IP Library Granted Patent US 9,037,357
Granted Patent B2
US 9,037,357 · App. 13/512,856 · Granted May 19, 2015

Control system for hybrid construction machine

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,037,357
App. No.
13/512,856
Granted
May 19, 2015
Kind
B2
Abstract

A regeneration switching valve which communicates with a neutral flow path and a tank at a normal position and cuts off communication between the neutral flow path and the tank to cause the neutral flow path to communicate with a hydraulic motor for power generation at a switched position is provided in at least one of first and second circuit systems including a plurality of control valves.

Claims (19)

1. A control system for hybrid construction machine, comprising:

a pair of variable-capacity first and second main pumps, the discharge amounts of which are controlled by a control mechanism;

first and second circuit systems connected to the first and second main pumps;

a hydraulic motor for power generation which rotates when oil discharged from at least one of the first and second main pumps is supplied;

a generator coupled to the hydraulic motor for power generation;

a battery which stores power generated by the generator;

a plurality of control valves provided in the first and second circuit systems;

a tank;

a neutral flow path which introduces the oil discharged from the first and second main pumps to the tank when all of the plurality of control valves are at neutral positions; and

a regeneration switching valve which is provided in at least one of the first and second circuit systems, communicates with the neutral flow path and the tank at a normal position, and cuts off communication between the neutral flow path and the tank at a switched position to cause the neutral flow path to communicate with the hydraulic motor for power generation.

2. The control system according to claim 1 , wherein:

the regeneration switching valve is provided at a most downstream side of the one of the circuit systems.

3. The control system according to claim 1 , further comprising:

a controller;

a pilot electromagnetic control valve connected to the controller; and

a pilot pump connected to the regeneration switching valve via the pilot electromagnetic control valve;

wherein the regeneration switching valve is switched to the switched position when the pilot electromagnetic control valve is opened in response to an output signal of the controller.

4. The control system according to claim 1 , wherein:

the control mechanism for controlling the discharge amount of the other of the first and second main pumps controls the discharge amount of the other main pump to a minimum discharge amount when the regeneration switching valve is switched to the switched position.

Assignments (2)
CHANGE OF NAME Recorded Dec 21, 2015
From: KAYABA INDUSTRY CO., LTD.
To: KYB CORPORATION
Reel/Frame 037355/0086 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 30, 2012
From: KAWASAKI, HARUHIKO; EGAWA, MASAHIRO
To: KAYABA INDUSTRY CO., LTD.
Reel/Frame 028292/0124 →