IP Library Granted Patent US 9,599,999
Granted Patent B2
US 9,599,999 · App. 13/904,108 · Granted Mar 21, 2017

Method for early detection and anticipatory control of consumer-end load shedding in an electrical grid, and apparatus for carrying out the method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,599,999
App. No.
13/904,108
Granted
Mar 21, 2017
Kind
B2
Abstract

A method for early detection and anticipatory control of consumer-end load shedding in a single-phase or polyphase electrical grid supplied with single phase or polyphase by at least one generator driven by at least one rotating machine includes measuring a current and a voltage between the at least one generator and the electrical grid and/or a current and a voltage in the electrical grid, deriving at least one signal from the measured current and voltage and using the at least one derived signal to act on the at least one rotating machine.

Claims (30)

1. A method for early detection and anticipatory control of consumer-end load shedding in a single-phase or polyphase electrical grid supplied with single phase or polyphase by at least one generator driven by at least one rotating machine, the method comprising:

measuring a current and a voltage, the current and the voltage being measured between the at least one generator and the electrical grid, in the electrical grid or at both locations;

deriving at least one signal from the measured current and voltage;

using the at least one derived signal and a gradient signal generated from the at least one derived signal to at least partially reduce a load on the at least one rotating machine,

wherein the at least one derived signal and the gradient signal are sent to a regulator of emitted power of the at least one rotating machine so as to influence a power output of the at least one rotating machine during a load shedding in the grid; and

subsequently matching a generation of and demand for electric power.

2. The method as recited in claim 1 , wherein at least partially reducing the load includes controlling a power output of the at least one rotating machine using an actuator connected to the regulator, wherein the at least one rotating machine is a turbine.

3. The method as recited in claim 2 , wherein the turbine is a steam turbine, and wherein the controlling includes controlling a supply of steam to the turbine.

4. The method as recited in claim 2 , wherein the turbine is part of a gas turbine, and wherein the controlling includes controlling a supply of at least one of fuel and combustion air to the gas turbine.

5. The method as recited in claim 2 , further comprising amplifying the at least one derived signal in an output stage before the at least one derived signal is sent to the regulator.

6. A method for early detection and anticipatory control of consumer-end load shedding in a single-phase or polyphase electrical grid supplied with single phase or polyphase by at least one generator driven by at least one rotating machine, the method comprising:

measuring a current and a voltage, the current and the voltage being measured between the at least one generator and the electrical grid, in the electrical grid or at both locations;

deriving at least one electrical variable from the measured current and the measured voltage;

calculating a rate of change of the at least one electrical variable; and

using the at least one derived electrical variable and the rate of change of the at least one electrical variable to at least partially reduce a load on the at least one rotating machine,

wherein the at least one derived signal is used as soon as the calculated rate of change overshoots or undershoots a threshold value.

7. The method as recited in claim 6 , wherein the at least one electrical variable includes at least one of a real power, a real current and a reactive power and a reactive current, and wherein the calculated rate of change includes at least one of a real power gradient, a real current gradient, a reactive current gradient, a reactive power gradient and a rotation speed gradient.

8. The method as recited in claim 7 , further comprising computing a plurality of threshold value signals by comparing a calculated rate of change of at least one of one of the reactive current and the reactive power with a respective threshold value; and wherein the deriving the at least one signal is performed by logically linking the plurality of threshold signals to one another in an evaluation unit based on a structure of the electrical grid.

9. A method for early detection and anticipatory control of consumer-end load shedding in a single-phase or polyphase electrical grid supplied with single phase or polyphase by at least one generator driven by at least one rotating machine, the method comprising:

measuring a current and a voltage, the current and the voltage being measured between the at least one generator and the electrical grid, in the electrical grid or at both locations;

deriving at least one signal from the measured current and voltage; and

obtaining at least one electrical variable for the detection of the load shedding and a rotation speed gradient of a rotor of the at least one rotating machine from the measured current and voltage; and

using the at least one electrical variable and the rotation speed gradient of the rotor to generate a load reduction signal for controlling the at least one rotating machine.

10. The method as recited in claim 9 , further comprising calculating an expected acceleration from an instantaneous power and a mass moment of inertia of the rotor.

11. A method for early detection and anticipatory control of consumer-end load shedding in a single-phase or polyphase electrical grid supplied with single phase or polyphase by at least one generator driven by a plurality of rotating machines, the method comprising:

measuring a current and a voltage, the current and the voltage being measured between the at least one generator and the electrical grid, in the electrical grid or at both locations;

deriving at least one signal from the measured current and voltage; and

using the at least one derived signal and a gradient signal generated from the at least one derived signal to at least partially reduce a load on each of the rotating machines,

wherein the plurality of rotating machines are configured to drive a plurality of generators, and

wherein the at least one derived signal is used to influence power generated by the plurality of rotating machines in response to a load shedding of the electrical grid.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 16, 2017
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: ANSALDO ENERGIA IP UK LIMITED
Reel/Frame 041731/0626 →
CHANGE OF NAME Recorded Mar 22, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 038216/0193 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 29, 2013
From: MEIER, MARCEL; STOCKMANN, CHRISTIAN; LIEBIG, ERHARD; TABORDA, JOSE
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 030500/0178 →