Patent No.
US 8,817,444
App. No.
13/823,570
Granted
Aug 26, 2014
Kind
B2
Abstract

A control arrangement for a circuit breaker station includes a central control system and, for each of the circuit breakers, a circuit breaker operating unit connected to the central control system to obtain switching instructions and to the respective circuit breaker to control the operation thereof. The central control system and the circuit breaker operating units each have a local clock that are synchronized with one another. The central control system is, during use, arranged to calculate a point of time for switching each of the circuit breakers based on measured voltages, currents, and circuit breaker positions, and to send the point of time in a switching instruction to the circuit breaker operating unit. Each of the circuit breaker operating units is arranged to switch the circuit breaker, to which it is connected, at the point of time which is received in the switching instruction from the central control system.

Claims (27)

1. A control arrangement for a circuit breaker station including a plurality of circuit breakers, voltage measuring devices for measuring bus bar voltages, current measuring devices for measuring currents through the circuit breakers, and, for each circuit breaker, a circuit breaker position indicating device for indicating the position of the circuit breaker, the control arrangement comprising:

a central control system for the overall control of the circuit breaker station, the central control system being, during use, connected to the voltage measuring devices, current measuring devices, and circuit breaker position indicating devices to obtain measured voltages, currents, and circuit breaker positions; and

for each of the circuit breakers, a circuit breaker operating unit connected, during use, to the central control system to obtain switching instructions, and to the respective circuit breaker to control the operation thereof, wherein

the central control system and the circuit breaker operating units have each a local clock, wherein all clocks are synchronized with one another;

the central control system is, during use, arranged to calculate a point of time for switching each of the circuit breakers based on the obtained measured voltages, currents, and circuit breaker positions, and earlier operating times for the circuit breaker, and to send said point of time in a switching instruction to said circuit breaker operating unit; and

each of the circuit breaker operating units is, during use, arranged to switch the circuit breaker, to which it is connected, at the point of time which is received in the switching instruction from the central control system.

2. The control arrangement of claim 1 wherein

the central control system is, during use, arranged to calculate a point of time for closing each of the circuit breakers based on the obtained measured voltages, currents, and circuit breaker positions, and earlier operating times for said switching operations, and to send said point of time in a circuit breaker closing instruction to said circuit breaker operating unit; and

each of the circuit breaker operating units is, during use, arranged to close the circuit breaker, to which it is connected, at the point of time which is received in the closing instruction from the central control system.

3. The control arrangement of claim 1 wherein at least one of the circuit breaker operating units is, during use, arranged to switch the circuit breaker, to which it is connected, to connect or disconnect an ac harmonic filter, a shunt capacitor bank, a shunt reactor, a transformer, or a transmission line.

4. The control arrangement of claim 1 wherein at least one of the circuit breaker operating units is, during use, arranged to switch the circuit breaker at voltage zero crossing.

5. The control arrangement of claim 1 wherein the central control system and the circuit breaker operating units are connected via a process fieldbus system.

6. The control arrangement of claim 5 wherein said process fieldbus system is an IEC61850 system, optionally provided with precision time protocol, or an EtherCat system.

7. The control arrangement of claim 1 wherein the circuit breaker operating units are each an TED or an I/O board.

8. The control arrangement of claim 1 wherein the circuit breaker operating units are each arranged within the circuit breaker to which it is connected, in a junction box, or in a control room.

9. A circuit breaker station comprising the control arrangement of claim 1 .

10. An HVDC system comprising the circuit breaker station of claim 9 .

11. The control arrangement of claim 2 wherein at least one of the circuit breaker operating units is, during use, arranged to switch the circuit breaker, to which it is connected, to connect or disconnect an ac harmonic filter, a shunt capacitor bank, a shunt reactor, a transformer, or a transmission line.

12. The control arrangement of claim 2 wherein at least one of the circuit breaker operating units is, during use, arranged to switch the circuit breaker at voltage zero crossing.

13. The control arrangement of claim 3 wherein at least one of the circuit breaker operating units is, during use, arranged to switch the circuit breaker at voltage zero crossing.

14. The control arrangement of claim 2 wherein the central control system and the circuit breaker operating units are connected via a process fieldbus system.

15. The control arrangement of claim 3 wherein the central control system and the circuit breaker operating units are connected via a process fieldbus system.

16. The control arrangement of claim 4 wherein the central control system and the circuit breaker operating units are connected via a process fieldbus system.

17. The control arrangement of claim 2 wherein the circuit breaker operating units are each an IED or an I/O board.

18. The control arrangement of claim 3 wherein the circuit breaker operating units are each an IED or an I/O board.

19. The control arrangement of claim 4 wherein the circuit breaker operating units are each an IED or an I/O board.

20. The control arrangement of claim 5 wherein the circuit breaker operating units are each an IED or an I/O board.

Assignments (6)
MERGER Recorded Nov 13, 2023
From: HITACHI ENERGY SWITZERLAND AG
To: HITACHI ENERGY LTD
Reel/Frame 065549/0576 →
CORRECTIVE ASSIGNMENT TO CORRECT THE CONVEYING PARTY "ABB TECHNOLOGY LTD."SHOULD READ"ABB TECHNOLOGY AG" PREVIOUSLY RECORDED AT REEL: 040622 FRAME: 0076. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded May 11, 2022
From: ABB TECHNOLOGY AG
To: ABB SCHWEIZ AG
Reel/Frame 059927/0929 →
CHANGE OF NAME Recorded Dec 31, 2021
From: ABB POWER GRIDS SWITZERLAND AG
To: HITACHI ENERGY SWITZERLAND AG
Reel/Frame 058666/0540 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 6, 2020
From: ABB SCHWEIZ AG
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 052916/0001 →
MERGER Recorded Nov 15, 2016
From: ABB TECHNOLOGY LTD.
To: ABB SCHWEIZ AG
Reel/Frame 040622/0076 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 3, 2013
From: BJORKLUND, HANS
To: ABB TECHNOLOGY AG
Reel/Frame 030143/0767 →