Method of laying a hybrid pipeline on the seabed

Inventors: Jessica da Silva Machado (Rio de Janeiro, BR); Peter Tanscheit (Rio de Janerio, BR); Frederico Nicoletti De Fraga (Rio de Janeiro, BR); Paulo Marcio Moreira Castro (Rio de Janerio, BR)
Assignee: Subsea 7 Limited
F16L1/26F16L1/16F16L1/166
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,121,529
App. No.
13/578,559
Granted
Sep 1, 2015
Kind
B2
Abstract

A rigid-to-flexible connector (RFC) is provided on the rigid pipe section instead of a pipeline end termination (PLET), and the pipe end having the RFC is raised to the surface of the sea, while leaving a portion of the rigid pipe section on the seabed. The RFC is then connected to one end of the flexible pipe section, and the latter lowered to the seabed, with the raised, end of the rigid pipe section attached, to return the rigid pipe section to the seabed. Since the RFC on the rigid pipe section is connected to the flexible pipe section at the surface of the sea, the RFC can have a simpler, lighter, technical design, resulting in significant cost, manufacturing time and quality control time savings.

Claims (24)

1. A method of laying a hybrid pipeline comprising a rigid pipe section that lies on the seabed and a flexible jumper which is connected to the rigid pipe section, comprising the steps of:

(i) lowering a rigid pipe section onto the seabed,

(ii) raising one end of the rigid pipe section on the seabed to the surface of the sea, while leaving a portion of the rigid pipe section on the seabed,

(iii) connecting one end of a flexible jumper to the raised end of the rigid pipe section so that the flexible jumper and the rigid pipe section are in fluid communication, and

(iv) lowering the one end of the flexible jumper to the seabed with the raised one end of the rigid pipe section attached, to return the raised one end of the rigid pipe section to the seabed and to lay the flexible jumper on the seabed,

wherein a connection between the raised one end of the rigid pipe section and the flexible jumper receives auxiliary support from an abandonment and recovery winch and winch line on a flexible lay vessel used for deployment of the flexible jumper, when the one end of the or each flexible jumper is lowered to the seabed with the respective raised one end of the rigid pipe section attached, to return the raised one end of the rigid pipe section to the seabed and thereby maintaining a sufficient bending radius in the flexible jumper greater than a minimum bend radius of the flexible jumper.

2. The method according to claim 1 , wherein the other end of the flexible jumper is connected to a manifold or Christmas tree at a wellhead of a subsea well, after the flexible jumper has been laid on the seabed.

3. The method according to claim 1 , wherein a connection between the rigid pipe section and the flexible jumper is made by a pipe connector comprising a main body having a welded connection to the rigid pipe section and an end flange for connection to a flexible jumper.

4. The method according to claim 3 , wherein the pipe connector is located on the seabed in steps (i) and (iv) without one or more of a mudmat and an anchor guard.

5. The method according to claim 3 , wherein the welded connection is made at the sea surface during step (i), when most of the rigid pipe section has been lowered down to the seabed, prior to lowering a remaining end section of the rigid pipe section onto the sea bed.

6. The method as claimed in claim 1 , wherein steps (ii) to (iv) are repeated to connect a second flexible jumper to a second end of the rigid pipe section so that the second flexible jumper and the rigid pipe section are in fluid communication.

7. The method according to claim 1 , wherein the rigid pipe section is provided with a pigging unit before lowering on to the seabed in step (i), and wherein the pigging unit is removed in connecting the flexible jumper to the rigid pipe section.

8. The method according to claim 1 , wherein step (i) is performed by the rigid lay vessel, and wherein steps (ii), (iii) and (iv) are performed by a flexible lay vessel.

9. The method according to claim 8 , wherein a hang off clamp is provided on the flexible lay vessel to support the raised one end of the rigid pipe section for connection to the flexible jumper.

10. The method according to claim 9 , wherein the hang off clamp is fixed to an overboarding sheave of the flexible lay vessel, and the overboarding sheave is prevented from rotating freely during the connecting of the flexible jumper to the rigid pipe section in step (iii).

11. The method according to claim 9 , wherein for step (iii), the flexible jumper is supported by a roller box to control an angle of connection of the flexible jumper to the rigid pipe section.

12. The method according to claim 11 , wherein for step (iv), a height of the roller box is adjusted to enable support of the flexible jumper at a chosen lay angle.

13. The method according to claim 2 , wherein a connection between the rigid pipe section and a flexible jumper is made by a pipe connector comprising a main body having a welded connection to the rigid pipe section and an end flange for connection to a flexible jumper.

14. The method according to claim 4 , wherein the welded connection is made at the sea surface during step (i), when most of the rigid pipe section has been lowered down to the seabed, prior to lowering a remaining end section of the rigid pipe section onto the seabed.

15. The method as claimed in claim 5 , wherein steps (ii) to (iv) are repeated to connect a second flexible jumper to a second end of the rigid pipe section so that the second flexible jumper and the rigid pipe section are in fluid communication.

16. The method according to claim 6 , wherein the rigid pipe section is provided with a pigging unit before lowering on to the seabed in step (i), and wherein the pigging unit is removed in connecting the flexible jumper to the rigid pipe section.

17. The method according to claim 7 , wherein step (i) is performed by a rigid lay vessel, and wherein steps (ii), (iii) and (iv) are performed by a flexible lay vessel.

18. The method according to claim 1 , wherein a hang off clamp is provided on the flexible lay vessel to support the raised one end of the rigid pipe section for connection to the flexible jumper.

19. The method according to claim 10 , wherein for step (iii), the flexible jumper is supported by a roller box to control an angle of connection of the flexible jumper to the rigid pipe section.

Assignments (3)
CHANGE OF ADDRESS Recorded Apr 19, 2017
From: SUBSEA 7 LIMITED
To: SUBSEA 7 LIMITED
Reel/Frame 042285/0541 →
CHANGE OF ADDRESS Recorded Jul 21, 2015
From: SUBSEA 7 LIMITED
To: SUBSEA 7 LIMITED
Reel/Frame 036148/0808 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 19, 2013
From: MACHADO, JESSICA DA SILVA; TANSCHEIT, PETER; DE FRAGA, FREDERICO NICOLETTI; CASTRO, PAULO MARCIO
To: SUBSEA 7 LIMITED
Reel/Frame 029830/0621 →
Priority Claims (1)
GB 1002441.2 · Feb 12, 2010 · national
Continuity (1)
Related Publication 20130164084A1 · Jun 27, 2013