IP Library Granted Patent US 8,619,617
Granted Patent B2
US 8,619,617 · App. 13/578,234 · Granted Dec 31, 2013

Data transmission method, system and device in multi-carrier system

Inventors: Yali Zhao (Beijing, CN); Guoqing Li (Beijing, CN); Fangli Xu (Beijing, CN)
Assignee: China Academy of Telecommunications Technology
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,619,617
App. No.
13/578,234
Granted
Dec 31, 2013
Kind
B2
Abstract

A data transmission method, system and device in multi-carrier system, which relate to wireless communication field, are provided for solving the problem, that is, when the scheduling methods for same time unit in the network side of multi-carrier system include Semi-Persistent Scheduling (SPS) and dynamic scheduling at the same time, how the terminal transmits data in said time unit. Before transmitting the uplink data by using the time unit, the terminal determines that the network side schedules the terminal to implement SPS uplink transmission and dynamic scheduling uplink transmission in the time unit by using the uplink component carrier and the number of uplink component carriers which can be used to implement uplink transmission by the terminal is more than one; the terminal selects parts or all of multiple available uplink component carriers, and implements SPS uplink transmission and/or dynamic scheduling uplink transmission in the time unit by using the selected uplink component carriers.

Claims (29)

1. A data transmission method in a multi-carrier system, comprising:

before transmission of uplink data in a time unit, determining, by a user equipment, that the user equipment is scheduled from the network side to perform Semi-Persistent Scheduling, SPS, uplink transmission in the time unit over an uplink component carrier and also determining that the user equipment is scheduled from the network side to perform dynamic scheduling uplink transmission in the time unit over an uplink component carrier, wherein there are a plurality of uplink component carriers available to the user equipment performing uplink transmission; and

selecting, by the user equipment, all or a part of uplink component carriers among the plurality of available uplink component carriers and performing SPS uplink transmission and/or dynamic scheduling uplink transmission in the time unit over the respective selected uplink component carriers, wherein performing SPS uplink transmission and/or dynamic scheduling uplink transmission in the time unit over the respective selected uplink component carriers comprises:

if the user equipment has both dynamic scheduling uplink transmission and SPS uplink transmission in the time unit over a selected uplink component carrier, the user equipment performing only dynamic scheduling uplink transmission in the time unit over the selected uplink component carrier;

if the user equipment has only dynamic scheduling uplink transmission in the time unit over a selected uplink component carrier, the user equipment performing only dynamic scheduling uplink transmission in the time unit over the selected uplink component carrier; and

if the user equipment has only SPS uplink transmission in the time unit over a selected uplink component carrier, the user equipment performing only SPS uplink transmission in the time unit over the selected uplink component carrier.

2. The method according to claim 1 , wherein the uplink component carrier used for the SPS uplink transmission scheduled from the network side to be performed by the user equipment and the uplink component carrier used for the dynamic scheduling uplink transmission scheduled from the network side to be performed by the user equipment are the same uplink component carrier or different uplink component carriers.

3. The method according to claim 2 , wherein selecting by the user equipment uplink component carriers comprises:

selecting, by the user equipment, from the plurality of available uplink component carriers those uplink component carriers over which the user equipment is scheduled from the network side to perform dynamic scheduling uplink transmission and/or SPS uplink transmission in the time unit.

4. The method according to claim 2 , wherein the time unit is a sub-frame.

5. The method according to claim 1 , wherein determining that the user equipment is scheduled from the network side to perform SPS uplink transmission comprises:

determining, by the user equipment, that the user equipment is scheduled from the network side to perform SPS uplink transmission in the time unit over an uplink component carrier when the user equipment is configured with an SPS uplink transmission resource including the time unit from the network side; and

determining that the user equipment is scheduled from the network side to perform dynamic scheduling uplink transmission comprises:

determining, by the user equipment, that the user equipment is scheduled from the network side to perform dynamic scheduling uplink transmission in the time unit over an uplink component carrier upon reception of dynamic scheduling signaling transmitted from the network side to instruct the user equipment to perform uplink transmission in the time unit over the uplink component carrier.

6. The method according to claim 5 , wherein selecting by the user equipment uplink component carriers comprises:

selecting, by the user equipment, from the plurality of available uplink component carriers those uplink component carriers over which the user equipment is scheduled from the network side to perform dynamic scheduling uplink transmission and/or SPS uplink transmission in the time unit.

7. The method according to claim 5 , wherein the time unit is a sub-frame.

8. The method according to claim 1 , wherein selecting by the user equipment uplink component carriers comprises:

selecting, by the user equipment, from the plurality of available uplink component carriers those uplink component carriers over which the user equipment is scheduled from the network side to perform dynamic scheduling uplink transmission and/or SPS uplink transmission in the time unit.

9. The method according to claim 1 , wherein the time unit is a sub-frame.

10. A user equipment, comprising:

a determining unit configured, before transmission of uplink data in a time unit, to determine that the user equipment is scheduled from the network side to perform Semi-Persistent Scheduling, SPS, uplink transmission in the time unit over an uplink component carrier and also determine that the user equipment is scheduled from the network side to perform dynamic scheduling uplink transmission in the time unit over an uplink component carrier, wherein there are a plurality of uplink component carriers available to the user equipment performing uplink transmission; and

a transmitting unit configured to select all or a part of uplink component carriers among the plurality of available uplink component carriers and perform SPS uplink transmission and/or dynamic scheduling uplink transmission in the time unit over the respective selected uplink component carriers, wherein the transmitting unit is further configured:

if the user equipment has both dynamic scheduling uplink transmission and SPS uplink transmission in the time unit over a selected uplink component carrier, to perform only dynamic scheduling uplink transmission in the time unit over the selected uplink component carrier;

if the user equipment has only dynamic scheduling uplink transmission in the time unit over a selected uplink component carrier, to perform only dynamic scheduling uplink transmission in the time unit over the selected uplink component carrier; and

if the user equipment has only SPS uplink transmission in the time unit over a selected uplink component carrier, to perform only SPS uplink transmission in the time unit over the selected uplink component carrier.

11. The user equipment according to claim 10 , wherein the determining unit is configured to determine that the user equipment is scheduled from the network side to perform SPS uplink transmission in the time unit over an uplink component carrier when the user equipment is configured with an SPS uplink transmission resource including the time unit from the network side; and to determine that the user equipment is scheduled from the network side to perform dynamic scheduling uplink transmission in the time unit over an uplink component carrier upon reception of dynamic scheduling signaling transmitted from the network side to instruct the user equipment to perform uplink transmission in the time unit over the uplink component carrier.

12. The user equipment according to claim 11 , wherein the transmitting unit is configured to select from the plurality of available uplink component carriers those uplink component carriers over which the user equipment is scheduled from the network side to perform dynamic scheduling uplink transmission and/or SPS uplink transmission in the time unit.

13. The user equipment according to claim 10 , wherein the transmitting unit is configured to select from the plurality of available uplink component carriers those uplink component carriers over which the user equipment is scheduled from the network side to perform dynamic scheduling uplink transmission and/or SPS uplink transmission in the time unit.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 16, 2021
From: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY
To: DATANG MOBILE COMMUNICATIONS EQUIPMENT CO.,LTD.
Reel/Frame 057452/0169 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 10, 2012
From: ZHAO, YALI; LI, GUOQING; XU, FANGLI
To: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY
Reel/Frame 028767/0670 →
Priority Claims (1)
CN 2010 1 0111878 · Feb 11, 2010 · national
Continuity (1)
Related Publication 20120327877A1 · Dec 27, 2012