IP Library Granted Patent US 8,983,429
Granted Patent B2
US 8,983,429 · App. 13/483,150 · Granted Mar 17, 2015

Temporarily disable out-of-credit PCC rule

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,983,429
App. No.
13/483,150
Granted
Mar 17, 2015
Kind
B2
Abstract

Various exemplary embodiments relate to a method performed by a policy and charging rules node (PCRN), the method comprising: receiving an event trigger from a policy and charging enforcement node (PCEN) indicating that a subscriber is out of credit; installing temporary PCC rules to handle the out of credit status of the subscriber; receiving an indication that the subscriber has completed a reallocation of credit action; uninstalling the temporary PCC rules and restoring the original PCC rules after receiving an indication of reallocation of credit.

Claims (70)

1. A method performed by a policy and charging rules node (PCRN), the method comprising:

receiving an event trigger associated with a first set of policy and charging control (PCC) rules from a policy and charging enforcement node (PCEN) indicating that a subscriber is out of credit;

creating a second set of rules to handle the out of credit status of the subscriber;

installing the second set of rules;

receiving an indication that the subscriber has received a reallocation of credit;

uninstalling the second set of rules after receiving an indication that the subscriber has completed the reallocation of credit operation; and

determining that a first set of PCC rules associated with the event trigger has a temporary inactive status.

2. A method performed by a policy and charging rules node (PCRN), the method comprising:

receiving an event trigger associated with a first set of policy and charging control (PCC) rules from a policy and charging enforcement node (PCEN) indicating that a subscriber is out of credit;

creating a second set of rules to handle the out of credit status of the subscriber;

installing the second set of rules;

receiving an indication that the subscriber has received a reallocation of credit; and

uninstalling the second set of rules after receiving an indication that the subscriber has completed the reallocation of credit operation;

determining that the first set of PCC rules associated with the event trigger has an active status or PCC-rule-status is not found in a corresponding charging-rule-report AVP;

setting a flow status for the first set of PCC rules to disabled; and

after receiving an indication that the subscriber has received a reallocation of credit: setting the flow status for the first set of PCC rules to enabled after receiving an indication that the subscriber has received a reallocation of credit.

3. The method of claim 1 , further comprising receiving a final unit action (FUA) from the PCEN, and wherein an action associated with the first set of PCC rules is based upon the FUA.

4. The method of claim 3 , wherein the FUA indicates a redirection.

5. The method of claim 4 , wherein the redirection directs the subscriber to a redirect server.

6. The method of claim 3 , wherein the FUA indicates temporary free access for the subscriber.

7. The method of claim 1 further comprising:

receiving another event trigger associated with a first set of PCC rules from the PCEN indicating that a subscriber is out of credit;

determining that a third set of policy and charging control (PCC) rules associated with the other event trigger has a status of active or a rule status is not found in a corresponding charging-rule-report AVP;

setting a flow status for the third PCC rule to disabled;

installing a fourth set of PCC rules to handle the out of credit status of the subscriber;

receiving another indication that the subscriber has received a reallocation of credit;

setting the flow status for the third set of PCC rules to enabled after receiving an indication that the subscriber has received a reallocation of credit; and

uninstalling the fourth set of PCC rules after receiving an indication that the subscriber has received a reallocation of credit.

8. A policy and charging rules node (PCRN), comprising:

a network interface configured to:

receive an event trigger associated with a first set of policy and charging control (PCC) rules from a policy and charging enforcement node (PCEN) indicating that a subscriber is out of credit; and

receive an indication that the subscriber has received a reallocation of credit;

a PCC rules engine configured to:

create a second set of rules to handle the out of credit status of the subscriber;

install the second set of rules;

uninstall the second set of rules after receiving an indication that the subscriber has completed the reallocation of credit operation; and

determine that a first set of PCC rules associated with the event trigger has a temporary inactive status.

9. A policy and charging rules node (PCRN), comprising:

a network interface configured to:

receive an event trigger associated with a first set of policy and charging control (PCC) rules from a policy and charging enforcement node (PCEN) indicating that a subscriber is out of credit; and

receive an indication that the subscriber has received a reallocation of credit;

a PCC rules engine configured to:

create a second set of rules to handle the out of credit status of the subscriber;

install the second set of rules; and

uninstall the second set of rules after receiving an indication that the subscriber has completed the reallocation of credit operation;

determine that the first set of PCC rules associated with the event trigger has an active status or PCC-rule-status is not found in a corresponding charging-rule-report AVP;

set a flow status for the first set of PCC rules to disabled; and

after the network interface receives an indication that the subscriber has received a reallocation of credit: set the flow status for the first set of PCC rules to enabled after receiving an indication that the subscriber has received a reallocation of credit.

10. The PCRN of claim 8 , wherein the network interface is further configured to receive a final unit action (FUA) from the PCEN, and wherein an action associated with the first set of PCC rules is based upon the FUA.

11. The PCRN of claim 10 , wherein the FUA indicates a redirection.

12. The PCRN of claim 11 , wherein the redirection directs the subscriber to a redirect server.

13. The PCRN of claim 10 , wherein the FUA indicates temporary free access for the subscriber.

14. A non-transitory machine-readable storage medium encoded with instructions for execution by a policy and charging rules node (PCRN), the medium comprising:

instructions for receiving an event trigger associated with a first set of policy and charging control (PCC) rules from a policy and charging enforcement node (PCEN) indicating that a subscriber is out of credit;

instructions for creating a second set of rules to handle the out of credit status of the subscriber;

instructions for installing the second set of rules;

instructions for receiving an indication that the subscriber has received a reallocation of credit;

instructions for uninstalling the second set of rules after receiving an indication that the subscriber has completed the reallocation of credit operation; and

instructions for receiving a final unit action (FUA) from the PCEN, and wherein an action associated with the first set of PCC rules is based upon the FUA.

15. A non-transitory machine-readable storage medium encoded with instructions for execution by a policy and charging rules node (PCRN), the medium comprising:

instructions for receiving an event trigger associated with a first set of policy and charging control (PCC) rules from a policy and charging enforcement node (PCEN) indicating that a subscriber is out of credit;

instructions for creating a second set of rules to handle the out of credit status of the subscriber;

instructions for installing the second set of rules;

instructions for receiving an indication that the subscriber has received a reallocation of credit;

instructions for uninstalling the second set of rules after receiving an indication that the subscriber has completed the reallocation of credit operation;

instructions for determining that the first set of PCC rules associated with the event trigger has an active status or PCC-rule-status is not found in a corresponding charging-rule-report AVP;

instructions for setting a flow status for the first set of PCC rules to disabled; and

instructions for after receiving an indication that the subscriber has received a reallocation of credit: setting the flow status for the first set of PCC rules to enabled after receiving an indication that the subscriber has received a reallocation of credit.

16. The non-transitory machine-readable storage medium of claim 14 , wherein the FUA indicates a redirection.

17. The non-transitory machine-readable storage medium of claim 14 , further comprising instructions for determining that the first set of PCC rules associated with the event trigger has a temporary inactive status.

Assignments (4)
RELEASE OF SECURITY INTEREST Recorded Sep 4, 2014
From: CREDIT SUISSE AG
To: ALCATEL-LUCENT CANADA INC.
Reel/Frame 033686/0798 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 14, 2013
From: ALCATEL-LUCENT CANADA INC.
To: ALCATEL LUCENT
Reel/Frame 030615/0667 →
SECURITY INTEREST Recorded Jan 30, 2013
From: ALCATEL-LUCENT CANADA INC.
To: CREDIT SUISSE AG
Reel/Frame 029826/0927 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 30, 2012
From: XUE, XIONG; MAO, IVY; SHAIK, SHANAWAZ
To: ALCATEL-LUCENT CANADA INC.
Reel/Frame 028285/0287 →