US 9,218,035 · App. 13/763,643 · Granted Dec 22, 2015

Renewable energy control systems and methods

Inventors: Tao Li (Gainesville, FL); Chao Li (Gainesville, FL)
Assignee: UNIVERSITY OF FLORIDA RESEARCH FOUNDATION, INC.
G06F1/263
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,218,035
App. No.
13/763,643
Granted
Dec 22, 2015
Kind
B2
Abstract

Various examples are provided for renewable energy control. In one example, among others, a system includes a PV source, a multi-core processor load, and a solar power manager configured to adjust an operating point of the PV source about a maximum power point by dynamically adjusting a transfer ratio and a load level. In another example, a method includes sensing an output current supplied to a multi-core processor load by a power converter at a first transfer ratio, sensing another output current supplied at a second transfer ratio, and determining an operating point of the PV source with respect to a maximum power point based upon the output currents. In another example, a system includes a power manager configured to switch servers between a renewable energy supply and a utility energy supply based at least in part upon a budget level and the load power consumption.

Claims (28)

1. A system, comprising:

at least one cluster including a plurality of servers; and

a power manager configured to switch at least a portion of the plurality of servers between a renewable energy supply (RES) and a utility energy supply based at least in part upon a budget level corresponding to an amount of power available from the RES and a load power consumption of the at least one cluster, where the power manager comprises a central switch controller configured to switch the at least a portion of the plurality of servers based upon a switch assignment determined by a switch scheduler based at least in part upon switching history and load history.

2. The system of claim 1 , wherein switching the at least a portion of the plurality of servers comprises virtual machine migration to move workload between servers.

3. The system of claim 1 , wherein switch assignment indicates that each of the plurality of servers is utility driven, RES driven, or shutdown.

4. The system of claim 1 , wherein switching of the at least a portion of the plurality of servers is initiated in response to a change in the amount of power available from the RES or the load power consumption of the at least one cluster exceeding a corresponding predefined threshold.

5. The system of claim 1 , wherein the power manager is configured to switch the at least a portion of the plurality of servers to smooth power fluctuation of RES powered servers.

6. The system of claim 1 , wherein the RES is a photovoltaic source or a wind-driven renewable energy source.

7. The system of claim 1 , wherein the switching history comprises a switching frequency of the server loads.

8. The system of claim 1 , wherein the switching history comprises switching outcomes of server loads.

9. The system of claim 1 , wherein the switch scheduler is configured to monitor a power provisioning status of loads on the plurality of servers.

10. A system, comprising:

at least one cluster including a plurality of servers; and

a power manager configured to switch at least a portion of the plurality of servers between a renewable energy supply (RES) and a utility energy supply based at least in part upon a budget level corresponding to an amount of power available from the RES and a load power consumption of the at least one cluster, where the power manager comprises a central switch controller configured to switch the at least a portion of the plurality of servers based upon a switch assignment determined by a switch scheduler that is configured to allocate switch operations of the switch assignment using a least recently used (LRU) scheme based at least in part upon a switching frequency of server loads.

11. The system of claim 10 , wherein allocation of the switch operations is based at least in part upon the switching frequency of the server loads during a preceding control period.

12. The system of claim 10 , wherein the switch operations are allocated based at least in part upon a quantity of servers in the at least one cluster.

13. A method, comprising:

determining a budget level corresponding to an amount of power available from a renewable energy supply (RES); and

switching server loads of at least one cluster of servers between the RES and a utility energy supply based at least in part the budget level and a load power consumption of the at least one cluster, where switch operations are allocated using a least recently used (LRU) scheme based at least in part upon a switching frequency of the server loads.

14. The method of claim 13 , wherein switching server loads of at least one cluster of servers comprises switching at least a portion of the plurality of servers between the RES and the utility energy supply.

15. The method of claim 14 , wherein a central switch controller is configured to switch the at least a portion of the plurality of servers.

16. The method of claim 14 , wherein the at least a portion of the plurality of servers are switched based upon a switch assignment that indicates whether each of the plurality of servers is utility driven, RES driven, or shutdown.

17. The method of claim 14 , wherein switching of the at least a portion of the plurality of servers is initiated in response to a change in the amount of power available from the RES or the load power consumption of the at least one cluster exceeding a corresponding predefined threshold.

18. The method of claim 14 , wherein the at least a portion of the plurality of servers is switched to smooth power fluctuation of RES powered servers.

19. The method of claim 13 , wherein switching server loads of at least one cluster of servers comprises virtual machine migration to move workload between servers.

20. The system of claim 13 , wherein the RES is a photovoltaic source or a wind-driven renewable energy source.

21. The method of claim 13 , wherein allocation of the switch operations is based at least in part upon the switching frequency of the server loads during a preceding control period.

22. The method of claim 13 , wherein the switch operations are allocated based at least in part upon a quantity of servers in the at least one cluster.

Assignments (2)
CONFIRMATORY LICENSE Recorded Jan 2, 2015
From: UNIVERSITY OF FLORIDA
To: NATIONAL SCIENCE FOUNDATION
Reel/Frame 034719/0249 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 9, 2013
From: LI, TAO; LI, CHAO
To: UNIVERSITY OF FLORIDA RESEARCH FOUNDATION, INC.
Reel/Frame 030179/0722 →
Continuity (2)
Provisional Application 61597545 · Feb 10, 2012
Related Publication 20130212410A1 · Aug 15, 2013