IP Library Granted Patent US 8,986,423
Granted Patent B2
US 8,986,423 · App. 13/513,551 · Granted Mar 24, 2015

Heap leach operations

Inventors: Kent Lang (Denver, CO); Gilles Mathieu (Meudon, FR); Roland Banas (Tucson, AZ); Robert A. Will (Littleton, CO)
Assignee: Schlumberger Technology Corporation
C22B3/02C22B3/04C22B15/0065
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,986,423
App. No.
13/513,551
Granted
Mar 24, 2015
Kind
B2
Abstract

A method of heap leaching including forming a heap lift, installing a horizontal solution collection system between the heap layers including a horizontal tubing with a wireline data collection tool disposed therein, providing a heap leach model for modeling the heap leach operation including a solvent formulation and a irrigation setting, obtaining collected data from the wireline data collection tool while irrigating the heap lift, the collected data including in-situ material parameters of the heap layers and in-situ solution parameters of the solution flowing in the heap layers, modeling the heap leach operation using the collected data based on the heap leach model to generate a result, and adjusting the heap leach operation based on the result.

Claims (20)

1. A method of heap leaching comprising:

forming a heap lift comprising a first heap layer placed underneath a second heap layer by placing ore extracted from a mine onto a leach pad, the heap lift being irrigated using a solvent formulated to leach a first chemical element of economic interest from the ore into a solution comprising the solvent and the first chemical element;

installing a horizontal solution collection system between the first heap layer and the second heap layer, the horizontal solution collection system comprising a horizontal tubing with a first wireline data collection tool disposed therein;

providing a heap leach model for modeling the heap leach operation, the heap leach operation comprising a solvent formulation and a irrigation setting;

obtaining collected data from the first wireline data collection tool while irrigating the heap lift, the collected data comprising in-situ material parameters of the first heap layer and the second heap layer and in-situ solution parameters of a solution flowing in the first heap layer and the second heap layer;

modeling the heap leach operation using the collected data based on the heap leach model to generate a result;

adjusting the heap leach operation based on the result;

drilling a borehole through at least the first heap layer and the second heap layer; and

completing the borehole with a second wireline data collection tool disposed therein, wherein the collected data is further obtained from the second wireline data collection tool while irrigating the heap lift.

2. The method of claim 1 , wherein modeling the heap leach operation comprises:

iteratively generating simulated values of material parameters of the first heap layer and the second heap layer and solution parameters of the solution flowing in the first heap layer and the second heap layer;

iteratively comparing the simulated values and the collected data to determine a difference therebetween; and

adjusting a parameter of the heap leach model to minimize the difference.

3. The method of claim 2 , wherein the difference relates to concentrations of at least one selected from a group consisting of the first chemical element of economic interest for the heap leach operation, a second chemical element that participates in a chemical reaction between the solvent and the first chemical element, a third chemical element that participates in infiltration of the solution, and a fourth chemical element that does not participate in the chemical reaction and the infiltration, and

wherein the second chemical element, the third chemical element, and the fourth chemical element are of no economic interest to the heap leach operation.

4. The method of claim 1 , further comprising:

extending the heap leach model in response to placing a third heap layer above the second heap layer to expand the heap lift.

5. The method of claim 1 , further comprising:

extending the borehole subsequent to placing a third heap layer above the second heap layer to expand the heap lift.

6. The method of claim 1 , wherein the heap leach model comprises at least one selected from a group consisting of a block sub-model for modeling a mining operation of the ore, a geologic sub-model for modeling a static ore body of the heap lift, a depositional sub-model for modeling the forming of the heap lift, a flow/reactive transport sub-model for modeling an interaction between the solvent and the static ore body, and a full scale operational sub-model for modeling coupling between the block sub-model, the geologic sub-model, the depositional sub-model, and the flow/reactive transport sub-model.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 30, 2017
From: SCHLUMBERGER TECHNOLOGY CORPORATION
To: WSP GLOBAL, INC.
Reel/Frame 043451/0687 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 1, 2012
From: LANG, KENT; MATHIEU, GILLES; BANAS, ROLAND; WILL, ROBERT A.
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 028700/0003 →
Continuity (2)
Provisional Application 61265756 · Dec 2, 2009
Related Publication 20120297928A1 · Nov 29, 2012