IP Library Granted Patent US 9,109,580
Granted Patent B2
US 9,109,580 · App. 13/628,325 · Granted Aug 18, 2015

Arrangement for fixing a component inside of a wind turbine

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,109,580
App. No.
13/628,325
Granted
Aug 18, 2015
Kind
B2
Abstract

An arrangement for fixing a component inside of a wind turbine is disclosed. The arrangement has a portion of a tower and a direct fastener. The direct fastener has a first part and a second part and the portion of the tower is a portion of a wind turbine tower. The first part of the direct fastener is driven into the portion of the tower and is connected thereto by a combination of friction hold and bonding. The second part of the direct fastener protrudes from the portion of the tower and connects to a component.

Claims (33)

1. An arrangement for fixing a component inside of a wind turbine, comprising:

a portion of a tower; and

a direct fastener,

wherein the direct fastener comprises a first part and a second part,

wherein the portion of the tower is a portion of a wind turbine tower,

wherein the first part of the direct fastener is driven into the portion of the tower and is connected thereto by a combination of friction hold and bonding,

wherein the second part of the direct fastener protrudes from the portion of the tower and connects to the component,

wherein the first part of the direct fastener is not threaded, and wherein the second part of the fastener comprises an external thread, and

wherein at least one of a dampening element and a spacing element is arranged between the portion of the tower and the component.

2. The arrangement according to claim 1 , wherein the component is a ladder, a guiding rail, a rope of an elevator, or a cable tray.

3. The arrangement according to claim 1 , wherein the first part of the direct fastener comprises a cylindrical end.

4. The arrangement according to claim 1 , wherein the first part of the direct fastener is surface-treated in order to increase the friction hold.

5. The arrangement according to claim 1 , wherein the first part of the direct fastener comprises a structured surface in order to create a keying hold.

6. The arrangement according to claim 1 , wherein the first part of the direct fastener is zinc-coated and held in the portion of the tower by a soldering hold.

7. The arrangement according to claim 1 , wherein the first part of the direct fastener is at least partly held in the portion of the tower.

8. The arrangement according to claim 1 , wherein the portion of the tower is made of metal, and wherein the first part of the direct fastener is held in the portion of the tower by a welding hold.

9. The arrangement according to claim 8 , wherein the portion of the tower is made of steel.

10. The arrangement according to claim 1 , further comprising:

at least one further direct fastener,

wherein the further direct fastener comprises a first part and a second part,

wherein the first part of the at least one further direct fastener is driven into the portion of the tower and connected thereto by a combination of friction hold and bonding,

wherein the second part of the at least one further direct fastener protrudes the portion of the tower and is connectable to the component, and

wherein the component is connected to the direct fastener and to the at least one further direct fastener.

11. The arrangement according to claim 10 , wherein the portion of the tower comprises at least two sections, and wherein the direct fastener and the further direct fastener are driven into different sections of the at least two sections.

12. A method for constructing an arrangement, comprising:

implementing the arrangement according to claim 1 ;

determining a position on the portion of the tower; and

driving the direct fastener into the determined position on the portion of the tower by a tool.

13. The method according to claim 12 , wherein the tool is a powder actuated tool or a gas actuated tool.

14. The method according to claim 12 , further comprising:

drilling a non through-going hole in the portion of the tower before driving the direct fastener into the determined position on the portion of the tower,

wherein driving the direct fastener into the determined position on the portion of the tower comprises driving the direct fastener into the non through-going hole.

15. The method according to claim 12 , further comprising attaching the component to the second part of the direct fastener.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2019
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS GAMESA RENEWABLE ENERGY A/S
Reel/Frame 048003/0631 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2013
From: MARKGRAF, ADRIAN
To: TRANSFER-CENTRUM GMBH & CO. KG
Reel/Frame 029560/0346 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2013
From: OLESEN, JOERN
To: SIEMENS WIND POWER A/S
Reel/Frame 029560/0385 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2013
From: SIEMENS WIND POWER A/S
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 029560/0466 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2013
From: TRANSFER-CENTRUM GMBH & CO. KG
To: SIEMENS WIND POWER A/S
Reel/Frame 029560/0519 →