Control circuit and method for converters of wind turbines

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,934,270
App. No.
13/824,255
Granted
Jan 13, 2015
Kind
B2
Abstract

Controlling a converter of a wind turbine is disclosed. The converter is connected to a rotor of a doubly fed asynchronous generator in order to feed electrical energy into an electric network. The converter comprises a network-side inverter, a generator-side inverter, and a controller, which outputs target values for demanded reactive power to at least one of the inverters. A reactive power target signal is determined for the portion that the network-side inverter contributes to the demanded reactive power Q T , a slip signal is determined from the frequency of the network and the rotational speed of the generator, a gain value is calculated according to the slip signal, and the gain value is modified according to the reactive power target signal for the network-side inverter. The distribution of the reactive power between the two inverters is thus optimized over a wide operating range, not only at individual predetermined operating points.

Claims (30)

1. A method for controlling a converter of a wind turbine, the converter connected to a rotor of a doubly fed asynchronous generator in order to feed electrical energy into an electrical network and comprising a network-side inverter, a generator-side inverter and a controller configured to output setpoints for demanded reactive power to at least one of the inverters comprising:

determining a reactive power setpoint signal for a portion that one of the inverters contributes to the demanded reactive power,

determining a slip signal from a frequency of the network and a rotational speed of the generator,

calculating a gain value as a function of the slip signal, and

modifying the reactive power setpoint signal for the one of the inverters using the gain value.

2. The method of claim 1 , comprising using an opposite of the reactive power setpoint signal for the other of the inverters.

3. The method of claim 1 , comprising calculating of the gain value using an equivalent function.

4. The method of claim 3 , comprising using a quadratic function as the equivalent function.

5. The method of claim 3 , comprising calling up the gain value from a look-up table.

6. The method of claim 4 , comprising taking additional correction terms into account.

7. The method of claim 1 ,

comprising

calculating the gain value based on node points.

8. The method of claim 7 , comprising linearizing using spline functions between the node points.

9. The method of claim 1 , comprising determining the gain value such that the network-side inverter is fully used in a rotational speed range down to the lower synchronous range, the machine-side inverter is fully used from the bottom to the top end of the synchronous range, and the machine-side inverter is partially used above the upper synchronous range.

10. The method of claim 9 , comprising increasing the gain value, at high values of the slip signal.

11. The method of claim 1 , comprising carrying out the modification by multiplication.

12. The method of claim 1 , comprising carrying out the reactive power calculation based on the current on the basis of a fixed voltage.

13. A wind turbine comprising:

a wind rotor,

a doubly fed asynchronous generator driven by the wind rotor, and

a converter comprising a network-side inverter, a generator-side inverter and at least one converter controller configured to feed electrical energy into a network,

wherein the controller is configured to apply setpoints for demanded reactive power to at least one of the inverters and comprises

a calculation unit configured to determine the contribution of one of the inverters to the demanded reactive power,

a gain block configured to calculate a gain value as a function of an applied slip signal, and

a modulator configured to modify the gain value determined by the gain block onto a reactive power setpoint signal determined by the calculation unit for the one of the inverters.

14. The wind turbine of claim 13 , wherein the converter with its controller is configured to carry out the method of claim 2 .

15. The method of claim 9 , comprising increasing the gain value at high values of the slip signal above the top end of the slip region.

16. The method of claim 9 , comprising increasing the gain value at high values of the slip signal up to the maximum.

17. The method of claim 1 , comprising carrying out the reactive power calculation based on the current on the basis of a fixed voltage comprising the lower tolerance voltage.

Assignments (8)
REQUEST FOR ASSIGNEE ADDRESS CHANGE. Recorded Sep 5, 2025
From: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
To: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
Reel/Frame 072597/0865 →
CHANGE OF NAME Recorded Jan 28, 2025
From: SENVION DEUTSCHLAND GMBH
To: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
Reel/Frame 070031/0577 →
CHANGE OF NAME Recorded Jan 21, 2025
From: SENVION GMBH
To: SENVION DEUTSCHLAND GMBH
Reel/Frame 069986/0450 →
CHANGE OF NAME Recorded Jan 15, 2025
From: SENVION AG
To: SENVION GMBH
Reel/Frame 069924/0352 →
CHANGE OF NAME Recorded Jan 8, 2025
From: SENVION SE
To: SENVION AG
Reel/Frame 069849/0638 →
CHANGE OF NAME Recorded Jan 23, 2015
From: REPOWER SYSTEMS SE
To: SENVION SE
Reel/Frame 034806/0074 →
CHANGE OF NAME Recorded Nov 13, 2014
From: REPOWER SYSTEMS SE
To: SENVION SE
Reel/Frame 034233/0056 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 26, 2014
From: LETAS, HEINZ-HERMANN
To: REPOWER SYSTEMS SE
Reel/Frame 032303/0517 →