detector 61 and that outputs a command signal for stopping a coolant pump 53 that supplies the coolant to the spray nozzles 44 and 45.

Claims (24)

1. A power-generation plant comprising:

a gas turbine that combusts fuel gas;

a fuel-gas cooler that cools the fuel gas, which is pressurized at a fuel-gas compressor and recirculated, with coolant sprayed from a spray nozzle;

an extraction line that guides the fuel gas extracted from an intermediate stage of the fuel-gas compressor to the fuel-gas cooler;

a first level detector that detects whether a level of the coolant accumulated at a bottom portion of the fuel-gas cooler has reached a predetermined level; and

a controller configured to stop the gas turbine on the basis of a detection signal sent from the first level detector and that outputs a command signal for stopping a coolant pump that supplies the coolant to the spray nozzle.

2. A power-generation plant according to claim 1 , further comprising:

a bypass line that guides the fuel gas, which is pressurized at the fuel-gas compressor and recirculated, to the fuel-gas cooler;

a second level detector that detects whether a level of the coolant accumulated in the bypass line has reached a predetermined level; and

a controller that stops the gas turbine on the basis of a detection signal sent from the second level detector and that outputs a command signal for stopping the coolant pump that supplies the coolant to the spray nozzle.

3. A power-generation plant according to claim 1 , further comprising:

a coolant pipe that supplies the coolant to the spray nozzle,

wherein the coolant pipe is provided with a bypass pipe that returns the coolant to the interior of the fuel-gas cooler by bypassing the spray nozzle.

4. A power-generation plant according to claim 3 , wherein a pipe leading to the spray nozzle is provided with a pressure detector for detecting the pressure of the coolant that passes through the pipe.

5. A method of stopping a power-generation plant including

a gas turbine that combusts fuel gas;

a fuel-gas cooler that cools the fuel gas, which is pressurized at a fuel-gas compressor and recirculated, with coolant sprayed from a spray nozzle; and

an extraction line that guides the fuel gas extracted from an intermediate stage of the fuel-gas compressor to the fuel-gas cooler,

the method comprising:

stopping the gas turbine when a level of the coolant accumulated at a bottom portion of the fuel-gas cooler has reached a predetermined level; and

stopping a coolant pump, which supplies the coolant to the spray nozzle.

6. A method of stopping a power-generation plant according to claim 5 , further comprising:

stopping the gas turbine when a level of the coolant accumulated in a bypass line that guides the fuel gas, which is pressurized at the fuel-gas compressor and recirculated, to the fuel-gas cooler has reached a predetermined level; and

stopping the coolant pump, which supplies the coolant to the spray nozzle.

Assignments (4)
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVING PATENT APPLICATION NUMBER 11921683 PREVIOUSLY RECORDED AT REEL: 054975 FRAME: 0438. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded May 26, 2023
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 063787/0867 →
CHANGE OF NAME Recorded Jan 13, 2021
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 054975/0438 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 6, 2015
From: MITSUBISHI HEAVY INDUSTRIES, LTD.
To: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
Reel/Frame 034910/0416 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 30, 2012
From: TANABE, HIROSHI
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 027965/0257 →