US 8,912,676 · App. 13/823,614 · Granted Dec 16, 2014

Wind energy installation and method for operating a wind energy installation with temperature monitoring for the transformer

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,912,676
App. No.
13/823,614
Granted
Dec 16, 2014
Kind
B2
Abstract

A wind turbine having a generator for generating electrical energy and a transformer is disclosed. The transformer is designed to receive electrical energy from the generator on a secondary side and to discharge said electrical energy again on a primary side at a higher voltage. The wind turbine also comprises a temperature monitoring means for the transformer. The voltage supply to the temperature monitoring means is fed from the primary side of the transformer. The temperature monitoring means is thereby independent of the control system of the wind turbine. The temperature monitoring means reduces the risk of the transformer overheating. A method for operating such a wind turbine is also disclosed.

Claims (15)

1. A wind energy installation comprising a generator configured to generate electrical energy, a transformer configured to receive electrical energy from the generator on a secondary side and to output said electrical energy at a higher voltage on a primary side, and a temperature-monitoring system for the transformer, wherein the voltage supply for the temperature-monitoring system is fed from the primary side of the transformer.

2. The wind energy installation of claim 1 , comprising a voltage transformer configured to convert the voltage present on the primary side of the transformer into a suitable auxiliary operating voltage for the temperature-monitoring system.

3. The wind energy installation of claim 1 , wherein the temperature-monitoring system comprises a PTC thermistor and a PTC thermistor triggering device.

4. The wind energy installation of claim 1 , wherein the temperature-monitoring system is configured to isolate the primary side of the transformer from the mains in response to a predefined temperature limit value being exceeded.

5. The wind energy installation of claim 1 , wherein the temperature-monitoring system is configured to put a cooling system for the transformer into operation in response to a predefined temperature limit value being exceeded.

6. The wind energy installation of claim 1 , wherein a temperature sensor of the temperature-monitoring system is arranged in a region of the transformer in which the voltage is lower than on the primary side of the transformer.

7. The wind energy installation of claim 1 , wherein a temperature sensor of the temperature-monitoring system is arranged at the core of the transformer.

8. The wind energy installation of claim 1 , comprising a measuring device for the voltage on the primary side of the transformer and wherein the voltage supply for the measuring device is fed from the primary side of the transformer.

9. The wind energy installation of claim 1 , comprising a second temperature-monitoring system and wherein the second temperature-monitoring system is connected to the control system of the wind energy installation.

10. The wind energy installation of claim 9 , wherein the first temperature-monitoring means-and the second temperature-monitoring system are active in parallel when the wind energy installation is in operation.

11. The wind energy installation of claim 10 , wherein a higher temperature limit value is assigned to the first temperature-monitoring system than to the second temperature-monitoring system.

12. A method for operating a wind energy installation having a generator configured to generate electrical energy and a transformer configured to receive electrical energy from the generator on a secondary side and to output said electrical energy at a higher voltage on a primary side comprising:

tapping off the voltage on the primary side of the transformer;

converting the voltage into a lower auxiliary operating voltage; and

operating a temperature-monitoring system for the transformer using the auxiliary operating voltage.

Assignments (8)
CHANGE OF ADDRESS Recorded Aug 31, 2023
From: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
To: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
Reel/Frame 064834/0873 →
CHANGE OF NAME Recorded Oct 20, 2022
From: SENVION DEUTSCHLAND GMBH
To: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
Reel/Frame 064371/0624 →
CHANGE OF NAME Recorded Sep 16, 2022
From: SENVION GMBH
To: SENVION DEUTSCHLAND GMBH
Reel/Frame 061462/0567 →
CHANGE OF NAME Recorded Aug 3, 2022
From: SENVION AG
To: SENVION GMBH
Reel/Frame 061068/0001 →
CHANGE OF NAME Recorded Jul 18, 2022
From: SENVION SE
To: SENVION AG
Reel/Frame 060692/0328 →
CHANGE OF NAME Recorded Jan 23, 2015
From: REPOWER SYSTEMS SE
To: SENVION SE
Reel/Frame 034806/0074 →
CHANGE OF NAME Recorded Nov 5, 2014
From: REPOWER SYSTEMS SE
To: SENVION SE
Reel/Frame 034163/0555 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2014
From: MATZEN, BJOERN; NIETMANN, LARS; BOETTGER, JAN; SCHLURICKE, SEBASTIAN
To: REPOWER SYSTEMS SE
Reel/Frame 031890/0759 →