IP Library Granted Patent US 8,985,704
Granted Patent B2
US 8,985,704 · App. 13/739,368 · Granted Mar 24, 2015

Continuous-extraction mining system

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,985,704
App. No.
13/739,368
Granted
Mar 24, 2015
Kind
B2
Abstract

A material extraction system is provided for an underground mine. The mine includes a roadway entry and a draw-bell entry intersecting the roadway entry and affording access to a draw-bell. The system generally includes a loader movable from the roadway entry into the draw-bell entry for removing material from the draw-bell, a sizer coupled to the loader for sizing the removed material, a material collector operable to collect the sized material, and a shuttle car operable to receive the collected material from the material collector. The material collector has a loading end and a discharge end, and material transport device extending therebetween. The shuttle car is movable along the roadway entry for transferring the collected material so as to facilitate a substantially continuous extraction of the material.

Claims (40)

1. A material extraction system for an underground mine, the mine including a roadway entry and a draw-bell entry intersecting the roadway entry and affording access to a draw-bell, the system comprising:

a loader movable from the roadway entry into the draw-bell entry for removing material from the draw-bell;

a mobile sizer coupled to the loader for sizing the removed material;

a material collector operable to collect the sized material, the material collector having a loading end and a discharge end, and a material transport device extending therebetween; and

a shuttle car operable to receive the collected material from the material collector, the shuttle car being movable along the roadway entry for transferring the collected material so as to facilitate a substantially continuous extraction of the material,

wherein the sizer is configured to size the removed material on a substantially continuous basis by receiving removed material from a feed conveyor on the loader and discharging the sized material to the material collector with a discharge conveyor,

wherein the material collector is operable as a buffer to hold the sized material until the shuttle car is in a position relative to the material collector to receive the collected material from the material collector.

2. The system of claim 1 , wherein the sizer includes a self-contained power supply.

3. The system of claim 2 , wherein the material collector is powered at least in part by the self-contained power supply of the sizer.

4. The system of claim 1 , wherein the material collector includes wheels engageable with a mine floor.

5. The system of claim 1 , wherein the loader includes a chassis and a loading arm movably coupled to the chassis and operable to move material from the draw-bell toward the chassis.

6. The system of claim 5 , wherein the loading arm moves the removed material onto the feed conveyor.

7. The system of claim 5 , wherein the loader includes a rock breaker mounted to an end of the loading arm.

8. The system of claim 5 , wherein the loader further includes a carriage movable along the chassis, and wherein the loading arm is coupled to the carriage for movement therewith.

9. The system of claim 1 , wherein the shuttle car comprises steerable wheels engageable with a mine floor.

10. The system of claim 1 , wherein the shuttle car comprises wheels for movement over rails.

11. The system of claim 1 , wherein at least a portion of the shuttle car comprises a chromium carbide overlay plate.

12. The system of claim 1 , wherein the removed material is received by the sizer at an upper portion of the sizer and the sized material is discharged by the sizer at a lower portion of the sizer.

13. The system of claim 12 , wherein the discharge conveyor extends upwardly from the lower portion of the sizer to a position above a portion of the material collector.

14. The system of claim 1 , wherein the material collector places the sized material at a substantially elevated position relative to a mine floor.

15. The system of claim 1 , wherein the loader moves into the draw-bell entry to remove material while the mobile sizer, the material collector, and the shuttle car remain in the roadway entry.

16. A method of extracting material for an underground mine, the mine including a roadway entry and a draw-bell entry intersecting the roadway entry and affording access to a draw-bell, the method comprising:

moving a loader from the roadway entry into the draw-bell entry;

removing material from the draw-bell using the loader;

sizing the removed material on a substantially continuous basis using a mobile sizer that is coupled to the loader by a feed conveyor;

discharging the sized material from the sizer using a discharge conveyor;

collecting the sized material from the discharge conveyor on a material collector, the material collector acting as a buffer to hold the sized material until the shuttle car is in a position relative to the material collector to receive the collected material from the material collector; and

transferring the collected material along the roadway entry using a shuttle car so as to facilitate a continuous extraction of the material.

17. The method of claim 16 , wherein the material collector includes a loading end and a discharge end and a material transport device extending therebetween, and the collected material is conveyed using the material transport device for transferring onto the shuttle car.

18. The method of claim 16 , wherein the material collector engages a mine floor with wheels.

19. The method of claim 16 , wherein the shuttle car engages a mine floor with steerable wheels.

20. The method of claim 16 , wherein discharging of the sized material from the sizer occurs at a lower portion of the sizer and further includes raising the sized material upwardly to a position above a portion of the material collector.

21. The method of claim 16 , wherein the sized material is placed at a substantially elevated position relative to a mine floor.

22. A material extraction system for an underground mine, the mine including a roadway entry and a draw-bell entry intersecting the roadway entry and affording access to a draw-bell, the system comprising:

a loader movable from the roadway entry into the draw-bell entry for removing material from the draw-bell;

a mobile sizer coupled to the loader for sizing the removed material on a substantially continuous basis;

a material collector operable to store the sized material, the material collector having a loading end and a discharge end, a material transport device extending therebetween, and wheels engageable with a mine floor; and

a shuttle car operable to receive the collected material from the material collector, the shuttle car including steerable wheels engageable with a mine floor for moving along the roadway entry for transferring the collected material so as to facilitate a substantially continuous extraction of the material,

wherein the sizer is configured to size the removed material on a substantially continuous basis by receiving removed material from a feed conveyor on the loader and discharging the sized material to the material collector with a discharge conveyor,

wherein the material collector is operable as a buffer to hold the sized material until the shuttle car is in a position relative to the material collector to receive the collected material from the material collector.

Assignments (2)
MERGER Recorded Sep 17, 2018
From: JOY MM DELAWARE, INC.
To: JOY GLOBAL UNDERGROUND MINING LLC
Reel/Frame 047096/0399 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 11, 2013
From: ZIMMERMAN, JOSEPH J.; HERDLE, DAVID KEVIN; GOOD, TYLER
To: JOY MM DELAWARE, INC.
Reel/Frame 029613/0814 →