IP Library Granted Patent US 10,260,347
Granted Patent B2
US 10,260,347 · App. 13/913,849 · Granted Apr 16, 2019

Steam supply circuit from a turbine

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,260,347
App. No.
13/913,849
Granted
Apr 16, 2019
Kind
B2
Abstract

The technical field of the invention is steam turbines including a steam feed circuit based on a functional steam generator set that may be nuclear- or fossil-fuel powered, and in particular a steam feed circuit ( 1 ) of a turbine ( 2 ), comprising n main steam lines ( 3 ) and n′ steam admission lines ( 4 ) to the turbine, the number n′ of steam admission lines ( 4 ) to the turbine being strictly greater than the number n of main steam lines ( 3 ), characterized in that there are n direct steam admission lines ( 5 ) to the turbine linking the as main steam lines ( 3 ) directly to the steam admission lines ( 4 ) to the turbine.

Claims (11)

1. A steam feed circuit of a turbine comprising n main steam lines in parallel and n′ steam admission lines to the turbine in parallel, the number n′ of the steam admission lines to the turbine being strictly greater than the number n of the main steam lines diverting from a steam generator;

wherein there are n direct steam admission lines directly connected to each of the main steam lines; and

n′−n indirect steam admission lines configured to receive at least a portion of steam from each of the n main steam lines and provide the received steam to the turbine and also to at least one feed line enabling a device other than the turbine to be supplied with steam.

2. The steam feed circuit according to claim 1 , wherein each of the n main steam lines are directly connected to a steam generator.

3. The steam feed circuit according to claim 1 , wherein each of the n′ steam admission lines are directly connected to a first stage of the turbine.

4. The steam feed circuit according to claim 1 , wherein the n′−n indirect steam admission lines are configured to receive at least a portion of steam from at least one of the n direct steam admission lines via at least one diverted steam line tapped onto said at least one of the n direct steam admission line.

5. The steam feed circuit according to claim 4 , wherein the at least one diverted steam line is configured to supply team to other auxiliary steam users.

6. The steam feed circuit according to claim 1 , wherein n is between 2 and 6 and/or n′ is between 3 and 8.

7. The steam feed circuit according to claim 1 , wherein n′=n+1.

8. The steam feed circuit according to claim 4 , wherein the indirect steam admission lines are fed by n diverted steam lines tapped onto the n respective direct steam admission lines to the turbine.

9. The steam feed circuit according to claim 1 , wherein n′=n+2.

Assignments (5)
MERGER Recorded Mar 21, 2025
From: ARABELLE TECHNOLOGIES
To: ARABELLE SOLUTIONS FRANCE
Reel/Frame 070587/0348 →
NUNC PRO TUNC ASSIGNMENT Recorded Nov 26, 2024
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: POWER SOLUTIONS GAMMA FRANCE
Reel/Frame 069450/0966 →
CHANGE OF NAME Recorded Nov 26, 2024
From: POWER SOLUTIONS GAMMA FRANCE
To: ARABELLE TECHNOLOGIES
Reel/Frame 069451/0916 →
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 10, 2013
From: JOURDAIN, VINCENT; VIOLA, BERNARD; MILET, DAMIEN
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 031171/0643 →