IP Library Granted Patent US 10,195,561
Granted Patent B2
US 10,195,561 · App. 13/623,491 · Granted Feb 5, 2019

Steam supply system and CO

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,195,561
App. No.
13/623,491
Granted
Feb 5, 2019
Kind
B2
Abstract

A steam supply system that can reheat CO 2 absorbing liquid without lowering performance of a reboiler by decompressing a condensed water drum is provided. This system includes a reboiler that raises the temperature of absorbing liquid contacted with exhaust gas discharged from a boiler to absorb CO 2 in the exhaust gas and heated to eliminate CO 2 . The reboiler includes a heat exchanger tube to which steam for heating is supplied and a condensed water drum that recovers condensed water of the steam introduced from the heat exchanger tube as steam drain, and the condensed water drum is provided with decompression unit that lowers pressure in the condensed water drum.

Claims (50)

1. A steam supply system comprising:

a reboiler that raises a temperature of absorbing liquid which has contacted with exhaust gas discharged from a boiler to absorb CO 2 in the exhaust gas and which has been heated to eliminate CO 2 ,

the reboiler including:

a heat exchanger tube which supplies steam for heating to the reboiler; and

a condensed water drum that recovers condensed water of the steam introduced from the heat exchanger tube as steam drain,

wherein the condensed water drum is provided with a decompression unit that lowers pressure in the condensed water drum,

wherein the decompression unit includes a vent tube that discharges gas phase in the condensed water drum to ambient air, and a flow rate control valve which is provided in the vent tube and which controls flow rate of the gas phase in the vent tube,

the steam supply system further comprising:

a first measuring unit for measuring pressure in the heat exchanger tube at an upstream position of the reboiler;

a second measuring unit for measuring pressure in the condensed water drum; and

a controller which controls the flow rate control valve on the basis of pressure difference between a measured pressure by the first measuring unit and a measured pressure by the second measuring unit,

wherein, when the pressure difference between the pressure measured by the first measuring unit and the pressure measured by the second measuring unit falls below a predetermined value approaching pressure equalization, the flow rate control valve is configured to receive a signal from the controller and configured to change its degree of opening in response to the signal such that the pressure difference is adjusted to a desired value.

2. A steam supply system comprising:

a reboiler that raises a temperature of absorbing liquid which has contacted with exhaust gas discharged from a boiler to absorb CO 2 in the exhaust gas and which has been heated to eliminate CO 2 ,

the reboiler including:

a heat exchanger tube which supplies steam for heating to the reboiler; and

a condensed water drum that recovers condensed water of the steam introduced from the heat exchanger tube as steam drain,

wherein the condensed water drum is provided with a cooling unit which cools the condensed water in the condensed water drum in order to lower pressure in the condensed water drum,

wherein the cooling unit includes:

a drain circulation route branched from a steam drain piping that discharges the steam drain from a bottom portion of the condensed water drum, the drain circulation route being connected to the condensed water drum;

a cooler that is provided in the drain circulation route and that cools the steam drain branched to the drain circulation route side, and

a flow rate control valve which controls flow rate of the steam drain in the drain circulation route,

wherein the steam supply system further comprises:

a first measuring unit for measuring pressure in the heat exchanger tube at an upstream position of the reboiler;

a second measuring unit for measuring pressure in the condensed water drum; and

a controller which controls the flow rate control valve on the basis of pressure difference between a measured pressure by the first measuring unit and a measured pressure by the second measuring unit,

wherein the controller controls cooling medium flowing in a heat exchanger tube provided in the cooling unit,

wherein, when the pressure difference between the pressure measured by the first measuring unit and the pressure measured by the second measuring unit falls below a predetermined value approaching pressure equalization, the flow rate control valve is configured to receive a signal from the controller and configured to change its degree of opening in response to the signal such that the pressure difference is adjusted to a desired value, and

wherein the condensed water cooled by the cooling unit is returned to the condensed water drum through the drain circulation route.

3. A steam supply system comprising:

a reboiler that raises a temperature of absorbing liquid which has contacted with exhaust gas discharged from a boiler to absorb CO 2 in the exhaust gas and which has been heated to eliminate CO 2 ,

the reboiler including:

a heat exchanger tube which supplies steam for heating to the reboiler; and

a condensed water drum that recovers condensed water of the steam introduced from the heat exchanger tube as steam drain,

wherein the condensed water drum is provided with a cooling unit which cools the condensed water in the condensed water drum in order to lower pressure in the condensed water drum,

wherein the cooling unit comprises:

a cooler provided on a steam drain piping that discharges the steam drain from a bottom portion of the condensed water drum;

a steam drain circulation route branched from the downstream side of the cooler, the steam drain circulation route being connected to the condensed water drum, and

a flow rate control valve which controls flow rate of the steam drain in the drain circulation route,

wherein the steam supply system further comprises:

a first measuring unit for measuring pressure in the heat exchanger tube at an upstream position of the reboiler;

a second measuring unit for measuring pressure in the condensed water drum; and

a controller which controls the flow rate control valve on the basis of pressure difference between a measured pressure by the first measuring unit and a measured pressure by the second measuring unit,

wherein the controller controls cooling medium flowing in a heat exchanger tube provided in the cooling unit,

wherein, when the pressure difference between the pressure measured by the first measuring unit and the pressure measured by the second measuring unit falls below a predetermined value approaching pressure equalization, the flow rate control valve is configured to receive a signal from the controller and configured to change its degree of opening in response to the signal such that the pressure difference is adjusted to a desired value, and

wherein the condensed water cooled by the cooling unit is returned to the condensed water drum through the drain circulation route.

4. A CO 2 recovery unit comprising:

an absorbing tower that contacts CO 2 in exhaust gas with the absorbing liquid to absorb CO 2 , and

a regeneration tower that discharges CO 2 absorbed in the absorbing tower from the absorbing liquid,

wherein the regeneration tower includes a reboiler having the steam supply system according to any of claim 1 or 2 .

Assignments (4)
CHANGE OF NAME Recorded Dec 14, 2023
From: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
To: MHI ENGINEERING, LTD.
Reel/Frame 066014/0774 →
NUNC PRO TUNC ASSIGNMENT Recorded Dec 14, 2023
From: MHI ENGINEERING, LTD.
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 066014/0870 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 18, 2018
From: MITSUBISHI HEAVY INDUSTRIES, LTD.
To: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
Reel/Frame 046581/0430 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 11, 2013
From: NAKAYAMA, KOJI; YONEKAWA, TAKAHITO; INUI, MASAYUKI; TSUJIUCHI, TATSUYA; MIYAMOTO, OSAMU; SORIMACHI, YOSHIKI
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 029963/0868 →