IP Library Granted Patent US 8,858,121
Granted Patent B2
US 8,858,121 · App. 13/635,202 · Granted Oct 14, 2014

Strapping machine

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,858,121
App. No.
13/635,202
Granted
Oct 14, 2014
Kind
B2
Abstract

An arrangement on board a vessel to be able to strap at least one cable to a pipeline during continuous and contemporary deployment of the strapped pipe bundle into the sea is shown. The arrangement includes at least a strapping machine which is arranged to be moved forward together with the cable and pipeline in order to perform a strapping operation in concert with the forward advancement thereof. The strapping machine is also moveable rearwards relative to the cable and pipeline for the repositioning to the next strapping operation such that the application of a strap or straps takes place intermittently under the continuous deployment of the pipe bundle. Means for continuous motorized advancement of the respective pipes and cables towards the strapping machine and further into the sea is also arranged.

Claims (29)

1. An arrangement on board a vessel to be able to strap at least one cable to a pipeline during continuous and contemporary laying of a strapped pipe bundle into a sea, the arrangement comprising:

at least one strapping machine arranged to be movable forward together with the at least one cable and the pipeline in order to perform a strapping operation in concert with a forward advancement of the at least one cable and the pipeline, and moveable rearwards relative to the at least one cable and the pipeline for repositioning to a next strapping operation such that the application of a strap or straps takes place intermittently under the continuous laying of the strapped pipe bundle;

a continuous motorized advancement device configured to feed a cable bundle including the at least one cable and the pipeline towards the at least one strapping machine and further into the sea; and

an S-forming device configured to shape the at least one cable that rests against the pipeline into an S-form.

2. The arrangement according to claim 1 , wherein the S-forming device includes rollers, and a working cylinder acting on the rollers engaging the cable, said working cylinder being activated back and forth in amplitude excursions in order to S-form the cable in gentle sinus form.

3. The arrangement according to claim 2 , wherein the S-forming device is stationary relative to the vessel and the advancing cable bundle.

4. The arrangement according to claim 2 , further comprising guide rails, wherein the strapping machine is arranged on a chassis which in turn is attached to the vessel, and is moveable back and forth along the guide rails relative to the chassis.

5. The arrangement according to claim 2 , wherein the arrangement is configured to strap a pipe bundle including at least one cable to a pipeline during continuous and contemporary laying of a strapped pipe bundle into a sea, and wherein each strapping machine includes a strap tensioning device and an associated endless strap track configured to extend circumferentially around the at least one cable and the pipeline and at a distance apart therefrom, which strap track is able to guide the strap in orbit around the pipe bundle before the strap tensioning operation is performed.

6. The arrangement according to claim 2 , wherein the arrangement is configured to strap a pipe bundle including at least one cable to a pipeline during continuous and contemporary laying of a strapped pipe bundle into a sea, and wherein the continuous motorized advancement device comprises a number of caterpillar tracks configured to act directly against surfaces of the at least one cable and the pipeline.

7. The arrangement according to claim 1 , wherein the S-forming device is stationary relative to the vessel.

8. The arrangement according to claim 7 , further comprising guide rails, wherein the strapping machine is arranged on a chassis which in turn is attached to the vessel, and is moveable back and forth along the guide rails relative to the chassis.

9. The arrangement according to claim 7 , wherein the arrangement is configured to strap a pipe bundle including at least one cable to a pipeline during continuous and contemporary laying of a strapped pipe bundle into a sea, and wherein each strapping machine includes a strap tensioning device and an associated endless strap track configured to extend circumferentially around the at least one cable and the pipeline and at a distance apart therefrom, which strap track is able to guide the strap in orbit around the pipe bundle before the strap tensioning operation is performed.

10. The arrangement according to claim 7 , wherein the arrangement is configured to strap a pipe bundle including at least one cable to a pipeline during continuous and contemporary laying of a strapped pipe bundle into a sea, and wherein the continuous motorized advancement device comprises a number of caterpillar tracks configured to act directly against surfaces of the at least one cable and the pipeline.

11. The arrangement according to claim 1 , further comprising guide rails, wherein the strapping machine is arranged on a chassis which in turn is attached to the vessel, and is moveable back and forth along the guide rails relative to the chassis.

12. The arrangement according to claim 11 , wherein the arrangement is configured to strap a pipe bundle including at least one cable to a pipeline during continuous and contemporary laying of a strapped pipe bundle into a sea, and wherein each strapping machine includes a strap tensioning device and an associated endless strap track configured to extend circumferentially around the at least one cable and the pipeline and at a distance apart therefrom, which strap track is able to guide the strap in orbit around the pipe bundle before the strap tensioning operation is performed.

13. The arrangement according to claim 11 , wherein the arrangement is configured to strap a pipe bundle including at least one cable to a pipeline during continuous and contemporary laying of a strapped pipe bundle into a sea, and wherein the continuous motorized advancement device comprises a number of caterpillar tracks configured to act directly against surfaces of the at least one cable and the pipeline.

14. The arrangement according to claim 1 , wherein the arrangement is configured to strap a pipe bundle including at least one cable to a pipeline during continuous and contemporary laying of a strapped pipe bundle into a sea, and wherein each strapping machine includes a strap tensioning device and an associated endless strap track configured to extend circumferentially around the at least one cable and the pipeline and at a distance apart therefrom, which strap track is able to guide the strap in orbit around the pipe bundle before the strap tensioning operation is performed.

15. The arrangement according to claim 14 , wherein the arrangement is configured to strap a pipe bundle including at least one cable to a pipeline during continuous and contemporary laying of a strapped pipe bundle into a sea, and wherein the continuous motorized advancement device comprises a number of caterpillar tracks configured to act directly against surfaces of the at least one cable and the pipeline.

16. The arrangement according to claim 1 , wherein the arrangement is configured to strap a pipe bundle including at least one cable to a pipeline during continuous and contemporary laying of a strapped pipe bundle into a sea, and wherein the continuous motorized advancement device comprises a number of caterpillar tracks configured to act directly against surfaces of the at least one cable and the pipeline.

17. The arrangement according to claim 1 , wherein the arrangement is configured to strap a pipe bundle including at least one cable to a pipeline during continuous and contemporary laying of a strapped pipe bundle into a sea, and wherein the S-forming device comprises a plurality of rollers configured to straddle over the at least one cable, and the plurality of rollers are configured to act directly on the at least one cable, move back and forth in a direction transverse to a longitudinal direction of the at least one cable, and shape the at least one cable into the S-form, and whereby the at least one cable frills along the pipeline while being firmly strapped with the pipeline.

18. A method to bundle by means of strapping a pipe bundle including at least one cable string to a pipeline to be continuously deployed into a sea from a pipelay vessel, the method comprising the steps of:

feeding or advancing said pipeline and each cable string in concert with and in contact with each other in a direction towards a strapping machine;

the strapping machine performing, at intervals, a strapping operation contemporary to that the strapping machine is moved in concert with the pipe bundle;

relocating the strapping machine relative to the pipe bundle for preparation to another strapping operation; and

shaping the at least one cable string, at a location adjacent to the strapping machine, into an S-form by laterally impacting the at least one cable string, while the at least one cable string remains resting against the pipeline, subsequent to the strapping operation and further on when the bundle enters the sea and downwards to a seabed.

19. The method according to claim 18 , wherein an interface between the pipeline and the at least one cable string is deformed for creation of natural saddle indentations in the strapping area.

20. The method according to claim 18 , wherein the strapping operation takes place at intervals between 2 to 10 meters.

21. The method according to claim 18 , wherein the strapping is performed with two strapping machines where each strap is placed between 50 and 500 mm apart when viewed in a longitudinal direction of the pipe bundle.

22. The method according to claim 18 , wherein the strapping takes place at intervals of about 6 meters.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 10, 2025
From: AKER SOLUTIONS AS
To: ONESUBSEA AS
Reel/Frame 073171/0859 →
MERGER AND CHANGE OF NAME Recorded Mar 2, 2017
From: AKER SUBSEA AS; AKER SOLUTIONS AS
To: AKER SOLUTIONS AS
Reel/Frame 041859/0328 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 17, 2012
From: HEGGDAL, OLE A.
To: AKER SUBSEA AS
Reel/Frame 028967/0069 →