IP Library Granted Patent US 9,127,438
Granted Patent B2
US 9,127,438 · App. 13/579,925 · Granted Sep 8, 2015

Control system for hybrid construction machine

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,127,438
App. No.
13/579,925
Granted
Sep 8, 2015
Kind
B2
Abstract

A control system for construction machine includes a pair of first and second main pumps which are variable-displacement pumps, first and second circuit systems connected to the first and second main pumps and including a plurality of control valves, main switching valves provided between the first and second circuit systems and the first and second main pumps, a hydraulic motor for power generation connected to the first and second main pumps via the main switching valves, a generator coupled to the hydraulic motor for power generation, and a battery for storing power generated by the generator. When at least the main switching valve connected to one circuit system is at a position to cause one main pump connected thereto to communicate with the hydraulic motor for power generation, the main switching valve connected to the other circuit system causes the other main pump to communicate with the other circuit system.

Claims (12)

1. A control system for construction machine, comprising:

a pair of first and second main pumps which are variable-displacement pumps;

first and second circuit systems connected to the first and second main pumps and including a plurality of control valves;

main switching valves provided between the first and second circuit systems and the first and second main pumps;

a hydraulic motor for power generation connected to the first and second main pumps via the main switching valves;

a generator coupled to the hydraulic motor for power generation; and

a battery for storing power generated by the generator;

wherein when at least the main switching valve connected to one circuit system is at a position to cause one main pump connected thereto to communicate with the hydraulic motor for power generation, the main switching valve connected to the other circuit system causes the other main pump to communicate with the other circuit system.

2. The control system according to claim 1 , wherein:

one of the main switching valves causes one of the first and second main pumps to communicate with one of the first and second circuit systems connected thereto via a throttle passage in the one main switching valve when at a position to connect the main pump to the hydraulic motor for power generation.

3. The control system according to claim 1 , wherein:

one of the main switching valves connected to one of the first and second circuit systems opens a main passage for connecting one of the first and second main pumps to the one circuit system connected thereto and a joint passage for causing oil discharged from an assist pump to join the one main pump via a check valve when at a normal position, and opens the main passage and closes the joint passage when at a switch position.

Assignments (2)
CHANGE OF NAME Recorded Dec 21, 2015
From: KAYABA INDUSTRY CO., LTD.
To: KYB CORPORATION
Reel/Frame 037355/0086 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 17, 2012
From: KAWASAKI, HARUHIKO; EGAWA, MASAHIRO
To: KAYABA INDUSTRY CO., LTD.
Reel/Frame 028808/0828 →