US 8,962,088 · App. 13/836,419 · Granted Feb 24, 2015

Method and finish for concrete walls

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,962,088
App. No.
13/836,419
Granted
Feb 24, 2015
Kind
B2
Abstract

A method for forming a uniform texture concrete wall using Shotcrete or other pneumatically projected concrete materials. The method generally includes forming an exterior face mixture from a concrete mixture wherein the large aggregates are removed such that when the face mixture is pneumatically applied to a base structure, the face mixture defines a uniform surface.

Claims (36)

1. A method of forming a concrete wall, the method comprising the steps of:

providing a wall form;

pneumatically projecting a first shotcrete concrete mixture in a non-hydrated state onto the wall form to construct a base concrete layer;

providing a second concrete mixture including large aggregate and small aggregate;

removing the large aggregate from the second concrete mixture to define a face concrete mixture; and

applying the face concrete mixture to the base concrete layer while the base concrete layer is in the non-hydrated state.

2. The method recited in claim 1 , wherein the face mixture is applied within four hours after the base concrete layer is formed.

3. The method recited in claim 1 , wherein the face mixture is applied within one hour after the base concrete layer is formed.

4. The method recited in claim 1 , wherein the step of providing the second concrete mixture includes forming the second concrete mixture from the first shotcrete concrete mixture.

5. The method recited in claim 1 , wherein the step of providing the second concrete mixture includes forming the second concrete mixture independent of the first shotcrete concrete mixture.

6. The method recited in claim 1 , further comprising the steps of:

pouring a foundation upon which the base concrete layer is constructed;

installing rebar within the form; and

installing at least one wire gauge to control the depth of the base concrete layer.

7. The method recited in claim 1 , further comprising the step of adding at least one of a coloring agent, sand, cement, an aggregate, a polymer, a bonder or an admixture to the face mixture.

8. The method recited in claim 1 , wherein the face mixture is pneumatically applied to the base concrete layer.

9. The method recited in claim 1 , wherein the face mixture is applied to the base mixture by hand.

10. The method recited in claim 1 , further comprising the step of broadcasting sands and aggregates toward the face mixture.

11. The method recited in claim 1 , further comprising the steps of:

allowing the face mixture and base concrete layer to harden to define a concrete wall; and

exposing the wall.

12. A method of forming a concrete wall, the method comprising the steps of:

providing a wall form;

pneumatically projecting a first shotcrete concrete mixture in a non-hydrated state onto the form to construct a base concrete layer, the first shotcrete concrete mixture including a combination of large aggregate and small aggregate;

providing a face mixture formed independent of large aggregate, wherein providing the face mixture includes removing large aggregate from a second concrete mixture including large aggregate and small aggregate; and

applying the face mixture onto the base concrete layer while the base concrete layer is in the non-hydrated state.

13. The method of claim 12 , wherein the second concrete mixture is formed from the first shotcrete concrete mixture.

14. The method of claim 12 , wherein the second concrete mixture is formed independent of the first shotcrete concrete mixture.

15. The method recited in claim 12 , further comprising the steps of:

pouring a foundation upon which the base concrete layer is constructed;

installing rebar within the form; and

installing at least one wire gauge to control the depth of the base concrete layer.

16. The method recited in claim 12 , further comprising the step of adding at least one of a coloring agent, sand, cement, an aggregate, a polymer, a bonder or an admixture to the face mixture.

17. The method recited in claim 12 , wherein the face mixture is pneumatically applied to the base concrete layer.

18. The method recited in claim 12 , wherein the face mixture is applied to the base mixture by hand.

19. The method recited in claim 12 , further comprising the step of broadcasting sands and aggregates toward the face mixture.

Assignments (3)
CHANGE OF NAME Recorded Jul 9, 2019
From: SHAW CRAFTSMAN CONCRETE, LLC
To: SHAW CRAFTSMEN CONCRETE, LLC
Reel/Frame 049706/0350 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 3, 2019
From: LITHOCRETE, INC.
To: SHAW CRAFTSMAN CONCRETE, LLC
Reel/Frame 049667/0102 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 22, 2013
From: SHAW, RONALD D.
To: LITHOCRETE, INC.
Reel/Frame 031456/0491 →