IP Library Patent Application 13476414
Patent Application
App. No. 13/476,414

HEATING SYSTEM AND METHODS FOR CONTROLLING THE HEATERS OF A HEATING SYSTEM

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
13/476,414
Abstract

A method for controlling a plurality of heaters of a heating system is disclosed. The method may generally include generating control commands for turning on the plurality of heaters during a time period, determining which electrical phase is powering each heater of the plurality of heaters and staggering execution of the control commands across the time period for two or more of the heaters powered by the same electrical phase.

Claims (26)

1 . A method for controlling a plurality of heaters of a heating system, the method comprising:

generating control commands for turning on the plurality of heaters during a time period;

determining which electrical phase is powering each heater of the plurality of heaters; and

staggering execution of the control commands across the time period for two or more of the heaters powered by the same electrical phase.

2 . The method of claim 1 , wherein the time period comprises a plurality of time intervals, further comprising dividing the control command for each heater across a number of the time intervals such that each control command is executed across a time interval group.

3 . The method of claim 2 , wherein staggering execution of the control commands across the time period for two or more of the heaters powered by the same electrical phase comprises staggering the time interval groups for each of the two or more heaters across the time period.

4 . The method of claim 3 , wherein staggering the time interval groups for each of the two or more heaters across the time period comprises staggering the time interval groups such that a current draw for each time interval is less than a predetermined current draw threshold.

5 . The method of claim 3 , wherein staggering the time interval groups for each of the two or more heaters across the time period comprises staggering the time interval groups such that a current draw for each time interval is less than a maximum combined current draw for the two or more heaters.

6 . The method of claim 3 , wherein staggering the time interval groups for each of the two or more heaters across the time period comprises staggering the time interval groups such that a current draw for each time interval is substantially the same as the current draw for the other time intervals.

7 . The method of claim 1 , further comprising prioritizing the control commands based on a full scale current draw for each of the two or more heaters.

8 . The method of claim 7 , wherein prioritizing the control commands based on a full scale current draw for the two or more heaters comprises prioritizing the control commands such that the control commands with the largest full scale current draws are staggered first.

9 . The method of claim 1 , wherein generating control commands for turning on a plurality of heaters during a time period comprises generating the control commands with a controller using at least one PID control loop.

10 . The method of claim 9 , wherein the time period comprises a PID time period for the at least one PID control loop.

11 . A heating system, comprising:

a plurality of heaters; and

a controller in communication with the plurality of heaters, the controller being configured to both generate control commands for turning on the plurality of heaters during a time period and determine which electrical phase is powering each heater of the plurality of heaters,

wherein the controller is further configured to stagger execution of the control commands across the time period for two or more of the heaters powered by the same electrical phase.

12 . The system of claim 11 , wherein the time period comprises a plurality of time intervals, wherein the controller is further configured to divide the control command for each heater across a number of the time intervals such that each control command is executed across a time interval group.

13 . The system of claim 12 , wherein the controller is configured to stagger the time interval groups across the time period such that a current draw for each time interval is less than at least one of a predetermined current draw threshold or a maximum combined current draw for the two or more heaters.

14 . The system of claim 12 , wherein the controller is configured to stagger the time interval groups across the time period such that a current draw for each time interval is substantially the same as the current draw for the other time intervals.

15 . The system of claim 11 , wherein the controller is further configured to prioritize the control commands based on a full scale current draw for each of the two or more heaters.

16 . The system of claim 15 , wherein the control commands are prioritized according to descending full scale current draws.

17 . The system of claim 11 , wherein the controller is configured to generate the control commands using at least one PID control loop.

18 . The system of claim 17 , wherein the time period comprises a PID time period for the at least one PID control loop.

19 . The system of claim 11 , wherein each control command corresponds to a percentage of the time period within which at least one of the heaters is to be turned on.

20 . The system of claim 11 , wherein the controller comprises a plurality of sub-controllers, each of the plurality of sub-controllers being configured to control the operation of at least one of the plurality of heaters.

Assignments (4)
CORRECTIVE ASSIGNMENT TO CORRECT THE APPLICATION NUMBER FROM '13/301162' PREVIOUSLY RECORDED ON REEL 032045 FRAME 0657. ASSIGNOR(S) HEREBY CONFIRMS THE CORRECT APPLICATION NUMBER SHOULD BE '13/601162'. Recorded Feb 10, 2014
From: FIRST SOLAR MALAYSIA SDN. BHD.
To: FIRST SOLAR, INC.
Reel/Frame 032239/0005 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 14, 2014
From: FIRST SOLAR MALAYSIA SDN. BHD.
To: FIRST SOLAR, INC.
Reel/Frame 032045/0657 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 5, 2013
From: PRIMESTAR SOLAR, INC.
To: FIRST SOLAR MALAYSIA SDN. BHD.
Reel/Frame 031581/0891 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 21, 2012
From: HALLORAN, SEAN TIMOTHY; SCHAEFER, JAMES VICTOR
To: PRIMESTAR SOLAR, INC.
Reel/Frame 028241/0658 →