IP Library Granted Patent US 8,961,326
Granted Patent B2
US 8,961,326 · App. 13/476,469 · Granted Feb 24, 2015

Suspended flying rig system

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,961,326
App. No.
13/476,469
Granted
Feb 24, 2015
Kind
B2
Abstract

A suspended flying rig system including a plurality of cables attached to a load support. In response to retraction and/or deployment of at least one of the plurality of cables, motion is provided generally within a three-dimensional working space to the load support. The motion includes at least six degrees of freedom.

Claims (16)

1. A suspended flying rig system comprising:

a plurality of cables attached to a load support; wherein the plurality of cables includes at least three pairs of cables attached to the load support, attachment points of each pair of cables of the at least three pairs of cables to the load support are separated by a first spacing that is greater than a second spacing separating attachment points of cables of adjacent pairs of cables of the at least three pairs of cables to the load support;

in response to retraction and/or deployment of at least one of the plurality of cables, motion is provided generally within a three-dimensional working space to the load support;

wherein the motion includes at least six degrees of freedom and movement along at least three axes and rotation about the at least three axes; and the at least three axes are mutually perpendicular to each other.

2. The system of claim 1 , wherein the rotation about the at least three axes includes a roll, pitch and yaw.

3. The system of claim 1 , wherein a plurality of winch assemblies are assembled to a support structure.

4. The system of claim 1 , wherein a plurality of pulleys for guiding the plurality of cables are mounted to a support structure.

5. The system of claim 4 , wherein the plurality of pulleys are arranged within or on guides that move the plurality of pulleys, providing dynamic res-sizing and re-shaping of the three dimensional space.

6. A method for positioning and orienting a load generally within a three-dimensional working space comprising:

providing a suspended flying system comprising a plurality of cables attached to a load support; wherein the plurality of cables includes at least three pairs of cables attached to the load support, attachment points of each pair of cables of the at least three pairs of cables to the load support are separated by a first spacing that is greater than a second spacing separating attachment points of cables of adjacent pairs of cables of the at least three pairs of cables to the load support; and

selectively retracting and deploying at least one of the plurality of cables to achieve a motion of the load support that includes at least six degrees of freedom;

wherein said motion includes movement along at least three axes and rotation about the at least three axes and said at least three axes are mutually perpendicular to each other.

7. The method of claim 6 , wherein the rotation about the at least three axes includes a roll, pitch and yaw.

8. The method of claim 6 , further providing a plurality of winch assemblies assembled to a support structure for receiving the plurality of cables.

9. The method of claim 6 , further providing a plurality of pulleys mounted to a support structure for guiding the plurality of cables.

10. The method of claim 9 , further arranging the plurality of pulleys within or on guides that move the plurality of pulleys, providing dynamic re-sizing and re-shaping of the three-dimensional working space.

Assignments (11)
RELEASE OF SECURITY INTEREST Recorded Oct 2, 2024
From: JEFFERIES FINANCE LLC, AS AGENT
To: TAIT TOWERS MANUFACTURING LLC
Reel/Frame 069175/0282 →
SECURITY INTEREST Recorded Oct 1, 2024
From: TAIT TOWERS MANUFACTURING LLC; THINKWELL GROUP, LLC
To: UBS AG, STAMFORD BRANCH, AS COLLATERAL AGENT
Reel/Frame 069084/0065 →
RELEASE OF SECURITY INTEREST Recorded Mar 29, 2019
From: BANK OF AMERICA, N.A.
To: TAIT TOWERS MANUFACTURING LLC
Reel/Frame 048745/0408 →
SECURITY INTEREST Recorded Mar 29, 2019
From: TAIT TOWERS MANUFACTURING LLC
To: JEFFERIES FINANCE LLC, ADMINISTRATIVE AGENT
Reel/Frame 048747/0250 →
RELEASE OF SECURITY INTEREST Recorded Feb 22, 2019
From: TAIT TOWERS MANUFACTURING LLC
To: HIGHBRIDGE PRINCIPAL STRATEGIES, LLC
Reel/Frame 048414/0714 →
SECURITY INTEREST Recorded Aug 14, 2018
From: TAFT TOWERS MANUFACTURING LLC
To: BANK OF AMERICA, N.A.
Reel/Frame 046801/0622 →
ASSIGNMENT FOR SECURITY -- PATENTS Recorded Apr 1, 2015
From: TAIT TOWERS MANUFACTURING LLC
To: HIGHBRIDGE PRINCIPAL STRATEGIES, LLC, AS COLLATERAL AGENT
Reel/Frame 035354/0033 →
TERMINATION AND RELEASE OF SECURITY INTEREST IN TRADEMARKS AND PATENTS Recorded Apr 1, 2015
From: WELLS FARGO BANK, NATIONAL ASSOCIATION
To: TAIT TOWERS MANUFACTURING LLC
Reel/Frame 035354/0118 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 3, 2013
From: FTSI, LLC
To: TAIT TOWERS MANUFACTURING, LLC
Reel/Frame 031334/0521 →
SECURITY AGREEMENT Recorded May 3, 2013
From: TAIT TOWERS MANUFACTURING LLC
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 030341/0216 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 21, 2012
From: FISHER, SCOTT
To: FTSI, LLC
Reel/Frame 028241/0981 →