IP Library Granted Patent US 9,956,615
Granted Patent B2
US 9,956,615 · App. 13/414,769 · Granted May 1, 2018

Titanium powder production apparatus and method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,956,615
App. No.
13/414,769
Granted
May 1, 2018
Kind
B2
Abstract

A method and apparatus for producing titanium metal powder from a melt. The apparatus includes an atomization chamber having an inner wall that is coated with or formed entirely of CP-Ti to prevent contamination of titanium metal powder therein. The inner surfaces of all components of the apparatus in a flow path following the atomization chamber may also be coated with or formed entirely of CP-Ti.

Claims (5)

1. Apparatus for producing titanium metal powder from a melt including titanium powder metal, comprising an atomization chamber having an inner wall that is coated with or formed entirely of commercially pure titanium to prevent contamination of titanium metal powder therein, further comprising a powder conveying tube connected to an exit opening of the atomization chamber, a cyclone separator connected to the powder conveying tube and a powder container connected to the cyclone separator, and wherein inner surfaces of the conveying tube, the cyclone separator and the powder container are coated with or formed entirely of commercially pure titanium.

2. A method for preventing contamination of titanium powder in an apparatus for producing it from a melt including titanium powder metal, the apparatus having an atomization chamber with an inner wall, comprising coating the inner wall or forming it entirely of commercially pure titanium, wherein the apparatus further comprises a conveying tube, a cyclone separator and a powder container in a flow path following the atomization chamber, and coating inner surfaces of the conveying tube, the cyclone separator and the powder container with commercially pure titanium or forming the inner surfaces thereof entirely of commercially pure titanium.

3. A method for preventing contamination of titanium powder in an apparatus for producing it from a melt including titanium powder metal, the apparatus having an atomization chamber with an inner wall, comprising coating the inner wall or forming it entirely of commercially pure titanium, and further comprising coating inner surfaces of all components of the apparatus in a flow path following the atomization chamber with commercially pure titanium or forming the inner surfaces entirely of commercially pure titanium.

4. Apparatus for producing titanium metal powder from a melt including titanium powder metal, comprising an atomization chamber having an inner wall that is coated with commercially pure titanium to prevent contamination of titanium metal powder therein, wherein the inner wall is formed of stainless steel.

5. A method for preventing contamination of titanium powder in an apparatus for producing it from a melt including titanium powder metal, the apparatus having an atomization chamber with an inner wall, comprising coating the inner wall with commercially pure titanium, wherein the inner wall is formed of stainless steel.

Assignments (6)
RELEASE OF SECURITY INTEREST Recorded Nov 20, 2025
From: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
To: CARPENTER TECHNOLOGY CORPORATION
Reel/Frame 072983/0743 →
SECURITY INTEREST Recorded Apr 14, 2023
From: CARPENTER TECHNOLOGY CORPORATION
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 063326/0230 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 7, 2017
From: PURIS, LLC
To: CARPENTER TECHNOLOGY CORPORATION
Reel/Frame 041927/0498 →
CORRECTIVE ASSIGNMENT TO CORRECT THE NATURE OF CONVEYANCE PREVIOUSLY RECORDED ON REEL 041024 FRAME 0988. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jan 24, 2017
From: FMW COMPOSITE SYSTEMS, INC.
To: PURIS, LLC
Reel/Frame 041465/0019 →
SECURITY INTEREST Recorded Jan 20, 2017
From: FMW COMPOSITE SYSTEMS, INC.
To: PURIS, LLC
Reel/Frame 041024/0988 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 23, 2012
From: HANUSIAK, WILLIAM M.; MCBRIDE, DALE R.
To: FMW COMPOSITE SYSTEMS, INC.
Reel/Frame 028254/0248 →