IP Library Patent Application 13392967
Patent Application
App. No. 13/392,967

AUTOMATED PROCESSES FOR THE PRODUCTION OF POLYURETHANE WIND TURBINE BLADES

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
13/392,967
Abstract

The present invention provides processes for the production of polyurethane wind turbine blades and other large objects. The inventive process involves forming a mold for the polyurethane wind turbine blade at a wind farm site, injecting an isocyanate and an isocyanate-reactive component with an automated reaction injection molding (“RIM”) machine into the mold, closing, pressing and heating the mold to cure the resulting polyurethane and installing the polyurethane blade in the wind turbine. Alternatively, the process involves forming a mold for polyurethane wind turbine blade at a wind farm site, injecting an isocyanate, an isocyanate-reactive component and long fibers with an automated long fiber injection (“LFI”) machine, closing, pressing and heating the mold to cure the resulting polyurethane and installing the polyurethane blade in the wind turbine. Because the inventive manufacturing process occurs at the wind farm site, transportation problems are obviated.

Claims (20)

1 . A process for manufacturing a polyurethane wind turbine blade comprising:

forming a mold for the wind turbine blade at or near a wind farm site;

injecting an isocyanate and an isocyanate reactive-component with an automated reaction injection molding (“RIM”) machine into the mold;

closing, pressing and heating the mold to cure the resulting polyurethane; and

installing the blade into the wind turbine.

2 . The process according to claim 1 , wherein the polyurethane is cured using radiation.

3 . The process according to claim 1 , wherein the forming is accomplished by large scale rapid prototyping.

4 . The process according to claim 1 , wherein the forming is accomplished by additive automated fabrication.

5 . The process according to claim 1 , wherein the forming comprises fabricating a positive image of the wind turbine blade with large scale rapid prototyping, forming a negative image and casting or molding a high strength composite.

6 . The process according to claim 4 , wherein the high strength composite comprises at least one of metal, cement and polymer.

7 . A process for manufacturing a polyurethane wind turbine blade comprising:

forming a wind turbine blade mold at or near a wind farm site;

injecting an isocyanate, an isocyanate-reactive component and long fibers with an automated long fiber injection (“LFI”) machine;

closing, pressing and heating the mold to cure the resulting polyurethane; and

installing the blade into the wind turbine.

8 . The process in claim 7 , wherein the polyurethane is cured using radiation.

9 . The process according to claim 7 , wherein the forming is accomplished by large scale rapid prototyping.

10 . The process according to claim 7 , wherein the forming is accomplished by additive automated fabrication.

11 . The process according to claim 7 , wherein forming comprises fabricating a positive image of the wind turbine blade with large scale rapid prototyping, forming a negative image and casting or molding a high strength composite.

12 . The process according to claim 11 , wherein the high strength composite comprises one or more selected from metal, cement and polymer.

Assignments (2)
CHANGE OF NAME Recorded Oct 16, 2015
From: BAYER MATERIALSCIENCE LLC
To: COVESTRO LLC
Reel/Frame 036876/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 28, 2012
From: PYLES, ROBERT A; MATSCO, JOEL
To: BAYER MATERIALSCIENCE LLC