IP Library Granted Patent US 8,736,103
Granted Patent B2
US 8,736,103 · App. 13/614,284 · Granted May 27, 2014

Load control module for a generator and method of operation

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,736,103
App. No.
13/614,284
Granted
May 27, 2014
Kind
B2
Abstract

A load control module is provided for use with a transfer switch apparatus that controls the delivery of standby electrical power to a load during utility power interruption. The load control module selectively brings loads online to receive standby electrical power to prevent overloading of the electric generator that is providing the standby electrical power. The frequency of the electrical power is also monitored and if a low frequency condition is detected, loads are taken offline (shed). A method to flag those loads that induce an overload condition is also provided.

Claims (11)

1. A method of transferring electrical, power to a plurality of loads from a utility power supply that normally supplies power to the plurality of loads to an electric generator that supplies standby electrical power to the plurality of loads during interruption of the utility power supply, the method comprising:

detecting an interruption of the delivery of utility power to the plurality of loads, wherein the plurality of loads includes a first priority load and a second priority load that are provided standby electrical power during interruption of the delivery of utility power;

disabling the plurality of loads, for a preset wait period, upon interruption of utility power;

after expiration of the preset wait period, enabling the first priority load without enabling the second priority load; and

observing a preset delay period after enabling of the first priority load and enabling the second priority load upon expiration of the preset delay period;

wherein the first priority load is disabled before the enabling of the second priority load.

2. The method of claim 1 wherein the first priority load is enabled for a user selected first load operating time.

3. The method of claim 2 wherein the user selected first load operating time is adjustable.

4. The method of claim 2 wherein the second priority load is enabled for a user selected second load operating time.

5. The method of claim 4 wherein the user selected second load operating time is adjustable.

6. The method of claim 4 wherein the user selected first load operating time and the user selected second load operating time are different.

Assignments (1)
SECURITY INTEREST Recorded Sep 19, 2022
From: GENERAC POWER SYSTEMS, INC.
To: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 061476/0745 →