IP Library Granted Patent US 9,347,999
Granted Patent B2
US 9,347,999 · App. 13/827,041 · Granted May 24, 2016

Methods and systems for warning users of a degraded backup capacity in battery plants

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,347,999
App. No.
13/827,041
Granted
May 24, 2016
Kind
B2
Abstract

A method of warning a user when a reserve time of a battery plant in a system is substantially degraded is disclosed. The method includes determining a baseline capacity for the battery plant by estimating the reserve time of the battery plant while the battery plant is installed in the system, subsequently determining a present capacity of the battery plant by estimating the reserve time of the battery plant while the battery plant is installed in the system, comparing the present capacity with the baseline capacity, and generating a warning when the baseline capacity exceeds the present capacity by more than a defined amount. Example embodiments of systems and control circuits configured to perform the methods are also disclosed herein.

Claims (24)

1. A method of warning a user when a backup capacity of a battery plant in a system is substantially degraded, the method comprising:

determining a baseline capacity for the battery plant by estimating a reserve time of the battery plant while the battery plant is installed in the system a plurality of times during a period to generate a plurality of reserve times and using a largest reserve time of the plurality of reserve times to set the baseline capacity;

determining a present capacity of the battery plant by estimating the reserve time of the battery plant while the battery plant is installed in the system;

comparing the present capacity with the baseline capacity; and

generating a warning when the baseline capacity exceeds the present capacity by more than a defined amount.

2. The method of claim 1 wherein using the largest reserve time of the plurality of reserve times to set the baseline capacity includes setting the baseline capacity to equal the largest reserve time.

3. The method of claim 2 wherein the period is about 183 days.

4. The method of claim 2 wherein determining the present capacity includes determining the present capacity after the period.

5. The method of claim 2 wherein generating includes generating the warning when the present capacity is less than N times the baseline capacity, where 0<N<1.

6. The method of claim 5 wherein N is 0.8.

7. The method of claim 1 wherein the reserve time is a time 'til empty (TTE) of the battery plant.

8. The method of claim 1 wherein the battery plant includes one or more batteries.

9. The method of claim 1 wherein estimating includes estimating the reserve time of the battery plant while the battery plant is discharging.

10. A non-transitory computer readable medium storing computer-executable instructions for warning a user when a backup capacity of a battery plant in a system is substantially degraded, the instructions configured to determine a baseline capacity for the battery plant by estimating a reserve time of the battery plant while the battery plant is installed in the system a plurality of times during a period to generate a plurality of reserve times and using a largest reserve time of the plurality of reserve times to set the baseline capacity, determine a present capacity of the battery plant by estimating the reserve time of the battery plant while the battery plant is installed in the system, compare the present capacity with the baseline capacity, and generate a warning when the baseline capacity exceeds the present capacity by more than a defined amount.

11. A system for warning a user when a backup capacity of a battery plant is substantially degraded, the system comprising a power plant including a main power supply for providing power to a load and a battery plant coupled to the main power supply, the battery plant including one or more batteries for providing power to the load when the main power supply is inoperable, and a control circuit coupled to the power plant and configured to determine a baseline capacity for the battery plant by estimating a reserve time of the battery plant while the battery plant is installed in the system a plurality of times during a period to generate a plurality of reserve times and using a largest reserve time of the plurality of reserve times to set the baseline capacity, determine a present capacity of the battery plant by estimating the reserve time of the battery plant while the battery plant is installed in the system, compare the present capacity with the baseline capacity, and generate a warning when the baseline capacity exceeds the present capacity by more than a defined amount.

12. The system of claim 11 further comprising a sensor coupled to the power plant, the sensor configured to sense a parameter of the system to estimate the reserve time.

13. The system of claim 12 wherein the sensed parameter is a sensed battery plant voltage or a sensed output current.

14. The system of claim 13 further comprising a sensor configured to sense an output current of the system, wherein the control circuit is configured to determine the baseline capacity and the present capacity from the estimated reserve time and the sensed output current.

15. The system of claim 14 wherein the main power supply includes a rectifier.

16. The system of claim 11 wherein the control circuit is positioned in a first city and the power plant is positioned in a second city different than the first city.

17. The system of claim 11 wherein the control circuit is positioned in a first building and the power plant is positioned in a second building different than the first building.

18. The system of claim 11 wherein the reserve time is a time 'til empty (TTE) of the battery plant.

19. The system of claim 11 wherein the control circuit is configured to set the baseline capacity to equal the largest reserve time.

20. The system of claim 19 wherein the control circuit is configured to determine the present capacity after the period.

Assignments (10)
SECURITY INTEREST Recorded Oct 26, 2021
From: VERTIV CORPORATION; VERTIV IT SYSTEMS, INC.; ELECTRICAL RELIABILITY SERVICES, INC.; ENERGY LABS, INC.
To: UMB BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 057923/0782 →
SECURITY AGREEMENT Recorded Mar 3, 2020
From: ELECTRICAL RELIABILITY SERVICES, INC.; ENERGY LABS, INC.; VERTIV CORPORATION; VERTIV IT SYSTEMS, INC.
To: CITIBANK, N.A.
Reel/Frame 052076/0874 →
RELEASE OF SECURITY INTEREST Recorded Mar 2, 2020
From: JPMORGAN CHASE BANK, N.A.
To: VERTIV CORPORATION (F/K/A ALBER CORP.); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT CORPORATION); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT FREMONT, LLC); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT HUNTSVILLE, LLC); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT REDMOND CORP.); ELECTRICAL RELIABILITY SERVICES, INC.; VERTIV CORPORATION (F/K/A EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.); VERTIV CORPORATION (F/K/A LIEBERT CORPORATION)
Reel/Frame 052065/0666 →
RELEASE OF SECURITY INTEREST Recorded Mar 2, 2020
From: THE BANK OF NEW YORK MELLON TRUST COMPANY N.A.
To: VERTIV CORPORATION; VERTIV IT SYSTEMS, INC.; ELECTRICAL RELIABILITY SERVICES, INC.
Reel/Frame 052071/0913 →
MERGER Recorded Feb 5, 2020
From: VERTIV ENERGY SYSTEMS, INC.
To: VERTIV CORPORATION
Reel/Frame 051830/0692 →
SECOND LIEN SECURITY AGREEMENT Recorded Jun 10, 2019
From: VERTIV IT SYSTEMS, INC.; VERTIV CORPORATION; VERTIV NORTH AMERICA, INC.; ELECTRICAL RELIABILITY SERVICES, INC.; VERTIV ENERGY SYSTEMS, INC.
To: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A.
Reel/Frame 049415/0262 →
CHANGE OF NAME Recorded May 16, 2017
From: EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.
To: VERTIV ENERGY SYSTEMS, INC.
Reel/Frame 042469/0671 →
SECURITY AGREEMENT Recorded Dec 2, 2016
From: ALBER CORP.; ASCO POWER TECHNOLOGIES, L.P.; AVOCENT CORPORATION; AVOCENT FREMONT, LLC; AVOCENT HUNTSVILLE, LLC; AVOCENT REDMOND CORP.; ELECTRICAL RELIABILITY SERVICES, INC.; EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.; LIEBERT CORPORATION; LIEBERT NORTH AMERICA, INC.; NORTHERN TECHNOLOGIES, INC.
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 040797/0615 →
SECURITY AGREEMENT Recorded Dec 1, 2016
From: ALBER CORP.; ASCO POWER TECHNOLOGIES, L.P.; AVOCENT CORPORATION; AVOCENT FREMONT, LLC; AVOCENT HUNTSVILLE, LLC; AVOCENT REDMOND CORP.; ELECTRICAL RELIABILITY SERVICES, INC.; EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.; LIEBERT CORPORATION; LIEBERT NORTH AMERICA, INC.; NORTHERN TECHNOLOGIES, INC.
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 040783/0148 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 15, 2013
From: ESSI, DAVID FERRIS, III
To: EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.
Reel/Frame 030424/0025 →