IP Library Granted Patent US 8,915,679
Granted Patent B2
US 8,915,679 · App. 13/741,798 · Granted Dec 23, 2014

Pneumatic transport with multi vessel discharge

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,915,679
App. No.
13/741,798
Granted
Dec 23, 2014
Kind
B2
Abstract

An ash transport system and method is provided that includes a transport line, four hoppers, and an airlock or hopper valve attached to each hopper. The ash transport system transports an ash mass from the airlock or hopper valve to the transport line if pressure in the transport line falls below a predefined pressure threshold assigned to the respective airlock or hopper valve. After a predefined period of time elapses, the ash transport system transports the ash mass from the airlock or hopper valve to the transport line if the pressure in the transport line falls below different respective predefined pressure thresholds. The airlocks and hopper valves simultaneously transport the ash masses to the transport line if, prior to the predefined period of time elapsing, the pressure in the transport line falls below each of the respective predefined pressure thresholds.

Claims (68)

1. An ash transport system comprising a first airlock, a second airlock, a transport line, a first airlock valve between the first airlock and the transport line, a second airlock valve between the second airlock and the transport line, a pressure sensor for measuring pressure in the transport line, and a controller configured to control the ash transport system to:

open the first airlock valve to transport ash from the first airlock to the transport line upon the pressure falling below a first pressure threshold prior to a predefined period of time elapsing;

open the second airlock valve to transport ash from the second airlock to the transport line upon the pressure falling below a second pressure threshold prior to the predefined period of time elapsing, the second pressure threshold being lower than the first pressure threshold;

and open the second airlock valve to transport, after the predefined period of time elapses, ash from the second airlock to the transport line upon the pressure falling below a third pressure threshold that is higher than the second pressure threshold.

2. The ash transport system of claim 1 wherein the third pressure threshold is equal to the first pressure threshold.

3. The ash transport system of claim 1 further comprising a first hopper and a second hopper respectively attached to the first airlock and the second airlock, a first hopper valve between the first hopper and the first airlock, and a second hopper valve between the second hopper and the second airlock, the controller being further configured to control the ash transport system to:

open the first hopper valve to transport ash from the first hopper to the first airlock; and

open the second hopper valve to transport ash from the second hopper to the second airlock.

4. The ash transport system of claim 1 wherein the predefined period of time is based on an amount of time required to empty the any one of the first airlock and the second airlock of the ash transport system.

5. The ash transport system of claim 1 further comprising a pressure blower attached to the transport line and configured to cause ash to be transported through the transport line.

6. The ash transport system of claim 1 wherein the first pressure threshold, the second pressure threshold, and the third pressure threshold are predefined.

7. The ash transport system of claim 1 further comprising a compressor attached to the transport line and configured to cause ash to be transported through the transport line.

8. The ash transport system of claim 7 wherein the first, pressure threshold, the second pressure threshold, and the third pressure threshold vary based on an amount of air transported to the transport line by the compressor.

9. The ash transport system of claim 1 , the controller being further configured to control the ash transport system to open the second airlock valve while the first airlock valve remains open when, prior the predefined period of time elapsing, the pressure in the transport line falls below the first pressure threshold and below the second pressure threshold.

10. The ash transport system of claim 1 , the controller being further configured to control the ash transport system to open the first airlock valve, after the predefined period of time elapses, to transport ash from the first airlock to the transport line when the pressure in the transport line falls below a fourth pressure threshold that is different from the first pressure threshold.

11. The ash transport system of claim 10 wherein the third pressure threshold is equal to the first pressure threshold, and wherein the fourth pressure threshold is equal to the second pressure threshold.

12. The ash transport system of claim 1 , wherein the predefined period of time is a first predefined period of time, the controller being further configured to control the ash transport system to open the second airlock valve, after a second predefined period of time that begins elapsing after the first predefined period of time has elapsed, ash from the second airlock to the transport line when the pressure in the transport line falls below a fourth pressure threshold that is different from the second and third pressure thresholds.

13. The ash transport system of claim 1 , the controller being further configured to cause the ash transport system to close the second airlock valve to the transport line if the pressure in the transport line exceeds a fourth pressure threshold lower than the first pressure threshold and the second pressure threshold.

14. The ash transport system of claim 13 , the controller being further configured to cause the ash transport system to close the first airlock valve when the pressure in the transport line exceeds a fifth pressure threshold higher than the fourth pressure threshold, but lower than the first pressure threshold.

15. The ash transport system of claim 1 further comprising a third airlock and a third airlock valve between the third airlock and the transport line, the controller being further configured to cause the ash transport system to open the third airlock valve to transport, prior to the predefined period of time, ash from the third airlock to the transport line when the pressure in the transport line falls below a fourth pressure threshold, wherein the first pressure threshold, the second pressure threshold, and the fourth pressure threshold are different from each other.

16. The ash transport system of claim 15 , the controller being further configured to control the ash transport system to open the third airlock valve, after the predefined period of time elapses, to transport ash from the third airlock to the transport line if the pressure in the transport line falls below the second pressure threshold, wherein the third pressure threshold is equal to the first pressure threshold.

17. The ash transport system of claim 15 further comprising a fourth airlock and a fourth airlock valve between the fourth airlock and the transport line, the controller being further configured to control the ash transport system to open the fourth airlock valve, prior to the predefined period of time, to transport ash from the fourth airlock to the transport line when pressure in the transport line falls below a fifth pressure threshold that is different from the first pressure threshold, the second pressure threshold, and the fourth pressure threshold.

18. The ash transport system of claim 15 , the controller being further configured to control the ash transport system to fill the first airlock while emptying the third airlock.

19. A method of transporting ash, the method comprising:

measuring pressure in a transport line;

opening a first airlock valve to transport ash from a first airlock to the transport line when the pressure in the transport line crosses a first pressure threshold;

opening a second airlock valve to transport ash from a second airlock to the transport line when the pressure in the transport line crosses a second pressure threshold lower than the first pressure threshold; and

opening the second airlock valve, after a predefined period of time elapses, to transport ash from the second airlock to the transport line when the pressure in the transport line crosses a third pressure threshold that is higher than the second pressure threshold.

20. The method of claim 19 wherein the third pressure threshold is equal to the first pressure threshold.

21. The method of claim 19 further comprising:

transporting ash from a first hopper to the first airlock; and

transporting ash from a second hopper to the second airlock.

22. The method of claim 19 further comprising transporting ash through the transport line using a pressure blower.

23. The method of claim 19 further comprising transporting ash through the transport line using a compressor.

24. The method of claim 19 further comprising transporting ash simultaneously from the first and second airlocks to the transport line.

25. The method of claim 19 further comprising opening the first airlock valve, after the predefined period of time elapses, to transport ash from the first airlock to the transport line if the pressure in the transport line crosses a fourth pressure threshold that is different from the first pressure threshold.

26. The method of claim 19 further comprising closing the second airlock valve to stop transporting ash from the second airlock to the transport line when the pressure in the transport line crosses a fourth pressure threshold.

27. The method of claim 19 further comprising opening a third airlock valve to transport ash from a third airlock to the transport line when the pressure in the transport line crosses a fourth pressure threshold, wherein the first pressure threshold, the second pressure threshold, and the fourth pressure threshold are different from each other.

28. The method of claim 27 further comprising opening the third airlock valve, after the predefined period of time elapses, to transport ash from the third airlock to the transport line when the pressure in the transport line falls below the second pressure threshold, wherein the third pressure threshold is equal to the first pressure threshold.

29. An ash transport system comprising:

a transport line;

a pressure sensor for measuring pressure in the transport line;

first and second airlocks;

a first airlock valve between the first airlock and the transport line, a second airlock valve between the second airlock and the transport line,

first and second hoppers respectively attached to the first and second airlocks, and

a controller configured to control the ash transport system to:

open the first airlock valve to transport ash from the first airlock to the transport line upon the pressure falling below a first pressure threshold prior to a predefined period of time elapsing;

open the second airlock valve to transport ash from the second airlock to the transport line upon the pressure falling below a second pressure threshold prior to the predefined period of time elapsing, the second pressure threshold being lower than the first pressure threshold;

open the first airlock valve to transport, after the predefined period of time elapses, ash from the first airlock to the transport line upon the pressure falling below a third pressure threshold that is lower than the second pressure threshold; and

open the second airlock valve to transport, after the predefined period of time elapses, ash from the second airlock to the transport line upon the pressure falling below the first pressure threshold.

30. An ash transport system comprising a first hopper with a first hopper valve and containing a first ash mass, a second hopper with a second hopper valve and containing a second ash mass, a transport line, a vacuum pump attached to the transport line and configured to cause the first and second ash masses to be transported through the transport line, a pressure sensor for measuring pressure in the transport line, and a controller configured to control the ash transport system to:

open the first hopper valve to transport the first ash mass from the first hopper to the transport line upon the pressure falling below a first pressure threshold prior to a predefined period of time elapsing;

open the second hopper valve to transport the second ash mass from the second hopper to the transport line upon the pressure falling below a second pressure threshold prior to the predefined period of time elapsing, the second pressure threshold being lower than the first pressure threshold; and

open the second hopper valve to transport, after the predefined period of time elapses, ash from the second hopper to the transport line upon the pressure falling below a third pressure threshold that is higher than the second pressure threshold.

31. The ash transport system of claim 30 wherein the third pressure threshold is equal to the first pressure threshold.

32. The ash transport system of claim 30 , the controller being further configured to cause the ash transport system to:

transport the first ash mass from the first hopper to the first hopper valve; and

transport the second ash mass from the second hopper to the second hopper valve.

33. The ash transport system of claim 32 further comprising:

a level probe attached to the first hopper and configured to detect whether the first hopper is filled to less than a predefined level; and

a vibrator attached to the first hopper, the controller being configured to cause the vibrator to vibrate when the level probe detects that the first hopper is filled to less than a predefined level.

34. The ash transport system of claim 30 wherein the predefined period of time is based on an amount of time required to empty any one hopper in the ash transport system.

35. The ash transport system of claim 30 , the controller being further configured to control the ash transport system to transport ash simultaneously from the first and second hopper valves to the transport line if, prior the predefined period of time elapsing, the pressure in the transport line falls below the first pressure threshold and below the second pressure threshold.

36. The ash transport system of claim 30 , the controller being further configured to control the ash transport system to open the first hopper valve to transport, after the predefined period of time, ash from the first hopper valve to the transport line when the pressure in the transport line falls below a fourth pressure threshold that is different from the first pressure threshold.

37. The ash transport system of claim 30 further comprising a third hopper valve and a fourth hopper valve, the controller being further configured to control the ash transport system to:

open the third hopper valve to transport ash from the third hopper valve to the transport line if pressure in the transport line falls below a fourth pressure threshold; and

open the fourth hopper valve to transport ash from the fourth hopper valve to the transport line if pressure in the transport line falls below a fifth pressure threshold,

wherein the first pressure threshold, the second pressure threshold, the fourth pressure threshold, and the fifth pressure threshold are different from each other.

Assignments (23)
PARTIAL RELEASE OF SECURITY INTEREST Recorded Dec 5, 2025
From: AXOS BANK, AS AGENT
To: ALLEN-SHERMAN-HOFF, LLC; THE BABCOCK & WILCOX COMPANY
Reel/Frame 073868/0716 →
RELEASE OF SECURITY INTEREST Recorded Nov 7, 2025
From: GLAS TRUST COMPANY LLC
To: ALLEN-SHERMAN-HOFF, LLC; THE BABCOCK & WILCOX COMPANY
Reel/Frame 072834/0052 →
RELEASE OF SECURITY INTEREST Recorded Nov 7, 2025
From: B. RILEY FINANCIAL, INC.
To: ALLEN-SHERMAN-HOFF, LLC; THE BABCOCK & WILCOX COMPANY
Reel/Frame 072834/0012 →
RELEASE OF SECURITY INTEREST Recorded Nov 7, 2025
From: PENSION BENEFIT GUARANTY CORPORATION
To: ALLEN-SHERMAN-HOFF, LLC; THE BABCOCK & WILCOX COMPANY
Reel/Frame 072834/0040 →
SECURITY INTEREST Recorded Aug 18, 2025
From: ALLEN-SHERMAN-HOFF, LLC
To: B. RILEY FINANCIAL, INC.
Reel/Frame 072041/0948 →
SECURITY INTEREST Recorded Aug 1, 2025
From: ALLEN-SHERMAN-HOFF, LLC
To: AXOS BANK
Reel/Frame 071906/0398 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 1, 2025
From: DIAMOND POWER INTERNATIONAL, LLC
To: ALLEN-SHERMAN-HOFF, LLC
Reel/Frame 071915/0218 →
SECURITY INTEREST Recorded Aug 1, 2025
From: ALLEN-SHERMAN-HOFF, LLC
To: GLAS TRUST COMPANY LLC
Reel/Frame 071915/0254 →
SECURITY INTEREST Recorded Aug 1, 2025
From: ALLEN-SHERMAN-HOFF, LLC
To: PENSION BENEFIT GUARANTY CORPORATION
Reel/Frame 071915/0271 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 31, 2025
From: DIAMOND POWER INTERNATIONAL, LLC
To: ALLEN-SHERMAN-HOFF, LLC
Reel/Frame 071894/0649 →
SECURITY INTEREST Recorded Jul 18, 2025
From: BABCOCK & WILCOX ENTERPRISES, INC.; THE BABCOCK & WILCOX COMPANY; DIAMOND POWER INTERNATIONAL, LLC; BABCOCK & WILCOX SPIG, INC.; BABCOCK & WILCOX CANADA CORP.; BABCOCK & WILCOX FPS INC.
To: B. RILEY FINANCIAL, INC.
Reel/Frame 072053/0943 →
SECURITY INTEREST Recorded May 23, 2025
From: BABCOCK & WILCOX ENTERPRISES, INC.; THE BABCOCK & WILCOX COMPANY; DIAMOND POWER INTERNATIONAL, LLC; BABCOCK & WILCOX SPIG, INC.; BABCOCK & WILCOX CANADA CORP.; BABCOCK & WILCOX FPS INC.
To: GLAS TRUST COMPANY LLC
Reel/Frame 071371/0835 →
CHANGE OF NAME Recorded Apr 1, 2025
From: DIAMOND POWER INTERNATIONAL, INC.
To: DIAMOND POWER INTERNATIONAL, LLC
Reel/Frame 070693/0034 →
SECURITY INTEREST Recorded Mar 3, 2025
From: BABCOCK & WILCOX ENTERPRISES, INC.; THE BABCOCK & WILCOX COMPANY; DIAMOND POWER INTERNATIONAL, LLC; BABCOCK & WILCOX SPIG, INC.; BABCOCK & WILCOX CANADA CORP.; BABCOCK & WILCOX FPS INC.
To: PENSION BENEFIT GUARANTY CORPORATION
Reel/Frame 070380/0647 →
RELEASE OF SECURITY INTEREST Recorded Sep 13, 2024
From: MSD PCOF PARTNERS XLV, LLC
To: THE BABCOCK & WILCOX COMPANY; DIAMOND POWER INTERNATIONAL, LLC; AMERICON LLC
Reel/Frame 069017/0362 →
SECURITY INTEREST Recorded Jan 19, 2024
From: BABCOCK & WILCOX ENTERPRISES, INC.; THE BABCOCK & WILCOX COMPANY; DIAMOND POWER INTERNATIONAL, LLC; BABCOCK & WILCOX SPIG, INC.; BABCOCK & WILCOX CANADA CORP.; BABCOCK & WILCOX FPS INC.
To: AXOS BANK, AS ADMINISTRATIVE AGENT
Reel/Frame 066354/0765 →
SECURITY INTEREST Recorded Jul 22, 2021
From: THE BABCOCK & WILCOX COMPANY (F/K/A BABCOCK & WILCOX POWER GENERATION GROUP, INC.); BABCOCK & WILCOX SPIG, INC.; BABCOCK & WILCOX TECHNOLOGY, LLC; DIAMOND POWER INTERNATIONAL, LLC (F/K/A DIAMOND POWER INTERNATIONAL, INC.)
To: MSD PCOF PARTNERS XLV, LLC, AS AGENT
Reel/Frame 056962/0486 →
RELEASE OF SECURITY INTEREST Recorded Jul 1, 2021
From: BANK OF AMERICA, N.A.
To: DIAMOND POWER INTERNATIONAL, LLC (F/K/A DIAMOND POWER INTERNATIONAL, INC.); MEGTEC TURBOSONIC TECHNOLOGIES, INC.; THE BABCOCK & WILCOX COMPANY (F/K/A BABCOCK & WILCOX POWER GENERATION GROUP, INC.); BABCOCK & WILCOX SPIG, INC.; BABCOCK & WILCOX TECHNOLOGY, LLC (F/K/A MCDERMOTT TECHNOLOGY, INC.); SOFCO-EFS HOLDINGS LLC; BABCOCK & WILCOX MEGTEC, LLC
Reel/Frame 057337/0823 →
RELEASE OF SECURITY INTEREST Recorded May 17, 2018
From: LIGHTSHIP CAPITAL LLC
To: BABCOCK & WILCOX ENTERPRISES, INC.; THE BABCOCK & WILCOX COMPANY; DIAMOND POWER INTERNATIONAL, LLC; BABCOCK & WILCOX MEGTEC, LLC; MEGTEC TURBOSONIC TECHNOLOGIES, INC.; BABCOCK & WILCOX UNIVERSAL, INC.; BABCOCK & WILCOX TECHNOLOGY, LLC
Reel/Frame 046182/0829 →
SECURITY INTEREST Recorded Aug 10, 2017
From: THE BABCOCK & WILCOX COMPANY; DIAMOND POWER INTERNATIONAL, LLC; BABCOCK & WILCOX MEGTEC, LLC; MEGTEC TURBOSONIC TECHNOLOGIES, INC.; BABCOCK & WILCOX UNIVERSAL, INC.; BABCOCK & WILCOX TECHNOLOGY, LLC
To: LIGHTSHIP CAPITAL LLC
Reel/Frame 043515/0001 →
SECURITY INTEREST Recorded Jul 27, 2015
From: DIAMOND POWER INTERNATIONAL, INC.
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 036188/0001 →
SECURITY INTEREST Recorded Jul 22, 2014
From: DIAMOND POWER INTERNATIONAL, INC.
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 033379/0483 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 15, 2013
From: WALUKIEWICZ, HENRY; MEHTA, ARUN; HABIB, TONY F.
To: DIAMOND POWER INTERNATIONAL, INC.
Reel/Frame 029631/0945 →