IP Library Granted Patent US 8,890,505
Granted Patent B2
US 8,890,505 · App. 13/466,725 · Granted Nov 18, 2014

System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management

Inventor: Joseph W. Forbes, Jr. (Raleigh, NC)
Assignee: Causam Energy, Inc.
H02J3/14G06Q10/00H02J2003/003Y04S20/222Y02B70/3225Y04S10/54
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,890,505
App. No.
13/466,725
Granted
Nov 18, 2014
Kind
B2
Abstract

A method for generating a value for available operating reserve for electric utility. Electric power consumption by at least one device is determined during at least one period of time to produce power consumption data, stored in a repository. Prior to a control event for power reduction and under an assumption that it is not to occur, power consumption behavior expected of the device(s) is determined for a time period during which the control event is expected to occur based on stored power consumption data. Additionally, prior to the control event, projected energy savings resulting from the control event, and associated with a power supply value (PSV) are determined based on devices' power consumption behavior. Amount of available operating reserve is determined based on projected energy savings.

Claims (19)

1. A method for a client device located at an electrical service point to control a flow of electric power from an electric power grid to the service point so as to provide operating reserve to the electric power grid, the service point including at least one power consuming device operable to consume electric power, at least one controllable device operable to control a flow of grid-supplied electric power to the at least one power consuming device, and a backup power subsystem operable to supply electric power to the at least one power consuming device when a flow of grid-supplied electric power to the at least one power consuming device is reduced below a threshold, the method comprising:

receiving power control messages from a remote system control component, at least a first power control message instructing the client device to disable a flow of grid-supplied electric power to the at least one power consuming device; and

providing a first power control instruction to the at least one controllable device responsive to the first power control message, the first power control instruction instructing the at least one controllable device to disable a flow of grid-supplied electric power to the at least one power consuming device, thereby causing activation of the backup power subsystem, wherein an amount of grid-supplied electric power saved as a result of disabling a flow of grid-supplied electric power to the at least one power consuming device provides operating reserve for the electric power grid based upon a power supply value (PSV) associated with each of the at least one power consuming device(s).

2. The method of claim 1 , further comprising:

receiving a second power control message from the remote system control component, the second power control message instructing the client device to enable a flow of grid-supplied electric power to the at least one power consuming device; and

providing a second power control instruction to the at least one controllable device responsive to the second power control message, the second power control instruction instructing the at least one controllable device to enable a flow of grid-supplied electric power to the at least power consuming device.

3. The method of claim 2 , wherein the second power control message is received upon expiration of a control event during which an electric utility supplies operating reserve to the electric power grid.

4. The method of claim 1 , wherein the first power control message indicates at least one of an amount of electric power to be reduced and an identification of at least one controllable device to be instructed to disable a flow of electric power to one or more associated power consuming devices, and generating the power supply value (PSV) therefor.

5. A method for a client device located at an electrical service point to control a flow of electric power from an electric power grid to the service point, the service point including at least one power consuming device operable to consume electric power, at least one controllable device operable to control a flow of grid-supplied electric power to the at least one power consuming device, and a backup power subsystem operable to supply electric power to the at least one power consuming device when a flow of grid-supplied electric power to the at least one power consuming device is reduced below a threshold, the method comprising:

receiving power control messages from a remote system control component, at least a first power control message instructing the client device to disable a flow of grid-supplied electric power to the at least one power consuming device; and

providing a first power control instruction to the at least one controllable device responsive to the first power control message, the first power control instruction instructing the at least one controllable device to disable a flow of grid-supplied electric power to the at least one power consuming device, thereby causing activation of the backup power subsystem, wherein an amount of grid-supplied electric power saved as a result of disabling a flow of grid-supplied electric power to the at least power consuming device functions as operating reserve for the electric power grid, and is based on a power supply value (PSV) corresponding to each of the at least one power-consuming device(s) and the power saved associated with them.

6. A method for a subsystem located at an electrical service point to reduce consumption of electric power supplied from an electric power grid to a service point, the subsystem including a client device in communication with a remotely located system control component and operable to control a flow of grid-supplied electric power to at least one power consuming device located at the service point, and a backup power subsystem operable to supply electric power to the at least one power consuming device when a flow of grid-supplied electric power to the at least one power consuming device is reduced below a threshold, the method comprising:

receiving, by the client device, a power control message from the remote system control component, the power control message instructing the client device to disable a flow of grid-supplied electric power to the at least one power consuming device;

disabling, by the client device, a flow of grid-supplied electric power to the at least one power consuming device responsive to the power control message;

determining, by the backup power subsystem, that the flow of grid-supplied electric power to the at least one power consuming device has dropped below the threshold responsive to disablement of the grid-supplied electric power by the client device; and

supplying, by the backup power subsystem, electric power for use by the at least one power consuming device responsive to determining that the flow of grid-supplied electric power to the at least one power consuming device has dropped below a threshold, wherein the electric power supplied to the at least one power consuming device(s) has a corresponding power supply value (PSV).

7. The method of claim 6 , wherein the subsystem further includes a frequency synchronizer coupled to the backup power subsystem and the electrical grid, the method further comprising:

synchronizing, by the frequency synchronizer, a frequency of the electric power supplied by the backup power subsystem to an alternating current frequency used by the electrical grid so as to deliver at least some of the electric power supplied by the backup power subsystem to the electric power grid.

8. The method of claim 7 , wherein the power delivered to the electrical grid by the frequency synchronizer is power in excess of power required to operate the at least one power consuming device when the flow of grid-supplied electric power to the at least one power consuming device has dropped below the threshold.

Assignments (4)
LICENSE Recorded Jul 28, 2023
From: CAUSAM ENTERPRISES, INC.
To: CAUSAM EXCHANGE, INC.
Reel/Frame 064492/0881 →
CHANGE OF NAME Recorded May 28, 2021
From: CAUSAM ENERGY, INC.
To: CAUSAM ENTERPRISES, INC.
Reel/Frame 056423/0728 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 7, 2013
From: BCIP VENTURES LLC
To: CAUSAM ENERGY, INC.
Reel/Frame 031564/0824 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 30, 2012
From: FORBES, JOSEPH W., JR.
To: BCIP VENTURES LLC
Reel/Frame 029387/0707 →
Continuity (6)
Continuation In Part 12775979 · May 7, 2010
Continuation In Part 13019867 · Feb 2, 2011
Continuation In Part 12001819 · Dec 13, 2007
Continuation In Part 11895909 · Aug 28, 2007
Provisional Application 61215725 · May 8, 2009
Related Publication 20120239219A1 · Sep 20, 2012