IP Library Granted Patent US 9,776,276
Granted Patent B2
US 9,776,276 · App. 13/812,642 · Granted Oct 3, 2017

Friction stir welding device

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,776,276
App. No.
13/812,642
Granted
Oct 3, 2017
Kind
B2
Abstract

A friction stir welding device ( 1 ) includes a workpiece disposition unit ( 2 ) at which workpieces (W) is disposed, a main body section ( 3 ) disposed at a surface (W 4 ) of the workpieces (W) disposed at the workpiece disposition unit ( 2 ), a tool holding unit ( 4 ) formed in the main body section ( 3 ) to enable advance and retreat in a direction facing the workpieces (Z), which is a direction approaching and separating from the workpieces (W) disposed at the workpiece disposition unit ( 2 ), and configured to hold a tool ( 100 ), and a support medium ( 5 ) formed to satisfy a predetermined relative positional relationship in the direction facing the workpieces (Z) with respect to a first shoulder surface of the tool ( 100 ) attached to the tool holding unit ( 4 ) and configured to support the tool holding unit ( 4 ) on the surface (W 4 ) of the workpieces (W) disposed at the workpieces disposition unit ( 2 ).

Claims (19)

1. A friction stir welding device for performing friction stir welding on workpieces, the friction stir welding device comprising:

a workpiece disposition unit at which the workpieces are disposed;

a main body section disposed at a surface side of the workpieces disposed at the workpiece disposition unit;

a tool having a first shoulder surface abutting surfaces of the workpieces and a second shoulder surface abutting rear surfaces of the workpieces;

a tool holding unit disposed within the main body section to enable advance and retreat in a direction facing the workpieces, which is a direction approaching and separating from the workpieces disposed at the workpiece disposition unit, the tool holding unit adapted to hold the tool such that the first shoulder surface of the tool has a relative positional relationship in a direction of advance and retreat of the tool holding unit with a support medium that is fixed to the tool holding unit such that an abutment section of the support medium abuts the surfaces of the workpieces, the support medium being configured to support the tool holding unit on the surfaces of the workpieces disposed at the workpiece disposition unit; and

a load applying unit including the tool holding unit, the load applying unit being disposed at the support medium and configured to apply a preset load toward the workpieces disposed at the workpiece disposition unit, wherein

the main body section is disposed above the workpieces disposed at the workpiece disposition unit, and supports the tool holding unit to enable advance and retreat in the direction of advance and retreat, which is a vertical direction, and which is the direction facing the workpieces,

the load applying unit also includes an auxiliary force applying section attached to the main body section and configured to apply an upward auxiliary force having a predetermined magnitude smaller than a weight of the tool and the tool holding unit, and configured to apply a load obtained by subtracting the upward auxiliary force from the weight of the tool attached to the tool holding unit and the tool holding unit as the preset load,

the auxiliary force applying section is an air cylinder that produces the auxiliary force by air pressure, and

the air pressure is not controlled while the friction stir welding is being performed so that the relative positional relationship in the direction of advance and retreat of the tool holding unit between the abutment section and the first shoulder surface does not change while the friction stir welding is being performed.

2. The friction stir welding device according to claim 1 , wherein

the tool holding unit is configured to hold the tool such that the first shoulder surface of the tool is set to coincide with a lower end surface of the abutment section in the direction of advance and retreat.

3. The friction stir welding device according to claim 1 , wherein the support medium is disposed in a direction perpendicular to a scanning direction of the tool with respect to the tool held by the tool holding unit.

4. The friction stir welding device according to claim 1 , wherein the support medium is arranged at a position so that the abutment section of the support medium, which abuts the surfaces of the workpieces, and the first shoulder surface of the tool held by the tool holding unit are aligned on a same surface along the surfaces of the workpieces.

5. The friction stir welding device according to claim 1 , wherein

the tool has a first shoulder section including the first shoulder surface, a shaft section protruding to enable advance and retreat from the first shoulder surface, and a second shoulder section attached to a front end of the shaft section and including the second shoulder surface, and

the tool holding unit has a pressing unit configured to apply a force to the shaft section in the direction facing the workpieces and press the rear surfaces of the workpieces using the second shoulder surface.

6. The friction stir welding device according to claim 1 , wherein

the tool holding unit is configured to hold the tool such that a position of the first shoulder surface of the tool is set to be different from a position of a lower end surface of the abutment section in the direction of advance and retreat.

Assignments (4)
CHANGE OF NAME Recorded Dec 14, 2023
From: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
To: MHI ENGINEERING, LTD.
Reel/Frame 066014/0774 →
NUNC PRO TUNC ASSIGNMENT Recorded Dec 14, 2023
From: MHI ENGINEERING, LTD.
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 066014/0870 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 2, 2018
From: MITSUBISHI HEAVY INDUSTRIES, LTD.
To: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
Reel/Frame 046537/0203 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 28, 2013
From: KATO, YOSHINORI; FURUTATE, SATOSHI; KINOSHITA, TOSHIYUKI
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 029704/0292 →