IP Library Granted Patent US 9,303,620
Granted Patent B2
US 9,303,620 · App. 13/859,018 · Granted Apr 5, 2016

Installation/dismounting of a hub to/from a nacelle of a wind turbine by using a blade pitch angle adjustment device of the hub for orientating the hub

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,303,620
App. No.
13/859,018
Granted
Apr 5, 2016
Kind
B2
Abstract

Disclosed is a holding device for holding a hub to be installed at a nacelle. The holding device includes a carrier element with a first connection interface configured to connect the holding device to a lifting system, and a second connection interface configured to connect the device to a blade pitch bearing of the hub. Further disclosed is a pitch operating device for operating a blade pitch angle adjustment device of a hub to be mounted to a nacelle. The pitch operating device includes an actuating unit and a power interface for connecting the pitch operating device to the blade pitch angle adjustment device. Further disclosed is a hub installation system including such a holding device and such a pitch operating device. Further, a method for installing a hub at a nacelle and a method for dismounting a hub from a nacelle are described.

Claims (11)

1. A hub installation system for installing a hub at a nacelle of a wind turbine, the hub having a plurality of sockets for accepting turbine blades, each socket having a blade pitch bearing, and each blade pitch bearing having a predetermined 3D geometry that mates with a corresponding predetermined 3D geometry of a turbine blade root, the hub installation system comprising:

a hub holding device to be installed at the nacelle of the wind turbine, the hub holding device comprising:

a carrier element having a first end and a second end;

a first connection interface arranged at the first end and configured to connect the hub holding device to a lifting system; and

a second connection interface arranged at the second end having a 3D geometry corresponding to the predetermined 3D geometry of the turbine blade root designed to mate with the blade pitch bearings of the hub and

a pitch operating device for operating a blade pitch angle adjustment device of the hub which is dismounted from the nacelle of the wind turbine, the pitch operating device comprising;

an actuating unit; and

a power interface for connecting the pitch operating device to the blade pitch angle adjustment device, wherein the power interface is configured for transferring energy being provided by the actuating unit to the blade pitch angle adjustment device in order to activate the blade pitch angle adjustment device while the hub is being carried or held prior to mounting of rotor blades.

2. The hub installation system as claimed in claim 1 , wherein the carrier element comprises a curved structure.

3. The hub installation system as claimed in claim 2 , wherein the curved structure of the carrier element is configured in such a manner that when the hub is mounted to the hub holding device and the hub holding device is carried by the lifting system such that the hub is suspended in air, the center of gravity of the hub is located on an axis being defined by the direction of a tension force within the lifting system.

4. The hub installation system as claimed in claim 1 , the pitch operating device further comprising an energy source, which is connected to the actuating unit and which is configured for providing energy being used by the actuating unit.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2019
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS GAMESA RENEWABLE ENERGY A/S
Reel/Frame 048003/0631 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 26, 2013
From: FALKENBERG, PETER LOEVENSKJOLD
To: SIEMENS WIND POWER A/S
Reel/Frame 031078/0147 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 26, 2013
From: SIEMENS WIND POWER A/S/
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 031078/0171 →