IP Library Granted Patent US 9,110,268
Granted Patent B2
US 9,110,268 · App. 13/657,178 · Granted Aug 18, 2015

Cable pulling grip having toolless removal

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,110,268
App. No.
13/657,178
Granted
Aug 18, 2015
Kind
B2
Abstract

A combination of a pulling grip assembly and a fiber optic cable assembly for installing the fiber optic cable, including: a flexible grip having an open loop region for pull-force engagement and a closed region engaged with the strength member in a fiber optic cable assembly; a first heat shrunk member positioned about a portion of the distal end of the fiber optic cable assembly and the distal end of cable; and a second heat shrunk member positioned about a portion of the closed region of the flexible grip and the proximal end of the fiber optic cable assembly. A method of using the pulling grip assembly and a quick release pulling grip kit for installing fiber optic cable, as defined herein, are also disclosed.

Claims (17)

1. A method of installing a pulling grip assembly on a fiber optic cable assembly that includes a cable, the method comprising:

placing a cover sleeve over a portion of the fiber optic cable assembly;

attaching a flexible grip to a strength member of the cable in the fiber optic cable assembly to form the pulling grip assembly, wherein the flexible grip has an open loop region for pull-force engagement and a closed region engaged with the strength member;

heating a first heat shrinkable member that is positioned about a portion of a distal end of the cable and a first end of the cover sleeve to secure the cover sleeve to the fiber optic cable; and

heating a second heat shrinkable member that is positioned about a portion of the closed region of the flexible grip and a second end of the cover sleeve to secure the second heat shrinkable member to a portion of the flexible grip and the cover sleeve.

2. The method of claim 1 wherein the second heat shrunk member includes one or more perforations on the heat shrunk member's end nearest to the open loop region of the grip.

3. The method of claim 1 wherein the second heat shrunk member includes a notch at the junction of the open loop region and the closed region of the pulling grip.

4. The method of claim 1 wherein the second heat shrunk member is positioned about the entire length of the closed region of the flexible grip.

5. The method of claim 1 wherein the flexible grip comprises at least one of an adhesive tape, a flatenable woven tape, a rope, a flat rope, a cord, a wire, a wire cable, or a combination thereof.

6. The method of claim 1 wherein heating the first and second heat shrinkable members is accomplished at from about 65° C. (150° F.) to about 315° C. (600° F.).

7. The method of claim 1 wherein heating the first and second heat shrinkable members is accomplished at from about 148° C. (300° F.) to about 260° C. (500° F.).

8. The method of claim 1 , for installing fiber optic cable, comprising: pulling the fiber optic cable with the end of the pulling grip in an approximately co-linear direction to position the cable in a desired installation location; and removing the pulling grip from the pulling grip assembly by simultaneously pulling on side portions of the open region of the pulling grip in opposing directions and approximately perpendicular to the co-linear pull direction.

9. The method of claim 8 wherein pulling the fiber optic cable with the pulling grip, removing the pulling grip, or both, are accomplished manually or mechanically.

10. The method of claim 8 wherein removing the pulling grip from the pulling grip assembly and fiber optic cable combination is accomplished manually and without the use of any tools.

11. The method of claim 8 wherein removing the pulling grip from the pulling grip assembly is accomplished within about 10 seconds to 5 minutes.

12. The method of claim 1 wherein the cover sleeve comprises a split tube.

13. The method of claim 1 wherein the cover sleeve comprises a mesh cover.

Assignments (4)
MERGER Recorded Aug 18, 2017
From: CCS TECHNOLOGY, INC.; CORNING OPTICAL COMMUNICATIONS BRANDS, INC.
To: CORNING OPTICAL COMMUNICATIONS LLC
Reel/Frame 043601/0427 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 22, 2016
From: CORNING OPTICAL COMMUNICATIONS LLC
To: CCS TECHNOLOGY, INC.
Reel/Frame 040663/0047 →
CHANGE OF NAME Recorded Sep 23, 2016
From: CORNING CABLE SYSTEMS LLC
To: CORNING OPTICAL COMMUNICATIONS LLC
Reel/Frame 040126/0818 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 22, 2012
From: LEONARD, RONALD ALAN; SMITH, MATTHEW WADE; YATES, WESLEY ALLAN
To: CORNING CABLE SYSTEMS LLC
Reel/Frame 029167/0371 →