IP Library Granted Patent US 9,490,490
Granted Patent B2
US 9,490,490 · App. 13/905,383 · Granted Nov 8, 2016

Measurement device and method for determining fuel cell stack size variations

Inventors: John Matthew Fisher (San Jose, CA); David Higdon (Sunnyvale, CA); Peter Andersen (Sunnyvale, CA); Kevin Cheung (Union City, CA)
Assignee: BLOOM ENERGY CORPORATION
H01M8/04H01M8/04544H01M8/2465G01R31/3627Y02E60/50
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,490,490
App. No.
13/905,383
Granted
Nov 8, 2016
Kind
B2
Abstract

A measurement device for measuring voltages along a linear array of voltage sources, such as a fuel cell stack, includes at least one movable voltage probe that measures voltage transitions along an array element. The measured voltage is used to determine a distance of travel of the at least one voltage probe along the fuel cell stack from the speed of the probe and the timing of the transitions.

Claims (51)

1. A method of testing a fuel cell stack, comprising:

moving at least one voltage probe along the fuel cell stack;

sequentially measuring a voltage of fuel cell stack elements, the elements comprising fuel cells, interconnects disposed between the fuel cells, and seals disposed between the fuel cells and the interconnects; and

determining, from the sequentially measured voltage, at least one of a height of the fuel cell stack, a variation of fuel cell height, a fuel cell stack element pitch, and seal shrinkage or setting.

2. The method of claim 1 , wherein the determining comprises determining the seal shrinkage or setting before sintering and conditioning the fuel cell stack, after sintering and conditioning the fuel cell stack, or both before and after sintering and conditioning the fuel cell stack.

3. The method of claim 1 , wherein the determining comprises determining the shrinkage or setting.

4. The method of claim 1 , wherein the determining comprises determining the fuel cell stack element pitch.

5. The method of claim 1 , wherein the determining comprises determining the variation of fuel cell height.

6. The method of claim 1 , wherein the determining comprises determining the height of the fuel cell stack.

7. The method of claim 1 , wherein the sequentially measuring a voltage comprises sequentially measuring a voltage before sintering and conditioning the fuel cell stack.

8. The method of claim 1 , wherein the sequentially measuring a voltage comprises sequentially measuring a voltage after at least one of sintering and conditioning the fuel cell stack.

9. The method of claim 1 , wherein the sequentially measuring a voltage comprises sequentially measuring a voltage generated by operating the fuel cell stack.

10. The method of claim 1 , wherein the sequentially measuring a voltage comprises sequentially measuring a voltage applied to fuel cell stack elements from a voltage source.

11. The method of claim 1 , wherein the moving at least one voltage probe along the fuel cell stack comprises moving the at least one voltage probe in contact with the fuel cell stack.

12. The method of claim 1 , wherein the fuel cell stack is oriented vertically and wherein moving at least one voltage probe along the fuel cell stack comprises moving at least two vertically offset voltage probes along the fuel cell stack.

13. The method of claim 1 , wherein the determining comprises:

obtaining a speed of the at least one voltage probe moving along the fuel cell stack;

detecting a time interval of a transition from a first voltage to a second voltage and from the second voltage to the first voltage; and

determining a distance of travel of the at least one voltage probe along the fuel cell stack from the speed and the time interval.

14. A fuel cell system comprising:

a fuel cell stack comprising fuel cell stack elements, the elements comprising fuel cells, interconnects disposed between the fuel cells, and seals disposed between the fuel cells and the interconnects;

a measuring device comprising at least one movable voltage probe that is configured to perform operations comprising:

moving at least one voltage probe along the fuel cell stack;

sequentially measuring a voltage of the fuel cell stack elements; and

determining, from the sequentially measured voltage, at least one of a height of the fuel cell stack, a variation of fuel cell height, a fuel cell stack element pitch, and seal shrinkage or setting.

15. The system of claim 14 , wherein the determining comprises determining the seal shrinkage or setting before sintering and conditioning the fuel cell stack, after sintering and conditioning the fuel cell stack, or both before and after sintering and conditioning the fuel cell stack.

16. The system of claim 14 , wherein the determining comprises determining the fuel cell stack element pitch.

17. The system of claim 14 , wherein the determining comprises determining the variation of fuel cell height.

18. The system of claim 14 , wherein the determining comprises determining the height of the fuel cell stack.

19. The system of claim 14 , wherein the sequentially measuring a voltage comprises sequentially measuring a voltage applied to the fuel cell stack elements from a voltage source, before sintering and conditioning the fuel cell stack.

20. The system of claim 14 , wherein the sequentially measuring a voltage comprises sequentially measuring a voltage generated by operating the fuel cell stack, after at least one of sintering and conditioning the fuel cell stack.

21. The system of claim 14 , wherein the moving at least one voltage probe along the fuel cell stack comprises moving the at least one voltage probe in contact with the fuel cell stack.

22. The system of claim 14 , wherein the fuel cell stack is oriented vertically and wherein the at least one voltage probe comprises at least two vertically offset voltage probes.

23. A fuel cell system comprising:

a fuel cell stack comprising fuel cell stack elements;

a measuring device comprising at least one movable voltage probe that is configured to perform operations comprising:

moving at least one voltage probe along the fuel cell stack;

sequentially measuring a voltage of the fuel cell stack elements; and

determining at least one dimensional value of the fuel cell stack or the fuel cell stack elements from the sequentially measured voltage,

wherein the measuring device further comprises a processor, wherein the operation of determining the at least one dimensional value of the fuel cell stack or the fuel cell stack elements from the sequential voltage measurements is performed by the processor, and wherein the processor is configured to:

obtain a speed of the at least one voltage probe moving along the fuel cell stack;

detect a time interval of a transition from a first voltage to a second voltage and from the second voltage to the first voltage; and

determine a distance of travel of the at least one voltage probe along the fuel cell stack from the speed and the time interval.

24. A method of testing a fuel cell stack, comprising:

moving at least one voltage probe along the fuel cell stack;

sequentially measuring a voltage of fuel cell stack elements, the elements comprising fuel cells, interconnects disposed between the fuel cells, and seals disposed between the fuel cells and the interconnects; and

determining, from the sequentially measured voltage, at least one of a height of the fuel cell stack, a variation of fuel cell height, a fuel cell stack element pitch, and seal shrinkage or setting,

wherein the determining comprises:

obtaining a speed of the at least one voltage probe moving along the fuel cell stack;

detecting a time interval of a transition from a first voltage to a second voltage and from the second voltage to the first voltage; and

determining a distance of travel of the at least one voltage probe along the fuel cell stack from the speed and the time interval.

Assignments (3)
RELEASE OF SECURITY INTEREST Recorded Nov 29, 2018
From: U.S. BANK NATIONAL ASSOCIATION, AS COLLATERAL AGENT
To: BLOOM ENERGY CORPORATION
Reel/Frame 047686/0121 →
SECURITY INTEREST Recorded Dec 15, 2015
From: BLOOM ENERGY CORPORATION
To: U.S. BANK NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 037301/0093 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 5, 2013
From: FISHER, JOHN MATTHEW; HIGDON, DAVID; ANDERSEN, PETER; CHEUNG, KEVIN
To: BLOOM ENERGY CORPORATION
Reel/Frame 031145/0466 →
Continuity (1)
Related Publication 20140354290A1 · Dec 4, 2014