IP Library Granted Patent US 8,948,116
Granted Patent B2
US 8,948,116 · App. 13/727,637 · Granted Feb 3, 2015

Use of the physical uplink control channel in a 3

Inventors: Nick W. Whinnett (Marlborough, GB); Fei Tong (Swindon, GB); Weimin Xiao (Barrington, IL); Robert T. Love (Barrington, IL)
Assignee: Google Technology Holdings LLC
H04W72/04H04L1/0027H04W72/1257H04W72/1268
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,948,116
App. No.
13/727,637
Granted
Feb 3, 2015
Kind
B2
Abstract

In a 3 rd Generation Partnership Project, 3GPP, communication system a base station comprises a scheduler allocating communication resource of at least one of a Physical Uplink Shared CHannel, PUSCH, and a Physical Downlink Shared CHannel, PDSCH to a User Equipment (UE). The scheduling may either be a dynamic scheduling wherein a resource allocation for a single frame is provided to the UE or a persistent scheduling wherein a resource allocation for a plurality of frames is provided to the UE. A resource allocator assigns resource of a Physical Uplink Control CHannel, PUCCH, to the UE dependent on whether dynamic scheduling or persistent scheduling is performed by the scheduler for the UE. The UE transmits uplink control data on a physical uplink channel which is selected as the PUCCH or the PUSCH in response to whether persistent scheduling is used for the UE. The invention allows e.g. reduced PUCCH loading.

Claims (30)

1. A 3 rd Generation Partnership Project, 3GPP, communication system comprising:

a scheduler for allocating communication resource to a User Equipment, UE, the communication resource being a communication resource of at least one of a Physical Uplink Shared CHannel, PUSCH, and a Physical Downlink Shared CHannel, PDSCH, the scheduler being operable to perform a dynamic scheduling wherein a resource allocation for a single frame is provided to the UE or a persistent scheduling wherein a resource allocation for a plurality of frames is provided to the UE;

a resource allocator for assigning resource of a Physical Uplink Control CHannel, PUCCH, to the UE, the assignment of the PUCCH resource to the UE being dependent on whether dynamic scheduling or persistent scheduling is performed by the scheduler for the UE.

2. The 3GPP communication system of claim 1 wherein the UE comprises a transmitter for transmitting uplink control data to a base station on a physical uplink channel; and

a processor for selecting the physical uplink channel as the PUCCH or the PUSCH in response to whether persistent scheduling is used for the UE.

3. The 3GPP communication system of claim 2 wherein the UE is arranged to select the PUSCH in all subframes for which the UE has received a resource allocation by persistent scheduling.

4. The 3GPP communication system of claim 3 wherein the UE is arranged to select between the PUCCH and the PUSCH for a subframe when dynamic scheduling is used for the UE dependent on whether other uplink data is transmitted on the PUSCH in the subframe.

5. The 3GPP communication system of claim 2 wherein the scheduler is arranged to allocate the communication resource to a speech burst of a voice communication from the UE, and the communication system furthermore comprises:

a detector for detecting the end of a speech burst in response to receiving uplink control data in a PUSCH subframe not comprising any voice data.

6. The 3GPP communication system of claim 5 wherein the scheduler is arranged to modify a persistent scheduling interval in response to the detection of the end of the speech burst.

7. The 3GPP communication system of claim 2 wherein the uplink control data comprises Channel Quality Indicator, CQI, data.

8. The 3GPP communication system of claim 2 wherein the uplink control data comprises retransmission acknowledgement data.

9. The 3GPP communication system of claim 2 wherein the uplink control data comprises, Precoding Matrix Index, PMI, data.

10. The 3GPP communication system of claim 1 wherein the scheduler is furthermore arranged to align PUSCH resource allocations of a persistent scheduling and reporting times of the uplink control data.

11. The 3GPP communication system of claim 1 wherein the scheduler is furthermore arranged to align PUSCH resource allocations and PDSCH resource allocations for persistent schedulings of both the PUSCH and PDSCH such that transmission times of acknowledgement data corresponding to PDSCH resource allocations coincide with PUSCH resource allocations.

12. The 3GPP communication system of claim 1 further comprising means for reducing an amount of Channel Quality Indicator, CQI, data transmitted from the UE if persistent scheduling is used for the PDSCH.

13. The 3GPP communication system of claim 12 wherein a number of bits used for each CQI indication is reduced if persistent scheduling is used for the PDSCH.

14. The 3GPP communication system of claim 12 wherein CQI data is transmitted only on the PUSCH.

15. The 3GPP communication system of claim 14 wherein CQI data is transmitted only when other uplink data is transmitted from the UE on the PUSCH.

16. The 3GPP communication system of claim 1 wherein the communication resource is a communication resource of the PUSCH.

17. The 3GPP communication system of claim 1 wherein the communication resource is a communication resource of the PDSCH.

18. A base station for a 3 rd Generation Partnership Project, 3GPP, communication system, the base station comprising:

a scheduler for allocating communication resource to a User Equipment, UE, the communication resource being a communication resource of at least one of a Physical Uplink Shared CHannel, PUSCH, and a Physical Downlink Shared CHannel, PDSCH, the scheduler being operable to perform a dynamic scheduling wherein a resource allocation for a single frame is provided to the UE or a persistent scheduling wherein a resource allocation for a plurality of frames is provided to the UE;

a resource allocator for assigning resource of a Physical Uplink Control CHannel, PUCCH, to the UE, the assignment of the PUCCH resource to the UE being dependent on whether dynamic scheduling or persistent scheduling is performed by the scheduler for the UE.

19. A User Equipment, UE, for a 3 rd Generation Partnership Project, 3GPP, communication system including a scheduler for allocating communication resource to the UE, the communication resource being a communication resource of at least one of a Physical Uplink Shared CHannel, PUSCH, and a Physical Downlink Shared CHannel, PDSCH, the scheduler being operable to perform a dynamic scheduling wherein a resource allocation for a single frame is provided to the UE or a persistent scheduling wherein a resource allocation for a plurality of frames is provided to the UE; the UE comprising:

a transmitter for transmitting uplink control data to a base station on a physical uplink channel; and

a processor for selecting the uplink communication channel as a Physical Uplink Control CHannel, PUCCH, or the PUSCH in response to whether persistent scheduling is used for the UE.

20. A method of operation for a 3 rd Generation Partnership Project, 3GPP, communication system comprising:

allocating communication resource to a User Equipment, UE, the communication resource being a communication resource of at least one of a Physical Uplink Shared CHannel, PUSCH, and a Physical Downlink Shared CHannel, PDSCH, the allocating of the communication resource being a dynamic scheduling wherein a resource allocation for a single frame is provided to the UE or a persistent scheduling wherein a resource allocation for a plurality of frames is provided to the UE; and

assigning resource of a Physical Uplink Control CHannel, PUCCH, to the UE dependent on whether dynamic scheduling or persistent scheduling is performed for the UE.

Assignments (6)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 30, 2014
From: MOTOROLA MOBILITY LLC
To: GOOGLE TECHNOLOGY HOLDINGS LLC
Reel/Frame 034500/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 14, 2014
From: MOTOROLA MOBILITY, INC.
To: MOTOROLA MOBILITY LLC
Reel/Frame 034246/0257 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 10, 2014
From: WHINNETT, NICK W.; TONG, FEI; XIAO, WEIMIN; LOVE, ROBERT T.
To: MOTOROLA, INC.
Reel/Frame 034197/0399 →
CERTIFICATE OF CONVERSION Recorded Nov 7, 2014
From: MOTOROLA MOBILITY, INC.
To: MOTOROLA MOBILITY LLC
Reel/Frame 034384/0647 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 6, 2014
From: MOTOROLA, INC.
To: MOTOROLA MOBILITY, INC.
Reel/Frame 034123/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 4, 2014
From: WHINNETTT, NICK W.; TONG, FEI; XIAO, WEIMIN; LOVE, ROBERT T.
To: MOTOROLA, INC.
Reel/Frame 034160/0909 →
Continuity (2)
Continuation 11764236 · Jun 18, 2007
Related Publication 20130114543A1 · May 9, 2013