IP Library Granted Patent US 8,866,323
Granted Patent B2
US 8,866,323 · App. 13/917,919 · Granted Oct 21, 2014

Method and arrangement for responding to a grid event, such as fast under frequency combining demand response, inertial response and spinning reserve

Inventor: Kaj Skov Nielsen (Issaquah, WA)
Assignee: Siemens Aktiengesellschaft
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,866,323
App. No.
13/917,919
Granted
Oct 21, 2014
Kind
B2
Abstract

A method for controlling a wind power plant in case of a frequency drop in a utility grid to which the wind turbines are connected is provided. The method includes combining demand response, inertial response and spinning reserve for given wind speeds in order for wind power plants to deliver fast aggregate under frequency response for a wide wind speed range with minimal recovery time and minimal production loss at each wind speed.

Claims (52)

1. A method for controlling a wind turbine, when a frequency drop in a utility grid to which the wind turbine is connected exists, the method comprising:

increasing power extraction from a rotating rotor of the wind turbine; and simultaneously

decreasing a power demand of the wind turbine from a nominal power demand,

wherein a net power output of the wind turbine to the utility grid is increased.

2. The method according to claim 1 , further comprising:

receiving a command to increase the net power output of the wind turbine by a required amount;

determining that a maximal decrease of the power demand is smaller than the required amount;

decreasing the power demand of the wind turbine by the maximal decrease of the power demand; and

increasing the power extraction from the rotating rotor such that the required amount equals the increased net power output.

3. The method according to claim 1 , wherein increasing the power extraction from the rotating rotor results in a decreasing a rotational speed of the rotor from a nominal rotational speed to a rotational speed lower than the nominal rotational speed.

4. The method according to claim 1 , further comprising:

operating the wind turbine at a wind speed range,

extracting power from the rotating rotor to an amount being 5% to 10% below an available power extraction for the given wind speed,

receiving a command to increase the net power output of the wind turbine by a required amount,

determining that a maximal decrease of the power demand is smaller than the required amount,

decreasing the power demand of the wind turbine from the grid by the maximal decrease of the power demand, and

increasing the extracting the power from the rotating rotor such that the required amount equals the increased net power output.

5. The method according to claim 4 , wherein the wind speed range is between 5 m/s and 12 m/s.

6. The method according to claim 4 , wherein the wind speed range is between 23 m/s and 30 m/s.

7. The method according to claim 1 ,

wherein a demand reduction capacity information indicative of the maximal decrease of the power demand for an operational condition is accessed and is processed for controlling the wind turbine.

8. The method according to claim 1 ,

wherein an inertial capacity information indicative of a maximal increase of power extraction, between 5% and 10% of an actual power extraction, from the rotating rotor for an operational condition is accessed and is processed for controlling the wind turbine.

9. The method according to claim 3 ,

wherein a recovery time information about a recovery time to recover from a rotational speed loss to the nominal rotational speed, for an operational condition, is accessed and is processed for controlling the wind turbine.

10. The method according to claim 9 ,

wherein, depending on a required increase of the net power output, an amount of decreasing the power demand of the wind turbine and an amount of increasing the power extraction from the rotating rotor is determined based on the recovery time information for controlling the wind turbine, in order to minimize the recovery time.

11. The method according to claim 1 ,

wherein the controlling is based on a combination of a demand reduction capacity information, an inertial response capacity information and a recovery time information.

12. The method according to claim 1 ,

wherein the decreasing the power demand of the wind turbine from the utility grid, comprises decreasing power demand of an electrical wind turbine device selected from the group consisting of:

a de-icing system for de-icing a rotor blade of the wind turbine,

a heating system,

a cooling system for cooling a mechanical and/or electrical component of the wind turbine,

a lighting system,

a yaw motor for orienting the wind turbine relative to the wind direction,

hydraulics for moving a component of the wind turbine,

an uninterruptible power supply system, and

a pump circulating cooling liquids or cooling liquids.

13. The method according to claim 1 , further comprising:

supplying a control signal to a converter connected to a generator of the wind turbine causing the converter to increase a torque exerted on the rotating rotor to increase the power extraction from a rotating rotor.

14. The method according to claim 1 ,

adapted for controlling a plurality of wind turbines.

15. An arrangement for controlling a wind turbine when a frequency drop in a utility grid to which the wind turbine is connected occurs, the arrangement being adapted:

to increase power extraction from a rotating rotor of the wind turbine, and simultaneously, and

to decrease a power demand of the wind turbine from a nominal power demand,

thereby increasing a net power output of the wind turbine to the utility grid.

16. The arrangement according to claim 15 , further comprising:

a converter connected to a generator and adapted to cause the generator to increase a torque acting on the rotor in order to increase the power extraction, and

a power supply system adapted for controlling a power supply from the utility grid to a wind turbine electrical component, in order to decrease a power demand of the wind turbine.

17. The arrangement according to claim 15 , which is adapted for controlling a wind turbine:

to perform a function for automatically establishing the needed level of spinning reserve for each individual wind turbine in order to deliver the specified fast frequency response during under frequency events for the given wind conditions at the wind power plant.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2019
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS GAMESA RENEWABLE ENERGY A/S
Reel/Frame 048003/0631 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 25, 2013
From: NIELSEN, KAJ SKOV
To: SIEMENS WIND POWER A/S
Reel/Frame 030876/0144 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 25, 2013
From: SIEMENS WIND POWER A/S
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 030876/0233 →
Continuity (1)
Related Publication 20140001758A1 · Jan 2, 2014