IP Library Granted Patent US 9,249,843
Granted Patent B2
US 9,249,843 · App. 13/625,302 · Granted Feb 2, 2016

Pressure holding transmission clutch with ball check valve

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,249,843
App. No.
13/625,302
Granted
Feb 2, 2016
Kind
B2
Abstract

A check valve assembly for a clutch, including: an annular-shaped ring element including a first portion with: a first channel wholly enclosed by the first portion; a first through-bore between a radially inner surface of the first portion and the first channel; and a second through-bore between a radially outer surface of the first portion and the first channel. The assembly includes a first pressure regulating assembly at least partially disposed within the first channel and including: a spool axially displaceable within the first channel and including a space enclosed by the spool; a first ball disposed within the space and the first channel; and a first spring engaged with the spool. The spool is arranged to axially displace in response to hydraulic pressure at the first through-bore and axial force applied by the first spring to displace the first ball to block or unblock flow between the first and second through-bores.

Claims (85)

1. A check valve assembly for a clutch, comprising:

an annular-shaped ring element including a first portion with:

a first channel, an entirety of which is located in the first portion;

a first through-bore between a radially inner surface of the first portion and the first channel; and,

a second through-bore between a radially outer surface of the first portion and the first channel; and,

a first pressure regulating assembly at least partially disposed within the first channel and including:

a spool axially displaceable within the first channel;

a first ball:

disposed within the first channel; and,

including a portion disposed within the spool and displaceable within the spool; and,

a first spring engaged with the spool, wherein:

the spool is arranged to axially displace in response to hydraulic pressure at the first through-bore and axial force applied by the first spring to displace the first ball to block or unblock flow between the first and second through-bores.

2. The check valve assembly of claim 1 , wherein respective entireties of the first and second through-bores are located in the first portion.

3. The check valve assembly of claim 1 , further comprising an outer housing including a radially inward portion with a third through-bore aligned with the first through-bore, wherein the spool is arranged to axially displace in response to hydraulic pressure at the third through-bore and the axial force applied by the spring to displace the first ball to block or unblock the third through-bore.

4. The check valve assembly of claim 1 , wherein:

the first portion includes:

a second channel, an entirety of which is located in the first portion; and,

a third through-bore between the radially inner surface of the first portion and the second channel, the check valve assembly further comprising a second pressure regulating assembly at least partially disposed within the second channel and including:

second and third springs; and,

a second ball engaged with the second and third springs and disposed within the second channel, wherein the second ball is arranged to axially displace in response to hydraulic pressure at the third through-bore and respective axial forces applied by the second and third springs to block or unblock a portion of the second channel.

5. The check valve assembly of claim 4 , wherein an entirety of the third through-bore is located in the first portion.

6. The check valve assembly of claim 4 , further comprising an outer housing including a radially inward portion with a fourth through-bore aligned with the third through-bore, wherein the second ball is arranged to axially displace in response to hydraulic pressure at the fourth through-bore and the respective axial forces applied by the second and third springs to block or unblock the portion of the second channel.

7. The check valve assembly of claim 4 , wherein:

the second channel includes an opening at an axial end of the first portion of the annular-shaped ring element;

in a first phase of an idle stop mode:

the first ball is positioned to enable flow between the first and second through-bores; and,

the second ball is positioned to block flow from the third through-bore through the second channel to the opening; and,

in a second phase of the idle stop mode:

the spool is arranged to displace the first ball to block flow between the first and second through-bores; and,

the second ball is arranged to displace to enable flow from the fourth through-bore through the second channel to the opening.

8. A check valve assembly for a clutch, comprising:

an annular-shaped ring element including a first portion with:

first and second channels;

first and second through-bores between a radially inner surface of the first portion and the first and second channels, respectively;

a first pressure regulating assembly at least partially disposed within the first channel and including:

a spool axially displaceable within the first channel and including a space enclosed by the spool;

a first ball disposed within the space and the first channel; and,

a first spring engaged with the spool; and,

a second pressure regulating assembly at least partially disposed within the second channel and including:

second and third springs; and,

a second ball engaged with the second and third springs and disposed within the second channel, wherein:

respective entireties of the first and second channels are located in the first portion;

the spool is arranged to axially displace in response to hydraulic pressure at the first through-bore and axial force applied by the first spring to displace the first ball to block or unblock flow between the first and second through-bores; and,

the second ball is arranged to axially displace in response to hydraulic pressure at the second through-bore and respective axial forces applied by the second and third springs to block or unblock a portion of the second channel.

9. A clutch for a transmission, comprising:

an outer housing including a first through-bore;

a clutch pack engaged with the outer housing and including at least one clutch plate;

a first piston plate;

a second piston plate;

a snap spring;

a first spring;

an annular-shaped ring element including a first portion with:

a first channel, an entirety of which is located in the first portion; and,

a second through-bore between a radially inner surface of the first portion and the first channel and aligned with the first through-bore; and,

a first pressure regulating assembly at least partially disposed within the first channel and including:

a spool axially displaceable within the first channel;

a first ball:

disposed within the first channel; and,

including a portion disposed within the spool, wherein:

the first spring is engaged with the spool; and,

the spool is arranged to axially displace in response to hydraulic pressure at the first through-bore and axial force applied by the spring to displace the first ball to block or unblock flow through the second through-bore.

10. The clutch of claim 9 , wherein the annular-shaped ring element includes a third through-bore between the first channel and a radially outer surface of the first portion.

11. The clutch of claim 10 , wherein respective entireties of the second and third through-bores are located in the first portion.

12. The clutch of claim 9 , wherein

the outer housing includes a third through-bore;

the first portion of the annular-shaped ring element includes:

a second channel, an entirety of which is located in the first portion of the annular-shaped ring element; and,

a fourth through-bore between the radially inner segment of the first portion and the second channel and aligned with the third through-bore,

the check valve assembly further comprising a second pressure regulating assembly at least partially disposed within the second channel and including:

second and third springs; and,

a second ball engaged with the second and third springs and disposed within the second channel, wherein the second ball is arranged to axially displace in response to hydraulic pressure at the third through-bore and respective axial forces applied by the second and third springs to block or unblock a portion of the second channel.

13. The clutch of claim 12 , wherein an entirety of the fourth through-bore is located in the first portion.

14. The clutch of claim 12 , further comprising an inner housing with:

a first segment located radially inward of the annular-shaped ring element; and,

a port open to the first and third through-bores, wherein:

the spool is arranged to axially displace in response to hydraulic pressure at the port and the axial force applied by the spring to displace the first ball to block or unblock flow between the first and second through-bores; and,

the second ball is arranged to axially displace in response to hydraulic pressure at the port and the respective axial force applied by the second and third springs to block or unblock the portion of the second channel.

15. The clutch of claim 12 , wherein:

the second channel includes an opening through an axial end of the first segment of the annular-shaped ring element;

in a first phase of an idle stop mode:

the first ball is positioned to enable flow through the second through-bore; and,

the second ball is positioned to block flow from the fourth through-bore through the second channel to the opening; and,

in a second phase of the idle stop mode:

the spool is arranged to displace the first ball to block flow between the first and second through-bores; and,

the second ball is arranged to displace to enable flow from the fourth through-bore through the second channel to the opening.

Assignments (7)
CORRECTIVE ASSIGNMENT TO CORRECT THE PROPERTY NUMBERS PREVIOUSLY RECORDED ON REEL 037732 FRAME 0347. ASSIGNOR(S) HEREBY CONFIRMS THE APP. NO. 14/553248 SHOULD BE APP. NO. 14/553258. Recorded Oct 11, 2016
From: SCHAEFFLER TECHNOLOGIES GMBH & CO. KG
To: SCHAEFFLER TECHNOLOGIES AG & CO. KG
Reel/Frame 040404/0530 →
MERGER AND CHANGE OF NAME Recorded Feb 5, 2016
From: SCHAEFFLER TECHNOLOGIES AG & CO. KG; SCHAEFFLER VERWALTUNGS 5 GMBH
To: SCHAEFFLER TECHNOLOGIES GMBH & CO. KG
Reel/Frame 037732/0228 →
CHANGE OF NAME Recorded Feb 5, 2016
From: SCHAEFFLER TECHNOLOGIES GMBH & CO. KG
To: SCHAEFFLER TECHNOLOGIES AG & CO. KG
Reel/Frame 037732/0347 →
MERGER Recorded Sep 23, 2015
From: SCHAEFFLER TECHNOLOGIES AG & CO. KG
To: SCHAEFFLER VERWALTUNGSHOLDING FÜNF GMBH & CO. KG
Reel/Frame 036664/0639 →
CHANGE OF NAME Recorded Sep 23, 2015
From: SCHAEFFLER VERWALTUNGSHOLDING FÜNF GMBH & CO. KG
To: SCHAEFFLER TECHNOLOGIES GMBH & CO. KG
Reel/Frame 036664/0658 →
CHANGE OF NAME Recorded Sep 23, 2015
From: SCHAEFFLER TECHNOLOGIES GMBH & CO. KG
To: SCHAEFFLER TECHNOLOGIES AG & CO. KG
Reel/Frame 036664/0713 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 24, 2012
From: ARI, VURAL
To: SCHAEFFLER TECHNOLOGIES AG & CO. KG
Reel/Frame 029013/0295 →