IP Library Granted Patent US 9,344,025
Granted Patent B2
US 9,344,025 · App. 13/824,271 · Granted May 17, 2016

Wind farm and method for operating a wind farm

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,344,025
App. No.
13/824,271
Granted
May 17, 2016
Kind
B2
Abstract

A method for operating a wind farm and to a wind farm is disclosed. When a wind farm and the wind energy installations involve target values for the reactive power being prescribed by a farm regulatory device, said target values for the reactive power ignored by the control units when controlling the respective wind energy installation in the event of a power supply system fault in the power supply system. Only when the power supply system fault has been rectified are said target values considered by the control units again for controlling the respective wind energy installation.

Claims (15)

1. A method for operating a wind farm with a plurality of wind energy installations connected to a grid internal to the wind farm, each with its own control unit for considering setpoint values for the reactive power, a transfer point at which the power generated in the wind farm is passed from the grid internal to the wind farm to a supply grid, and with a farm regulatory device for regulating the setpoint values for the reactive power connected with the control units of the wind energy installations, comprising:

when a grid fault in the supply grid occurs, freezing the setpoint values for the reactive power in the farm regulatory device and not considering by the control units the setpoint values for the reactive power of the farm regulatory device in controlling the wind energy installation, and

after the grid fault in the supply grid has ended, considering by the control units the setpoint values for the reactive power of the farm regulatory device in controlling the wind energy installation on the basis of the frozen values.

2. The method of claim 1 , wherein when a grid fault is detected, the setpoint values for the reactive power are frozen without delay.

3. The method claim 1 , wherein an I-branch is provided in the control system for the setpoint values for the reactive power, whose control error is set to zero or held constant after the grid fault was ended.

4. The method of claim 1 , wherein after the grid fault has ended, a reset delay is maintained.

5. The method of claim 1 , wherein the setpoint values for the reactive power are present in the form of setpoint values for reactive power or setpoint values of voltage.

6. The method of claim 1 , wherein a drop in the voltage at the transfer point is recognized as a grid fault of the supply grid.

7. A wind farm comprising:

a plurality of wind energy installations connected to a grid internal to the wind farm, each with its own control unit for considering setpoint values for the reactive power,

a transfer point at which the electrical energy generated in the wind farm is passed from the grid internal to the wind farm to a supply grid, and

a farm regulatory device for regulating the setpoint values for the reactive power connected with the control units of the wind energy installations, wherein the farm regulatory device is configured such that when a grid fault occurs in the supply grid the farm regulatory device freezes the setpoint values for the reactive power, and after the grid fault in the supply grid has ended, the farm regulatory device continues the regulation on the basis of the frozen values,

wherein the control units are configured such that when a grid fault occurs, the setpoint values for the reactive power of the farm regulatory device are not considered in controlling the wind energy installation and in that after the grid fault has ended, the setpoint values for the reactive power of the farm regulatory device are considered in controlling the wind energy installation.

8. The wind farm of claim 7 , wherein the farm regulatory device is configured such that when a grid fault occurs in the supply grid the setpoint values for the reactive power are frozen without delay.

9. The method of claim 1 , wherein after the grid fault has ended, a reset delay between 0 and 200 ms is maintained.

Assignments (7)
CHANGE OF ADDRESS Recorded Aug 31, 2023
From: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
To: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
Reel/Frame 064834/0873 →
CHANGE OF NAME Recorded Oct 20, 2022
From: SENVION DEUTSCHLAND GMBH
To: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
Reel/Frame 064371/0624 →
CHANGE OF NAME Recorded Sep 16, 2022
From: SENVION GMBH
To: SENVION DEUTSCHLAND GMBH
Reel/Frame 061462/0567 →
CHANGE OF NAME Recorded Aug 3, 2022
From: SENVION AG
To: SENVION GMBH
Reel/Frame 061068/0001 →
CHANGE OF NAME Recorded Jul 18, 2022
From: SENVION SE
To: SENVION AG
Reel/Frame 060692/0328 →
CHANGE OF NAME Recorded Jan 23, 2015
From: REPOWER SYSTEMS SE
To: SENVION SE
Reel/Frame 034806/0074 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 31, 2014
From: BLUHM, ROMAN; FORTMANN, JENS
To: REPOWER SYSTEMS SE
Reel/Frame 032100/0525 →