IP Library Granted Patent US 9,721,724
Granted Patent B2
US 9,721,724 · App. 13/822,659 · Granted Aug 1, 2017

Method for producing R-T-B sintered magnet

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,721,724
App. No.
13/822,659
Granted
Aug 1, 2017
Kind
B2
Abstract

[Problem] To provide a highly efficient manufacturing method including an RH supply-diffusion process by which the number of magnets processed at a time can be increased without allowing sintered R-T-B based magnets to stick to holding members. [Solution] A method for producing a sintered R-T-B based magnet including the steps of: forming a stack of RH diffusion sources and sintered R-T-B based magnet bodies by stacking the diffusion sources and the magnet bodies alternately with a holding member having openings interposed; and carrying out an RH supply-diffusion process by loading the stack into a process vessel and creating an atmosphere with a pressure of 0.1 Pa to 50 Pa and a temperature of 800° C. to 950° C. within the process vessel.

Claims (7)

1. A method for producing a sintered R-T-B based magnet, the method comprising the steps of:

forming a stack of RH diffusion sources (which are made of a metal or alloy, of which at least 80 at % is a heavy rare-earth element RH that is at least one of Dy and Tb) and sintered R-T-B based magnet bodies (where R is at least one of the rare-earth elements and T is at least one of the transition metal elements and always includes Fe) by stacking the diffusion sources and the magnet bodies alternately with a holding member having openings interposed;

carrying out an RH supply-diffusion process by loading the stack into a process vessel and creating an atmosphere with a pressure of 0.3 Pa to 50 Pa and a temperature of 800° C. to 950° C. within the process vessel, wherein throughout the RH supply-diffusion process, the pressure is maintained between 0.3 Pa to 50 Pa and the temperature is maintained between 800° C. to 950° C.; and

carrying out an RH diffusion process by creating an atmosphere with a pressure of 200 Pa to 2 kPa and a temperature of 800° C. to 950° C. in the process vessel after the RH supply-diffusion process has been carried out, wherein throughout the RH diffusion process, the pressure is maintained between 200 Pa to 2 kPa and the temperature is maintained between 800° C. to 950° C.

2. The method of claim 1 , wherein the holding member has a thickness of 0.1 mm to 4 mm.

3. The method of claim 1 , further comprising decreasing the temperature in the process vessel to 500° C. at a cooling rate of 1° C. per minute to 15° C. per minute after either the RH supply-diffusion process or the RH diffusion process has been carried out.

4. The method of claim 1 , wherein the process vessel is evacuated using a rotary pump with or without a mechanical booster pump.

Assignments (2)
CHANGE OF NAME Recorded Dec 27, 2023
From: HITACHI METALS, LTD.
To: PROTERIAL, LTD.
Reel/Frame 066130/0563 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 13, 2013
From: OBATA, TOHRU
To: HITACHI METALS, LTD.
Reel/Frame 029982/0900 →