IP Library Granted Patent US 9,620,990
Granted Patent B2
US 9,620,990 · App. 13/500,120 · Granted Apr 11, 2017

Electricity supply management device

Inventor: Kiyotaka Takehara (Nara, JP)
Assignee: Panasonic Intellectual Property Management Co., Ltd.
H02J7/35H02J3/14H02J3/32H02J3/383Y02B10/14Y02B70/3225Y02E10/563Y02E10/566Y02E70/30Y04S20/222Y10T307/336
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,620,990
App. No.
13/500,120
Granted
Apr 11, 2017
Kind
B2
Abstract

An electricity supply management device includes a solar cell; a commercial Alternating Current (AC) power source; and a storage battery, in which the storage battery is charged by an electric power from the solar cell, and a power from at least one of the solar cell, the commercial AC power source and the storage battery is supplied to one or more load devices. A power consumption level by the load devices is controlled based on comparison result between a power generation amount by the solar cell and a power consumption amount by the load devices, and a charge level of the storage battery indicative of a ratio of charging to capacity of the storage battery.

Claims (34)

1. An electricity supply management device comprising:

a solar cell;

a storage battery; and

a power control device,

wherein the power control device includes:

an operation unit; and

a power consumption amount storage unit configured to store a total power consumption amount by a plurality of load devices,

wherein, in response to a request from the power control device, the storage battery is charged by an electric power from the solar cell, and a power from at least one of the solar cell, the storage battery, and a commercial Alternating Current (AC) power source is supplied to of the load devices,

wherein the operation unit of the power control device is configured to controls a power consumption level by the load devices based on a comparison result between a power generation amount by the solar cell, the total power consumption amount by the load devices, and a charge level of the storage battery indicative of a ratio of charged amount of the storage battery to capacity of the storage battery, and

wherein controlling the power consumption level by the load devices includes limiting the total power consumption amount by the load devices by a predetermined fraction thereof so as to not exceed a preset power level.

2. The electricity supply management device of claim 1 , wherein an electric power from the solar cell, in preference to an electric power from the commercial AC power source, is supplied to the load devices and the storage battery, and

when the power generation amount by the solar cell is larger than the total power consumption amount by the load devices and the charge level of the storage battery is equal to or lower than a reference charge level, the total power consumption amount by the load devices is limited not to exceed the preset power level.

3. The electricity supply management device of claim 2 , wherein, when the power generation amount by the solar cell is larger than the total power consumption amount by the load devices and the charge level of the storage battery is higher than the reference charge level, no limitation is imposed on the total power consumption amount by the load devices.

4. The electricity supply management device of claim 2 , wherein, when the power generation amount by the solar cell is equal to or smaller than the total power consumption amount by the load devices and the charge level of the storage battery is higher than the reference charge level, the total power consumption amount by the load devices is limited not to exceed a reference power level lower than the preset power level.

5. The electricity supply management device of claim 4 , wherein, when the power generation amount by the solar cell is equal to or lower than the total power consumption amount by the load devices and the charge level of the storage battery is equal to or lower than the reference charge level, the total power consumption amount by the load devices is limited not to exceed a backup power level lower than the reference power level.

6. The electricity supply management device of claim 2 , wherein the reference charge level is set to a level corresponding to a total amount of power consumed by the load devices during the night time.

7. The electricity supply management device of claim 2 , wherein, when a normal time span during which the electricity rate is normal and a low-rate time span during which the electricity rate is lower than the normal power rate are set as time spans based on which electricity rate of the power from the commercial AC power source is determined, a level corresponding to an amount of power obtained by subtracting a total amount of power consumed during the low-rate time span from a total amount of power consumed by the load devices in the nighttime is set as the reference charge level.

8. The electricity supply management device of claim 7 , wherein, when a time at which the power consumption by the load devices is controlled falls within the low-rate time span, the limiting level of the total power consumption amount by the load devices is made less stringent compared to the limiting level of the total power consumption amount by the load devices in a time span other than the low-rate time span.

9. A power control device for use in an electricity supply management device in which a storage battery is charged by an electric power from a solar cell, and a power from at least one of the solar cell, the storage battery, and a commercial alternating current power source is supplied to a plurality of load device,

wherein the power control device includes:

a solar cell;

an operation unit; and

a power consumption amount storage unit configured to store a total power consumption amount by the load devices,

wherein the operation unit of the power control device is configured to control a power consumption level by the load devices based on a comparison result between a power generation amount by the solar cell, a total power consumption amount by the load devices, and a charge level of the storage battery indicative of a ratio of charged amount of the storage battery to capacity of the storage battery, and

wherein controlling the power consumption level by the load devices includes limiting the total power consumption amount by the load devices by a predetermined fraction thereof so as to not exceed a preset power level.

10. A control method for use in an electricity supply management device in which a storage battery is charged by an electric power from a solar cell, and a power from at least one of the solar cell, a commercial alternating current power source and the storage battery is supplied to a plurality of load devices, the control method comprising:

obtaining, via a power control device:

a power generation amount by the solar cell:

a total power consumption amount by the load devices; and

a charge level of the storage battery indicative of a ratio of charged amount of the storage battery to capacity of the storage battery;

and comparing, via an operation unit of the power control device:

the power generation amount by the solar cell, the total power consumption amount by the load devices, and the charge level of the storage battery; and

controlling a power consumption level by the load devices based on the result of said comparing,

wherein controlling the power consumption level by the load devices includes limiting the total power consumption amount by the load devices by a predetermined fraction thereof so as to not exceed a preset power level.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE ERRONEOUSLY FILED APPLICATION NUMBERS 13/384239, 13/498734, 14/116681 AND 14/301144 PREVIOUSLY RECORDED ON REEL 034194 FRAME 0143. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Dec 24, 2020
From: PANASONIC CORPORATION
To: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.
Reel/Frame 056788/0362 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 10, 2014
From: PANASONIC CORPORATION
To: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.
Reel/Frame 034194/0143 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 22, 2012
From: KAKEHARA, KIYOTAKA
To: PANASONIC CORPORATION
Reel/Frame 029342/0488 →
Priority Claims (1)
JP 2009-232008 · Oct 5, 2009 · national
Continuity (1)
Related Publication 20120212050A1 · Aug 23, 2012