IP Library Granted Patent US 9,153,348
Granted Patent B2
US 9,153,348 · App. 13/701,862 · Granted Oct 6, 2015

Double-walled tube with interface gap and production method therefor

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,153,348
App. No.
13/701,862
Granted
Oct 6, 2015
Kind
B2
Abstract

After an inner wall tube, made of steel or alloy containing not less than 2% of Cr, whose outer surface thereof is machined and/or ground to a thickness of 0.1 mm or more including the scale layer, is inserted into an outer wall tube, made of ferritic steel containing not less than 2% of Cr, in which an oxide scale layer containing Cr and having a thickness of 10 to 30 μm is formed in the inner surface thereof, cold working at an outside diameter reduction rate of 5 to 30% is performed. Similarly cold worked after an inner wall tube having an oxide scale layer on the outer surface thereof, is inserted into an outer wall tube whose inner surface is machined and ground. A double-walled tube made has a uniform gap and an excellent thermal conductivity, and is suitable as materials for SG tubes of future FBR.

Claims (26)

1. A method for producing a double-walled tube with an interface gap, wherein the method comprises:

providing an outer wall tube made of ferritic steel containing not less than 2% by mass of Cr,

forming on said outer wall tube an oxide scale layer containing Cr,

wherein said oxide scale layer is formed on an inner surface of said outer wall tube and is formed having a thickness of 10 to 30 μm,

providing an inner wall tube made of steel or a steel alloy containing not less than 2% of Cr,

forming on said inner wall tube an oxide scale layer containing Cr,

wherein said oxide scale layer is formed on an outer surface of said inner wall tube,

grinding or machining said outer surface of said inner wall tube such that said oxide scale layer on said outer surface of said inner wall tube is of a thickness not less than 0.1 mm, and

inserting said inner wall tube into said outer wall tube and after said inner wall tube has been inserted into said outer wall tube, cold working an outside diameter of said outer wall tube with said inner wall tube inserted therein at a reduction rate of 5 to 30% in order to form said double-walled tube having said interface gap between said inner wall tube and said outer wall tube.

2. The method for producing a double-walled tube of claim 1 , further comprising: wherein said interface gap formed between said inner wall tube and said outer wall tube is 10 to 100 μm including said oxide scale layer.

3. The method for producing a double-walled tube of claim 2 , further comprising: wherein an interfacial pressure between said inner wall tube and said outer wall tube of said double-walled tube is 5 to 70 MPa.

4. The method for producing a double-walled tube of claim 3 , further comprising: wherein said double-walled tube is used as a steam generator tube of a fast breeder reactor.

5. The method for producing a double-walled tube of claim 2 , further comprising: wherein said double-walled tube is used as a steam generator tube of a fast breeder reactor.

6. A method for producing a double-walled tube, wherein the method comprises:

providing an inner wall tube made of ferritic steel containing not less than 2% by mass of Cr,

forming on said inner wall tube in which an oxide scale layer containing Cr,

wherein said oxide scale layer is formed on an outer surface of said inner wall tube and is formed having a thickness of 10 to 30 μm,

providing an outer wall tube made of steel or a steel alloy containing not less than 2% by mass of Cr,

forming on said outer wall tube an oxide scale layer containing Cr,

wherein said oxide scale layer is formed on an inner surface of said outer wall tube,

grinding or machining said inner surface of said outer wall tube such that said oxide scale layer on said inner surface of said outer wall tube is of a thickness not less than 0.1 mm, and

inserting said inner wall tube into said outer tube and after said inner wall tube has been inserted into said outer wall tube, cold working an outside diameter of said outer wall tube with said inner wall tube inserted therein at a reduction rate of 5 to 30% in order to form said double-walled tube having said interface gap between said inner wall tube and said outer wall tube.

7. The method for producing a double-walled tube of claim 6 , further comprising: wherein said interface gap is 10 to 100 μm including said oxide scale layer.

8. The method for producing a double-walled tube of claim 7 , further comprising: wherein an interracial pressure between said inner wall tube and said outer wall tube of said double-walled tube is 5 to 70 MPa.

9. The method for producing a double-walled tube of claim 8 , further comprising: wherein said double-walled tube is used as a steam generator tube of a fast breeder reactor.

10. The method for producing a double-walled tube of claim 7 , further comprising: wherein said double-walled tube is used as a steam generator tube of a fast breeder reactor.

Assignments (2)
CHANGE OF NAME Recorded May 14, 2019
From: NIPPON STEEL & SUMITOMO METAL CORPORATION
To: NIPPON STEEL CORPORATION
Reel/Frame 049257/0828 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 4, 2012
From: ISEDA, ATSURO; NAKASHIMA, TAKASHI; YOKOYAMA, TETSUO; KAWAKAMI, TADASHI; HANADA, TAKUYA
To: NIPPON STEEL & SUMITOMO METAL CORPORATION
Reel/Frame 029398/0648 →