System and method for monitoring electrical power usage in an electrical power infrastructure of a building

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,291,694
App. No.
13/736,778
Granted
Mar 22, 2016
Kind
B2
Abstract

Some embodiments can concern a method of using an electrical sensor device. The method can include: determining a first current measurement of a first current in an electrical power infrastructure and a first phase angle measurement of the first current; determining that a first load is coupled to the electrical power infrastructure; while the first load is coupled to the electrical power infrastructure, determining a second current measurement of a second current in the electrical power infrastructure and a second phase angle measurement of the second current; and using a Kalman filter to determine one or more first calibration coefficients for the electrical sensor device at least in part using the first current measurement, the second current measurement, the first phase angle, and the second phase angle. Other embodiments are disclosed.

Claims (24)

1. A method comprising:

using an electrical sensor device, determining a first current measurement of a first current in an electrical power infrastructure of a building and a first phase angle measurement of the first current, wherein the electrical sensor device is coupled to a first surface of a circuit breaker box, the circuit breaker box is overlying the electrical power infrastructure of the building, and the electrical sensor device comprises two or more electrical current sensors;

determining that a first load is coupled to the electrical power infrastructure;

while the first load is coupled to the electrical power infrastructure, determining a second current measurement of a second current in the electrical power infrastructure and a second phase angle measurement of the second current; and

using a Kalman filter to determine one or more first calibration coefficients for the electrical sensor device at least in part using the first current measurement, the second current measurement, the first phase angle measurement, and the second phase angle measurement;

wherein:

the first phase angle measurement of the first current is relative to a phase of a first voltage drop across the electrical power infrastructure of the building; and

the second phase angle measurement of the second current is relative to a phase of a second voltage drop across the electrical power infrastructure of the building.

2. The method of claim 1 , further comprising:

determining the first voltage drop across the electrical power infrastructure of the building.

3. The method of claim 1 , further comprising:

while the first load is coupled to the electrical power infrastructure, determining the second voltage drop across the electrical power infrastructure of the building.

4. The method of claim 1 , further comprising:

determining that the first load is uncoupled from the electrical power infrastructure.

5. The method of claim 1 , wherein:

using the Kalman filter comprises:

using one or more computer processors to apply the Kalman filter.

6. The method of claim 4 , further comprising:

after determining that the first load is uncoupled from the electrical power infrastructure, determining a third current measurement of a third current in the electrical power infrastructure and a third phase angle measurement of the third current; and

determining a first electrical power used by the electrical power infrastructure of the building using the third current measurement of the third current in the electrical power infrastructure and the third phase angle measurement of the third current and the one or more first calibration coefficients,

wherein:

the third phase angle measurement of the third current is relative to the phase of a third voltage drop across the electrical power infrastructure of the building.

7. The method of claim 6 , further comprising:

determining the third voltage drop across the electrical power infrastructure of the building.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 25, 2016
From: YOGEESWARAN, KARTHIK; REYNOLDS, MATTHEW S.; PATEL, SHWETAK N.
To: BELKIN INTERNATIONAL, INC.
Reel/Frame 038366/0390 →
SUPPLEMENT NO. 5 TO PATENT SECURITY AGREEMENT Recorded Mar 28, 2013
From: BELKIN INTERNATIONAL, INC.
To: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS AGENT
Reel/Frame 030106/0741 →