Determining a connectivity model in smart grids

Inventors: Vijay Arya (Bangalore, IN); Shivkumar Kalyanaraman (Bangalore, IN); Devasenapathi Periagraharam Seetharamakrishnan (Bangalore, IN); Jayram S. Thathachar (Bangalore, IN)
Assignee: International Business Machines Corporation
G01D4/00G01D4/002H04L43/0811H04L45/02Y02B90/246Y04S20/42Y04S20/48
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,285,242
App. No.
13/563,373
Granted
Mar 15, 2016
Kind
B2
Abstract

Methods and arrangements for determining a network connectivity model. Meters are interfaced with, and periodic synchronous power-related measurements are collected from different meters. Measurement messages are sent to a predetermined location for being consolidated and processed, and a network connectivity model is thereupon determined.

Claims (54)

1. A method comprising:

utilizing at least one processor to execute computer code configured to perform the steps of:

interfacing with meters in an electric power grid, subsequent to repairs, maintenance or rebalancing efforts relative to the electric power grid;

obtaining power-related measurements from the meters;

said obtaining comprising receiving the power-related measurements at at least one remote device;

consolidating and processing the power-related measurements to determine an updated network connectivity model subsequent to the repairs, maintenance or rebalancing efforts;

wherein said determining comprises:

analyzing a time series of measurements, over time steps, from at least some of the meters; and

finding a sparsest set of the meters whose measurements approximately add up to the measurements of a given meter to determine connectivity among the meters; and

storing the updated network connectivity model at a data storage location.

2. The method according to claim 1 , wherein said obtaining comprises collecting measurements of at least one member selected from the group consisting of: voltage; current; and elapsed kilowatt hours.

3. The method according to claim 1 , wherein said obtaining comprises interfacing with at least two members selected from the group consisting of: at least one smart meter; at least one feeder meter; and at least one transformer meter.

4. The method according to claim 1 , wherein said consolidating and processing comprises determining a tree connectivity model.

5. The method according to claim 1 , wherein said determining comprises finding a largest set of the meters whose measurements approximately add up to the measurements of a given meter to divine an upstream-downstream connection between the given meter and the largest set of the meters.

6. The method according to claim 1 , wherein said determining comprises using base vectors in a null space of a matrix of measurements from at least some of the meters to determine connectivity among the meters.

7. The method according to claim 1 , wherein said collecting comprises collecting information including at least one member selected from the group consisting of: meter type; voltage; current; power factor; active power; and reactive power.

8. An apparatus comprising:

at least one processor; and

a non-transitory computer readable storage medium having computer readable program code embodied therewith and executable by the at least one processor, the computer readable program code comprising:

computer readable program code configured to interface with meters in an electric power grid, subsequent to repairs, maintenance or rebalancing efforts relative to the electric power grid;

computer readable program code configured to obtain power-related measurements from the meters;

computer readable program code configured to receive the power-related measurements at at least one remote device;

computer readable program code configured to consolidate and process the power-related measurements to determine an updated network connectivity model subsequent to the repairs, maintenance or rebalancing efforts;

wherein the determining comprises:

analyzing a time series of measurements, over time steps, from at least some of the meters; and

finding a sparsest set of the meters whose measurements approximately add up to the measurements of a given meter to determine connectivity among the meters; and

computer readable program code configured to store the updated network connectivity model at a data storage location.

9. A computer program product comprising:

a non-transitory computer readable storage medium having computer readable program code embodied therewith, the computer readable program code comprising:

computer readable program code configured to interface with meters in an electric power grid, subsequent to repairs, maintenance or rebalancing efforts relative to the electric power grid;

computer readable program code configured to obtain power-related measurements from the meters;

computer readable program code configured to receive the power-related measurements at at least one remote device;

computer readable program code configured to consolidate and process the power-related measurements to determine an updated network connectivity model subsequent to the repairs, maintenance or rebalancing efforts;

wherein the determining comprises:

analyzing a time series of measurements, over time steps, from at least some of the meters; and

finding a sparsest set of the meters whose measurements approximately add up to the measurements of a given meter to determine connectivity among the meters; and

computer readable program code configured to store the updated network connectivity model at a data storage location.

10. The computer program product according to claim 9 , wherein said computer readable program code is configured to collect measurements of at least one member selected from the group consisting of: voltage; current; and elapsed kilowatt hours.

11. The computer program product according to claim 9 , wherein said computer readable program code is configured to interface with at least two members selected from the group consisting of: at least one smart meter; at least one feeder meter; and at least one transformer meter.

12. The computer program product according to claim 9 , wherein said computer readable program code is configured to determine a tree connectivity model of the meters.

13. The computer program product according to claim 9 , wherein said computer readable program code is configured to find a largest set of the meters whose measurements approximately add up to the measurements of a given meter to divine an upstream-downstream connection between the given meter and the largest set of the meters.

14. The computer program product according to claim 9 , wherein said computer readable program code is configured to use base vectors in a null space of a matrix of measurements from at least some of the meters to determine connectivity among the meters.

15. The computer program product according to claim 9 , wherein said computer readable program code is configured to collect information including at least one member selected from the group consisting of: meter type; voltage; current; power factor; active power; and reactive power.

16. A method comprising:

utilizing at least one processor to execute computer code configured to perform the steps of:

interfacing with smart meters in a power network, and with at least one meter upstream from at least one smart meter in the power network, subsequent to repairs, maintenance or rebalancing efforts relative to the power network;

receiving measurements from the smart meters;

receiving measurements from the at least one meter upstream from at least one smart meter;

consolidating measurement data from the smart meters and the at least one upstream meter;

said consolidating comprising:

analyzing a time series of measurements, over time steps, from at least some of the meters from: the smart meters and the at least one upstream meter; and

finding a sparsest set of the meters whose measurements approximately add up to the measurements of a given meter to determine connectivity among the meters;

mapping connections between the smart meters and the at least one upstream meter based on the consolidated measurement data, to determine an updated network connectivity model subsequent to the repairs, maintenance or rebalancing efforts; and

storing the updated network connectivity model at a data storage location.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 6, 2017
From: INTERNATIONAL BUSINESS MACHINES CORPORATION
To: UTOPUS INSIGHTS, INC.
Reel/Frame 042700/0530 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 24, 2012
From: ARYA, VIJAY; KALYANARAMAN, SHIVKUMAR; SEETHARAMAKRISHNAN, DEVASENAPATHI PERIAGRAHARAM; THATACHAR, JAYRAM S.
To: INTERNATONAL BUSINESS MACHINES CORPORATION
Reel/Frame 028843/0507 →
Continuity (1)
Related Publication 20140039818A1 · Feb 6, 2014